oil reservoir
Recently Published Documents


TOTAL DOCUMENTS

2165
(FIVE YEARS 580)

H-INDEX

45
(FIVE YEARS 8)

Author(s):  
Zhizeng Xia ◽  
Xuewu Wang ◽  
Rui Xu ◽  
Weiwei Ren

AbstractTight oil reservoirs have poor physical properties, and the problems including rapid oil rate decline and low oil recovery degree are quite common after volume fracturing. To obtain a general understanding of tight oil reservoir production improvement by CO2 huff ‘n’ puff, the high-pressure physical properties of typical tight oil samples are measured. Combining the typical reservoir parameters, the production characteristics of the tight oil reservoir developed by the CO2 huff ‘n’ puff are numerically studied on the basis of highly fitted experimental results. The results show that: (1) during the natural depletion stage, the oil production rate decreases rapidly and the oil recovery degree is low because of the decrease in oil displacement energy and the increase in fluid seepage resistance. (2) CO2 huff ‘n’ puff can improve the development effect of tight oil reservoirs by supplementing reservoir energy and improving oil mobility, but the development effect gradually worsens with increasing cycle number. (3) The earlier the CO2 injection timing is, the better the development effect of the tight reservoir is, but the less sufficient natural energy utilization is. When carrying out CO2 stimulation, full use should be made of the natural energy, and the appropriate injection timing should be determined by comprehensively considering the formation-saturation pressure difference and oil production rate. The research results are helpful for strengthening the understanding of the production characteristics of tight oil reservoirs developed by CO2 huff ‘n’ puff.


Author(s):  
Shivangi Patidar

Abstract: This paper is about the new automatic technique of inbuilt hydraulic jack system. Whenever the tire failure is occurred in the vehicle then to lifting the vehicle from ground surface is the very difficult think for human being and also, huge human effort required and more time taking process. There, this inbuilt hydraulic jack system helps to lift the vehicle from the ground instead of conventional mechanical jack, and saves the time and excess effort. Separate buttons are provided in order to raise or lower the right and left side jacks. By pushing the given button in the dashboard, the inbuilt self-jacking component gets initiated. Main parts of this project are hydraulic jack, master cylinder, valves, manifold, and oil reservoir. The inbuilt hydraulic jack will be valuable to the senior residents and for women who discover it incredibly hard to work the jack physically in any breakdown of the vehicle. This hydraulic jack will have the option to lift the wheels as indicated by our prerequisite that is on the off chance that we need to lift just two wheels, at that point it tends to be finished by moving the cylinder as needs be on the rack with the assistance of the DC motor. Index Terms: Hydraulic Jack, Master Cylinder, Incompressible Hydraulic Oil, Pascal’s Law


2021 ◽  
Vol 54 (2F) ◽  
pp. 22-35
Author(s):  
Haider Mahmood ◽  
Omar Al-Fatlawi

The paper generates a geological model of a giant Middle East oil reservoir, the model constructed based on the field data of 161 wells. The main aim of the paper was to recognize the value of the reservoir to investigate the feasibility of working on the reservoir modeling prior to the final decision of the investment for further development of this oilfield. Well log, deviation survey, 2D/3D interpreted seismic structural maps, facies, and core test were utilized to construct the developed geological model based on comprehensive interpretation and correlation processes using the PETREL platform. The geological model mainly aims to estimate stock-tank oil initially in place of the reservoir. In addition, three scenarios were applied based on sensitivity and uncertainty of five variables to determine an accurate estimation of stock-tank oil initially in place of the reservoir. The oil-water contact appeared to be the major uncertain parameter for stock-tank oil initially in place estimation because the available geological and field data was not enough to demonstrate it confidently, and only 13% of the total wells have penetrated the water zone in the Mishrif formation. The results of all scenarios indicate that the reservoir has huge stock-tank oil initially in place. The importance of developing this oilfield is validated by its very high stock-tank oil. This is where the value of this study becomes obvious.


Author(s):  
Xiaolong Chai ◽  
Mengyuan Zhang ◽  
Leng Tian ◽  
Zhuangming Shi ◽  
Hengli Wang ◽  
...  

2021 ◽  
Author(s):  
Yong Yang ◽  
Xiaodong Li ◽  
Changwei Sun ◽  
Yuanzhi Liu ◽  
Renkai Jiang ◽  
...  

Abstract The problem of water production in carbonate reservoir is always a worldwide problem; meanwhile, in heavy oil reservoir with bottom water, rapid water breakthrough or high water cut is the development feature of this kind of reservoir; the problem of high water production in infill wells in old reservoir area is very common. Each of these three kinds of problems is difficult to be tackled for oilfield developers. When these three kinds of problems occur in a well, the difficulty of water shutoff can be imagined. Excessive water production will not only reduce the oil rate of wells, but also increase the cost of water treatment, and even lead to well shut in. Therefore, how to solve the problem of produced water from infill wells in old area of heavy oil reservoir with bottom water in carbonate rock will be the focus of this paper. This paper elaborates the application of continuous pack-off particles with ICD screen (CPI) technology in infill wells newly put into production in brown field of Liuhua, South China Sea. Liuhua oilfield is a biohermal limestone heavy oil reservoir with strong bottom water. At present, the recovery is only 11%, and the comprehensive water cut is as high as 96%. Excessive water production greatly reduces the hydrocarbon production of the oil well, which makes the production of the oilfield decrease rapidly. In order to delay the decline of oil production, Liuhua oilfield has adopted the mainstream water shutoff technology, including chemical and mechanical water shutoff methods. The application results show that the adaptability of mainstream water shutoff technology in Liuhua oilfield needs to be improved. Although CPI has achieved good water shutoff effect in the development and old wells in block 3 of Liuhua oilfield, there is no application case in the old area of Liuhua oilfield which has been developed for decades, so the application effect is still unclear. At present, the average water cut of new infill wells in the old area reaches 80% when commissioned and rises rapidly to more than 90% one month later. Considering that there is more remaining oil distribution in the old area of Liuhua oilfield and the obvious effect of CPI in block 3, it is decided to apply CPI in infill well X of old area for well completion. CPI is based on the ICD screen radial high-speed fluid containment and pack-off particles in the wellbore annulus to prevent fluid channeling axially, thus achieving well bore water shutoff and oil enhancement. As for the application in fractured reef limestone reservoir, the CPI not only has the function of wellbore water shutoff, but also fills the continuous pack-off particles into the natural fractures in the formation, so as to achieve dual water shutoff in wellbore and fractures, and further enhance the effect of water shutoff and oil enhancement. The target well X is located in the old area of Liuhua oilfield, which is a new infill well in the old area. This target well with three kinds of water problems has great risk of rapid water breakthrough. Since 2010, 7 infill wells have been put into operation in this area, and the water cut after commissioning is 68.5%~92.6%. The average water cut is 85.11% and the average oil rate is 930.92 BPD. After CPI completion in well X, the water cut is only 26% (1/3 of offset wells) and the oil rate is 1300BPD (39.6% higher than that of offset wells). The target well has achieved remarkable effect of reducing water and increasing oil. In addition, in the actual construction process, a total of 47.4m3 particles were pumped into the well, which is equivalent to 2.3 times of the theoretical volume of the annulus between the screen and the borehole wall. Among them, 20m3 continuous pack-off particles entered the annulus, and 27.4m3 continuous pack-off particles entered the natural fractures in the formation. Through the analysis of CPI completed wells in Liuhua oilfield, it is found out that the overfilling quantity is positively correlated to the effect of water shutoff and oil enhancement.


2021 ◽  
Author(s):  
Javier Franquet ◽  
A. N. Martin ◽  
Viraj Telaj ◽  
Hamad Khairy ◽  
Ahmed Soliman ◽  
...  

Abstract The objective of this work was to quantify the in-situ stress contrast between the reservoir and the surrounding dense carbonate layers above and below for accurate hydraulic fracturing propagation modelling and precise fracture containment prediction. The goal was to design an optimum reservoir stimulation treatment in a Lower Cretaceous tight oil reservoir without fracturing the lower dense zone and communicating the high-permeability reservoir below. This case study came from Abu Dhabi onshore where a vertical pilot hole was drilled to perform in-situ stress testing to design a horizontal multi-stage hydraulic fractured well in a 35-ft thick reservoir. The in-situ stress tests were obtained using a wireline straddle packer microfrac tool able to measure formation breakdown and fracture closure pressures in multiple zones across the dense and reservoir layers. Standard dual-packer micro-injection tests were conducted to measure stresses in reservoir layers while single-packer sleeve-frac tests were done to breakdown high-stress dense layers. The pressure versus time was monitored in real-time to make prompt geoscience decisions during the acquisition of the data. The formation breakdown and fracture closure pressures were utilized to calibrated minimum and maximum lateral tectonic strains for accurate in-situ stress profile. Then, the calibrated stress profile was used to simulate fracture propagation and containment for the subsequent reservoir stimulation design. A total 17 microfrac stress tests were completed in 13 testing points across the vertical pilot, 12 with dual-packer injection and 5 with single-packer sleeve fracturing inflation. The fracture closure results showed stronger stress contrast towards the lower dense zone (900 psi) in comparison with the upper dense zone (600 psi). These measurements enabled the oilfield operating company to place the lateral well in a lower section of the tight reservoir without the risk of fracturing out-of-zone. The novelty of this in-situ stress testing consisted of single packer inflations (sleeve frac) in an 8½-in hole in order to achieve higher differential pressures (7,000 psi) to breakdown the dense zones. The single packer breakdown permitted fracture propagation and reliable closure measurements with dual-packer injection at a lower differential reopening pressure (4,500 psi). Microfracturing the tight formation prior to fluid sampling produced clean oil samples with 80% reduction of pump out time in comparison to conventional straddle packer sampling operations. This was a breakthrough operational outcome in sampling this reservoir.


Sign in / Sign up

Export Citation Format

Share Document