scholarly journals Study of the work of a self-propelled mulcher in the preparation of forest soils for planting poplar in the conditions of Bulgaria

2021 ◽  
Vol 875 (1) ◽  
pp. 012006
Author(s):  
S Glushkov ◽  
P I Popikov ◽  
S V Malyukov ◽  
V Chakarov ◽  
D Boyadzhiev

Abstract The article describes the use of mulcher technology in forestry for the care of forest crops, removal of overgrowth under power lines, in the right-of-way of gas and oil pipelines, railways and highways. With the help of mulchers, they create fire strips in the forest, make clearings. Mulchers clean fallen trees after fires, floods and hurricanes. They are involved in landscaping and agricultural work. The article examines the work of the PT-400 self-propelled tillage mulcher for the surface crushing of logging waste on the utilized poplar plantations of the Oryakhovsky state forestry in Bulgaria. The work of the Rotor Ferri S stump grinder was studied when crushing poplar stumps with a diameter of up to 50 cm. The hourly productivity of these machines at various operations was determined, and also the process of crushing stumps and felling residues by fractional composition was studied. The work of the mulcher was compared with the bulldozer technology and the mounted tractor stump grinder Rotor Ferri S. It was concluded that the mounted stump grinder Rotor Ferri S is the most suitable machine for grinding poplar stumps of any diameter, since its productivity significantly exceeds that of the PT-400 mulcher/tiller. The load on the tractor is minimal, which saves energy. At the same time, mulching technology is very effective and in demand.

Author(s):  
David Ehrenfeld

On all but one of the field trips in my Field Ecology course, I take my students to the sorts of places that they have been to before: the beach, the pinelands, the Highlands forest, farms, old fields, streams, salt marshes, suburbs. But on the third trip, after the ones to the campus and to the experimental plots at Hutcheson Forest, we go to a place that is, for all its superficial familiarity, altogether different and exotic. This trip is to America’s deserted empire, what the person who knew it best, ecologist Frank Egler, described as the Right of way Domain. Right-of-way land comprises at least fifty to seventy-five million acres in the United States, an area larger than New England. It is disposed as long strips of property along railroad tracks, roads, and canals; under power lines; and above buried pipelines. Many of these rights-of-way, even those in heavily populated areas, are scarcely ever visited by people—they are cut off from human presence by fences, no-trespassing signs, patrolling police, dense vegetation, and a scarcity of reasons to set foot in them. True, some abandoned rights-of-way have been put to use. The tow-path and adjacent land along the old Delaware–Raritan Canal, which winds its way for many miles through central New Jersey, has become a very long, very narrow, very popular state park. Indeed, this is the park that has helped protect the forest along the Millstone River, which I de-scribed earlier. Hunters love the rights-of-way under power lines, which attract deer and small game. And disused railroad lines have been turned into foot and bike trails in several parts of the country. But many rights-of-way, totaling a huge amount of land, go for months or years without feeling a human step or hearing a human voice. These places are them-selves neither urban nor suburban nor rural; neither settled nor wilder-ness. They are a quintessential part of what author James Howard Kunstler has called “the geography of nowhere.” In my right-of-way trip we start with a boggy strip of land above a transcontinental gas pipeline.


2020 ◽  
Vol 164 ◽  
pp. 07030
Author(s):  
Elena Popova

The article reflects the results of anthropogenic impact on phytocenoses of the territory of the Uporovsky regional nature reserve (Uporovsky district, Tyumen region, Russia). On the territory of the Uporovsky regional nature reserve (Uporovsky district, Tyumen region) there is a 110 kV electrical power transmission line (power line) which has the length of 8 kilometers and the right-of-way width of about 30 meters. This power line is undoubtedly the main source of anthropogenic electromagnetic radiation in this area. The degree of participation of individual species in the herbage was determined by taking into account their relative abundance. When exposed to the power lines in the right-of-way area, flora biodiversity decreases due to the loss of a number of species. The effect of electromagnetic fields causes transformation of the vegetation cover, synanthropization and the subsequent complete destruction of natural vegetation. To determine the degree of anthropogenic load on the studied phytocenoses, the synanthropization index is determined. In the synanthropic fraction of the flora, 30 species belonging to 12 families were identified. The synanthropization index of the studied phytocenoses ranges from 6.6% to 81.2%. The largest number of synanthropic species is observed in the anthropogenic area.


Author(s):  
Julian Javier Corrales Cobos

Abstract The development of third world countries is surrounded by a thousand challenges, one of them is to increase and modernize the transport infrastructure to improve competitiveness in an increasingly interconnected world. Colombia in recent years has undertaken a titanic task of construction of highways to meet this purpose, have hired more than 8170 km of roads, however, this task generates a major challenge for the oil industry since the construction of these roads generates an unplanned interference with the hydrocarbon transport infrastructure that, if not handled correctly, can cause ruptures or damage in the pipelines and the consequent economic and environmental losses. In 2015 the design of the highway that interconnects the municipalities of Remedios and Caucasia in the department of Antioquia began. This project was called Autopistas del Nordeste. The road was designed to pass through the Pocune river valley, however, the environmental licensing of this type of project requires the revision of the interference with other networks. It was found that the new road crossed the Ocensa pipeline at 26 points. The geographical conditions require the use of this small corridor by many lines, 2 pipelines (Ocensa and ODC), a 500 KV power line and, of course, the current tertiary route and the projected highway that connects these municipalities. The challenge is huge, in this article the project is described, the negotiation stages that have been necessary to carry out with the way to make compatible the projects and the threats that have been overcome in the constructive stage.


Author(s):  
Nataliia Kharytonova ◽  
Olha Mykolaienko ◽  
Tetyana Lozova

Greening of roads contributes to the protection of roads and their elements from influence of adverse weather and climatic factors; it includes the measures for improvement and landscaping of roads, ensures the protection of roadside areas from transport pollution, provides visual orientation of drivers. The solution of these issues will ensure creation and maintenance of safe and comfortable conditions for travelers. Green plantings in the right-of-way road area include woody, bushy, flower and grass vegetation of natural and artificial origin. For proper operation of public roads and satisfaction of other needs of the industry, there may be the need in removing the greenery. The reason for the removal of greenery in the right-of-way road area may be due to the following factors: construction of the architectural object, widening of the motor road, repair works in the security zone of overhead power lines, water supply, drainage, heating, telecommunications facilities, cutting of hazardous, dry and fautal trees, as well as self-grown and brushwood trees with a root neck diameter not exceeding 5 cm, elimination of the consequences of natural disasters and emergencies. The removal of plantations in the right-of-way area is executed in order to ensure traffic safety conditions and to improve the quality of plantations composition and their protective properties. Nowadays, in Ukraine there is no clear procedure for issuing permits for removing of such plantations. In order to resolve this issue, there is a need in determining the list of regulations in the area of forest resources of Ukraine and, if needed, the list of regulatory acts that have to be improved; to prepare a draft of the regulatory legal act that would establish the procedure of plantations cutting, the methodology of their condition determination, recovery costs determination, the features of cutting. Keywords: plantations, cutting, right-of-way, woodcutting permit, order.


1985 ◽  
Vol 61 (1) ◽  
pp. 222-222
Author(s):  
John Trinkaus
Keyword(s):  

2000 ◽  
Author(s):  
Stephen J. Kokkins ◽  
S. Kash Kasturi ◽  
Wayne Kong ◽  
S. K. John Punwani

Abstract Representative structural models of locomotives, other rail vehicles, and other potential colliding objects were combined into moving consists which were then subjected to various collision scenarios. The LS-DYNA dynamic finite-element modeling code was utilized to realistically simulate collisions and guide understanding and improvements of the locomotive structures. This incorporated the effects of the collision interactions, plus critical non-linear material and structural behavior, buckling, fracture, kinematics, and wayside interactions of the vehicles. The types of collisions included: locomotive-headed consists striking standing consists obliquely fouling the Right Of Way, headed both by freight cars and other locomotives; locomotives striking loose, loaded intermodal containers dislodged from opposing cars on adjacent track. Work on multiple coupled locomotive overrides in direct consist collisions is now being conducted. The effects of varying parameters such as collision speeds, location and orientation of the colliding vehicles, and structural improvements were explored and quantified. Also, the effects of some structural design modifications such as stronger collision posts and cab structure were evaluated using this process. Verification studies to date have shown good correlation between the analytical simulations and observed outcome of actual historical accidents.


2017 ◽  
Vol 25 (2) ◽  
pp. 5-19
Author(s):  
Agnieszka Bieda ◽  
Anita Kwartnik-Pruc ◽  
Edyta Puniach

Abstract Large-format advertisements are becoming a more and more common element of building facades, especially in city centers. Placing an object of this type is not without significance to the real property management. A large-format advertising billboard on the facade, on the one hand, is associated with the possibility of renting advertising space, on the other - it can lead to the occupancy of a right-of-way, which results in a necessity to pay appropriate fees, in the amount regulated by the Act on Public Roads. Placing an object such as a large-format advertising billboard in a right-of-way requires a permit of the manager of this road. However, if a billboard is located on the facade of a building, occupancy of the right-of-way is not always the case. If the boundary of the road parcel runs along the contour of the building, a billboard placed on the elevation will always occupy the right-of-way. However, property boundaries often run at a distance from the building. Such situations - desired by managers - result in a noticeable increase in demand for surveying opinions to determine what part of the right-of-way is occupied by a large-format advertisement. This article analyzes the cases of the right-of-way being occupied by large-format advertising placed on the facades of buildings in the city center. For selected objects, information was obtained from public records, National Cartographic Documentation Center database, and direct surveying was performed with various techniques. This allowed for an objective assessment of the possible use of available surveying methods and the acquired spatial data to determine the right-of-way occupied by large-format advertisements for purposes of real estate management.


2016 ◽  
Vol 42 (2) ◽  
Author(s):  
Chris Haugen ◽  
Kevin Tucker ◽  
Alex Smalling ◽  
Emily Bick ◽  
Steve Hoover ◽  
...  

The plant growth regulator paclobutrazol’s effect on live oak trees (Quercus virginiana) was evaluated to determine optimum timing of application and pruning time in Louisiana. Variables considered included length of branch regrowth, branch distance to conductor, pruning time and biomass chipping time. Data were evaluated to determine the ideal application timing of paclobutrazol relative to time of pruning. Live oak trees treated with paclobutrazol had significantly reduced branch regrowth, pruning time and chipping time, as compared to control trees regardless of application timing. Paclobutrazol application on live oak trees was idealized within 90 days pre- to 90 days post-prune. Economically, significant gains were found by utilizing this tool ranging from 180 days pre- to 180 days post-prune, allowing for application timing flexibility to reduce the growth of trees near power lines. Paclobutrazol treated live oak trees demonstrated significantly less re-growth response.


Sign in / Sign up

Export Citation Format

Share Document