scholarly journals An academic review on the performance of the Sidrap wind turbine, Sulawesi – Indonesia

2021 ◽  
Vol 878 (1) ◽  
pp. 012058
Author(s):  
L Lisapaly

Abstract To secure the energy availability in Indonesia, the Government of Indonesia has tried to find new contributions from the renewable energy resources, one of them is the wind energy. In 2018, a new wind farm in Sidrap, Sulawesi, started to operate and was expected to generate 75 MW electricity from 30 wind turbines in the farm. However, the performance of this wind farm has been criticized by some popular figures in Indonesia, including the Minister of Finance of Indonesia who mentioned its performance as under expectation. On the other side, the Indonesian National Electricity Company (PLN) has reported some data on mass media indicating that this wind farm is producing as expected. To understand the critics, an academic review based on the standard knowledge in wind energy theory has been done. The study includes the review of wind speed in Sidrap, the maximum expected power from the wind turbines, and some other evaluations. It is expected that the critics can be understood in a fair way and be a lesson learned for the future wind farm development in Indonesia.

Author(s):  
Konstantinos Gryllias ◽  
Junyu Qi ◽  
Alexandre Mauricio ◽  
Chenyu Liu

Abstract The current pace of renewable energy development around the world is unprecedented, with offshore wind in particular proving to be an extremely valuable and reliable energy source. The global installed capacity of offshore wind turbines by the end of 2022 is expected to reach the 46.4 GW, among which 33.9 GW in Europe. Costs are critical for the future success of the offshore wind sector. The industry is pushing hard to make cost reductions to show that offshore wind is economically comparable to conventional fossil fuels. Efficiencies in Operations and Maintenance (O&M) offer potential to achieve significant cost savings as it accounts for around 20%–30% of overall offshore wind farm costs. One of the most critical and rather complex assembly of onshore, offshore and floating wind turbines is the gearbox. Gearboxes are designed to last till the end of the lifetime of the asset, according to the IEC 61400-4 standards. On the other hand, a recent study over approximately 350 offshore wind turbines indicate that gearboxes might have to be replaced as early as 6.5 years. Therefore sensing and condition monitoring systems for onshore, offshore and floating wind turbines are needed in order to obtain reliable information on the state and condition of different critical parts, focusing towards the detection and/or prediction of damage before it reaches a critical stage. The development and use of such technologies will allow companies to schedule actions at the right time, and thus will help reducing the costs of operation and maintenance, resulting in an increase of wind energy at a competitive price and thus strengthening productivity of the wind energy sector. At the academic level a plethora of methodologies have been proposed during the last decades for the analysis of vibration signatures focusing towards early and accurate fault detection with limited false alarms and missed detections. Among others, Envelope Analysis is one of the most important methodologies, where an envelope of the vibration signal is estimated, usually after filtering around a selected frequency band excited by impacts due to the faults. Different tools, such as Kurtogram, have been proposed in order to accurately select the optimum filter parameters (center frequency and bandwidth). Cyclostationary Analysis and corresponding methodologies, i.e. the Cyclic Spectral Correlation and the Cyclic Spectral Coherence, have been proved as powerful tools for condition monitoring. On the other hand the application, test and evaluation of such tools on general industrial cases is still rather limited. Therefore the main aim of this paper is the application and evaluation of advanced diagnostic techniques and diagnostic indicators, including the Enhanced Envelope Spectrum and the Spectral Flatness on real world vibration data collected from vibration sensors on gearboxes in multiple wind turbines over an extended period of time of nearly four years. The diagnostic indicators are compared with classical statistic time and frequency indicators, i.e. Kurtosis, Crest Factor etc. and their effectiveness is evaluated based on the successful detection of two failure events.


Author(s):  
Yousef Gharbia ◽  
Mohammed Anany

Kuwait is considering diversifying its energy resources and not solely depending on oil and gas. According to the Ministry of Electricity and Water (MEW), the annual increase in electricity demand is 6–8%, which is considered higher than neighboring countries (2–3%). Wind energy is one of the renewable energy resources considered by the Government to close the gap between the supply and the demand. In this work, we are exploring the feasibility of erecting a wind farm of installed capacity of 120 MW in a suitable location in Kuwait. Hourly wind data was collected from three promising locations. Abraq Al-Habari (AH), one of three areas studied, enjoys the highest average wind speed of 5.12 m/s resulting in wind power density (WPD) of 181 W/m2 at a mast height of 10 meters. Wind Atlas Analysis and Application Program (WAsP) was used to estimate the energy production from the wind farm. The program takes into account the complexity of the terrain, the site roughness, and the obstacles and shelters effects. The results showed that the wind farm should be able to produce a net annual energy production (AEP) of 322 GWh and will cost about 260 million US$. This cost includes the installation capital cost as well as the operation expenses over the lifespan of the wind farm. The cost of energy production is estimated at 0.04 US$/kWh. The payback period considering an annual price escalation rate of 1% and a discount rate of 2.25% over the lifespan of the farm is predicted to be around ten years.


Author(s):  
Baiq Liana Widiyanti

The need of larger quantity of energy to fulfill the demand of energy, especially thefossil fuel, forced the government of almost all nation try to find the new kind of energy orknown as alternative energy resources. Fossil fuel as non-renewable energy resources wouldbe decreased by the time if the using of it not under controlled. This kind of energy resourcesused to handle almost all the people need of energy, such as for domestic uses, industrial,tourism, etc. The used of fossil fuel for that purposed mostly for generated the electricitypower (by built the power plant). Many natural energy resources can used to generateelectricity power plant, but there always be some advantages and bad impact, especially forthe environments. One of environmental friendly alternative energy resources is exploitingthe form of wind power.Keyword: alternative energy, wind energy, windmills farms, human well-being.


Energies ◽  
2021 ◽  
Vol 14 (15) ◽  
pp. 4435
Author(s):  
Travis C. Douville ◽  
Dhruv Bhatnagar

The significant offshore wind energy potential of Oregon faces several challenges, including a power grid which was not developed for the purpose of transmitting energy from the ocean. The grid impacts of the energy resource are considered through the lenses of (i) resource complementarity with Variable Renewable Energy resources; (ii) correlations with load profiles from the four balancing authorities with territory in Oregon; and (iii) spatial value to regional and coastal grids as represented through a production cost model of the Western Interconnection. The capacity implications of the interactions between offshore wind and the historical east-to-west power flows of the region are discussed. The existing system is shown to accommodate more than two gigawatts of offshore wind interconnections with minimal curtailment. Through three gigawatts of interconnection, transmission flows indicate a reduction of coastal and statewide energy imports as well as minimal statewide energy exports.


Land ◽  
2021 ◽  
Vol 10 (7) ◽  
pp. 693
Author(s):  
Anna Dóra Sæþórsdóttir ◽  
Margrét Wendt ◽  
Edita Tverijonaite

The interest in harnessing wind energy keeps increasing globally. Iceland is considering building its first wind farms, but its landscape and nature are not only a resource for renewable energy production; they are also the main attraction for tourists. As wind turbines affect how the landscape is perceived and experienced, it is foreseeable that the construction of wind farms in Iceland will create land use conflicts between the energy sector and the tourism industry. This study sheds light on the impacts of wind farms on nature-based tourism as perceived by the tourism industry. Based on 47 semi-structured interviews with tourism service providers, it revealed that the impacts were perceived as mostly negative, since wind farms decrease the quality of the natural landscape. Furthermore, the study identified that the tourism industry considered the following as key factors for selecting suitable wind farm sites: the visibility of wind turbines, the number of tourists and tourist attractions in the area, the area’s degree of naturalness and the local need for energy. The research highlights the importance of analysing the various stakeholders’ opinions with the aim of mitigating land use conflicts and socioeconomic issues related to wind energy development.


2021 ◽  
Vol 4 (2) ◽  
pp. 125-130
Author(s):  
Muhammad Azhar Mahmood ◽  
Muhammad Kamran Liaqat Bhatti ◽  
S. Raza ◽  
M. Riaz

Most of the industries including the oil sector are looking forward towards the renewable energy resources with proper energy management system (EMS) as it is the need of time. For this purpose, solar and wind energy are the renewable energy resources, which are obtained from natural resources and produce clean and environment -friendly electrical energy and can be used for oil depots. The proper utilization of solar and wind energy from natural resource may result in economical and cost-effective EMS. In the proposed research work, an effective energy management demonstration is delivered to ensure the ceaseless flexibility of power. Furthermore, reduction of production per unit cost to the oil sector industry by utilizing multiple objectives streamlining. In the proposed oil depot, connected loads are divided into Shiftable and Non-Shiftable loads and then apply Branch and Bound Algorithm (BnB) with binary integer linear programming (BILP). By using the BnB technique, selected shiftable loads are shifted to the low cost energy resource automatically and resultantly, we get the low price unit cost and continuous power supply. Simulation results for the above-mentioned research work are performed on MATLAB. The proposed technique helps to reduce the power stack shedding issue as well.


Energies ◽  
2020 ◽  
Vol 13 (16) ◽  
pp. 4246 ◽  
Author(s):  
Guglielmo D’Amico ◽  
Giovanni Masala ◽  
Filippo Petroni ◽  
Robert Adam Sobolewski

Because of the stochastic nature of wind turbines, the output power management of wind power generation (WPG) is a fundamental challenge for the integration of wind energy systems into either power systems or microgrids (i.e., isolated systems consisting of local wind energy systems only) in operation and planning studies. In general, a wind energy system can refer to both one wind farm consisting of a number of wind turbines and a given number of wind farms sited at the area in question. In power systems (microgrid) planning, a WPG should be quantified for the determination of the expected power flows and the analysis of the adequacy of power generation. Concerning this operation, the WPG should be incorporated into an optimal operation decision process, as well as unit commitment and economic dispatch studies. In both cases, the probabilistic investigation of WPG leads to a multivariate uncertainty analysis problem involving correlated random variables (the output power of either wind turbines that constitute wind farm or wind farms sited at the area in question) that follow different distributions. This paper advances a multivariate model of WPG for a wind farm that relies on indexed semi-Markov chains (ISMC) to represent the output power of each wind energy system in question and a copula function to reproduce the spatial dependencies of the energy systems’ output power. The ISMC model can reproduce long-term memory effects in the temporal dependence of turbine power and thus understand, as distinct cases, the plethora of Markovian models. Using copula theory, we incorporate non-linear spatial dependencies into the model that go beyond linear correlations. Some copula functions that are frequently used in applications are taken into consideration in the paper; i.e., Gumbel copula, Gaussian copula, and the t-Student copula with different degrees of freedom. As a case study, we analyze a real dataset of the output powers of six wind turbines that constitute a wind farm situated in Poland. This dataset is compared with the synthetic data generated by the model thorough the calculation of three adequacy indices commonly used at the first hierarchical level of power system reliability studies; i.e., loss of load probability (LOLP), loss of load hours (LOLH) and loss of load expectation (LOLE). The results will be compared with those obtained using other models that are well known in the econometric field; i.e., vector autoregressive models (VAR).


Author(s):  
Othman A. Omar ◽  
Niveen M. Badra ◽  
Mahmoud A. Attia ◽  
Ahmed Gad

AbstractElectric power systems are allowing higher penetration levels of renewable energy resources, mainly due to their environmental benefits. The majority of electrical energy generated by renewable energy resources is contributed by wind farms. However, the stochastic nature of these resources does not allow the installed generation capacities to be entirely utilized. In this context, this paper attempts to improve the performance of fixed-speed wind turbines. Turbines of this type have been already installed in some classical wind farms and it is not feasible to replace them with variable-speed ones before their lifetime ends. A fixed-speed turbine is typically connected to the electric grid with a Static VAR Compensator (SVC) across its terminal. For a better dynamic voltage response, the controller gains of a Proportional-Integral (PI) voltage regulator within the SVC will be tuned using a variety of optimization techniques to minimize the integrated square of error for the wind farm terminal voltage. Similarly, the controller gains of the turbine’s pitch angle may be tuned to enhance its dynamic output power performance. Simulation results, in this paper, show that the pitch angle controller causes a significant minimization in the integrated square of error for the wind farm output power. Finally, an advanced Proportional-Integral-Acceleration (PIA) voltage regulator controller has been proposed for the SVC. When the PIA control gains are optimized, they result in a better performance than the classical PI controller.


2016 ◽  
Vol 13 (1) ◽  
pp. 27-37 ◽  
Author(s):  
Keyvan Esmaeelpour ◽  
Rouzbeh Shafaghat ◽  
Rezvan Alamian ◽  
Rasoul Bayani

The everyday growing populations all over the world and the necessity of increase in consumption of fossil energies have made the human to discover new energy resources, which are clean, cheap and renewable. Wind energy is one of the renewable energy resources. Considerable wind speed has made settling of wind turbines at sea beneficial and appealing. For this purpose, choosing the appropriate plates to set up wind turbines on the surface of sea is necessary. Regarding the installation condition, by choosing suitable geometry for floating breakwaters, offshore wind turbine can be mounted on them. Suitable geometry of breakwater for multifunctional usage could be selected with analyzing and comparing pressure, force and moment produced by incoming waves. In this article, we implement boundary element method to solve governing differential equations by assuming potential flow. On the other hand, for promoting free surface in each time step, we employed Euler-Lagrangian method. Finally, to find the appropriate geometry for installing the wind turbine on the breakwater, moment and wave profile next to the right and left side of breakwater body are calculated. Among simulated geometries, breakwater with trapezoid geometry which its larger base is placed in the water has more sustainability and it is the most suitable geometry for wind turbine installation.


2018 ◽  
Vol 64 ◽  
pp. 06010
Author(s):  
Bachhal Amrender Singh ◽  
Vogstad Klaus ◽  
Lal Kolhe Mohan ◽  
Chougule Abhijit ◽  
Beyer Hans George

There is a big wind energy potential in supplying the power in an island and most of the islands are off-grid. Due to the limited area in island(s), there is need to find appropriate layout / location for wind turbines suited to the local wind conditions. In this paper, we have considered the wind resources data of an island in Trøndelag region of the Northern Norway, situated on the coastal line. The wind resources data of this island have been analysed for wake losses and turbulence on wind turbines for determining appropriate locations of wind turbines in this island. These analyses are very important for understanding the fatigue and mechanical stress on the wind turbines. In this work, semi empirical wake model has been used for wake losses analysis with wind speed and turbine spacings. The Jensen wake model used for the wake loss analysis due to its high degree of accuracy and the Frandsen model for characterizing the turbulent loading. The variations of the losses in the wind energy production of the down-wind turbine relative to the up-wind turbine and, the down-stream turbulence have been analysed for various turbine distances. The special emphasis has been taken for the case of wind turbine spacing, leading to the turbulence conditions for satisfying the IEC 61400-1 conditions to find the wind turbine layout in this island. The energy production of down-wind turbines has been decreased from 2 to 20% due to the lower wind speeds as they are located behind up-wind turbine, resulting in decreasing the overall energy production of the wind farm. Also, the higher wake losses have contributed to the effective turbulence, which has reduced the overall energy production from the wind farm. In this case study, the required distance for wind turbines have been changed to 6 rotor diameters for increasing the energy gain. From the results, it has been estimated that the marginal change in wake losses by moving the down-stream wind turbine by one rotor diameter distance has been in the range of 0.5 to 1% only and it is insignificant. In the full-length paper, the wake effects with wind speed variations and the wind turbine locations will be reported for reducing the wake losses on the down-stream wind turbine. The Frandsen model has been used for analysing turbulence loading on the down-stream wind turbine as per IEC 61400-1 criteria. In larger wind farms, the high turbulence from the up-stream wind turbines increases the fatigues on the turbines of the wind farm. In this work, we have used the effective turbulence criteria at a certain distance between up-stream and down-stream turbines for minimizing the fatigue load level. The sensitivity analysis on wake and turbulence analysis will be reported in the full-length paper. Results from this work will be useful for finding wind farm layouts in an island for utilizing effectively the wind energy resources and electrification using wind power plants.


Sign in / Sign up

Export Citation Format

Share Document