scholarly journals BIM coordinators: a review

2018 ◽  
Vol 25 (8) ◽  
pp. 989-1008 ◽  
Author(s):  
Mattias Jacobsson ◽  
Christoph Merschbrock

Purpose The purpose of this paper is to explore the role, practices and responsibilities of building information modeling (BIM) coordinators (BCs). Design/methodology/approach The aim is achieved through a review of existing publications (n=183) in which the term “BIM coordinators” has been described and discussed (n=78), complemented by interviews with four Norwegian BIM experts. Findings The findings from the review indicate that the core responsibilities of BCs involve clash detection, managing information flows and communication flows, monitoring and coordinating design changes, supporting new working procedures and technical development and acting as a boundary spanner. The complementary interview study extends these findings with two additional practices and a reflection on the experienced challenges, obstacles and potential future development of the role. In essence, the authors propose that the role of BCs can be defined as being responsible for external/internal alignment and coordination of actor needs, and engaged in product-, process- and system-oriented practices of BIM. Research limitations/implications Given that this study is primarily an integrative literature review of BCs, it has the limitations common with such an approach. Therefore, future studies should preferably extend presented findings through either a survey, further in-depth interviews with BCs or reviews of closely related BIM specialist roles such as BIM managers or BIM technicians. Practical implications With BCs seemingly being central to information management and knowledge domain integration within the architecture, engineering and construction industry, an understanding of their importance and role should be of interest to anyone seeking to tap into the potential of BIM. This paper outlines specific implications for construction manager, educators and BCs. Originality/value The value of this study lies primarily in the fact that it is the first thorough investigation of the role, practices and responsibilities of BCs.

2020 ◽  
Vol 27 (6) ◽  
pp. 1257-1281 ◽  
Author(s):  
Timothy O. Olawumi ◽  
Daniel W.M. Chan

PurposeThe construction industry has been evolving in recent years through the adoption of smart tools such as building information modeling to reduce the complexity in the construction process and optimize the project's goals. This paper aims to identify and assess the key drivers for the implementation of smart sustainable practices in the construction industry.Design/methodology/approachInferential and descriptive statistical techniques were employed in analyzing the data collected via an international empirical questionnaire survey deployed in soliciting the perceptions of 220 construction professionals across 21 countries. Factor analysis was used to categorize the identified key drivers into their underlying clusters for further discussion. Also, the data were analyzed based on the various groups and regions of the study's respondents.FindingsThe key drivers (KDs) are related to the technical competence of staff as well as knowledge and awareness level within the industry, issues related to organizational and project's strategy and policies, availability of financial resources and development of relevant standards and policies to aid its execution among others. A comparative analysis of the perceptions of the different respondents' groups was undertaken and discussed.Practical implicationsThe analysis of the key drivers for the implementation of smart and sustainable practices in the construction industry is expected to aid the decision-making of the relevant stakeholders as well as serve as a consultation instrument for government agencies in their design of localized policies and guidelines to aid smart and sustainable urbanization. The findings revealed the gaps in the implementation of smart and sustainable practices in various climes and organization setups and provided useful and practical strategies for addressing the current hindrances during implementation.Originality/valueThe study has generated valuable insights into the significant drivers that can enhance the implementation of smart and sustainable practices across regions. It is evident that synergy among the relevant stakeholders in the built environment will help accelerate the implementation of smart sustainable practices in the construction industry. The study findings have provided profound contributions to theory and research as well as to industry practice.


2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Solomon Olusola Babatunde ◽  
Srinath Perera ◽  
Damilola Ekundayo ◽  
Damilola Sarah Adeleke

Purpose Building information modeling (BIM) is vital in the performance improvement of contracting firms. Thus, there is a need to stimulate its implementation in the construction sector with a view to meeting the competitive demands of the industry. However, there have been very few studies on BIM implementation among contracting firms in Nigeria. Hence, this study aims to examine the current BIM uptake among Nigerian contracting firms, assess the barriers to BIM implementation and examine the ways of improving BIM implementation within these contracting firms. Design/methodology/approach A questionnaire survey was conducted on contracting firms (comprising small-, medium- and large-sized firms) in Lagos, Nigeria. The obtained data were analyzed using both descriptive and inferential statistics. These included percentage, mean score, standard deviation, the Kruskal–Wallis test and factor analysis. Findings This study revealed the current state of BIM implementation among contracting firms in Nigeria in terms of their knowledge of BIM, their usage of BIM as well as the BIM software adopted. Furthermore, the study identified 25 barriers to BIM implementation in contracting firms and identified 15 ways to improve BIM implementation in contracting firms. The relative importance of both the identified barriers and the ways for improving BIM implementation was gauged among contracting firms comprising small-, medium- and large-sized firms. The result of the Kruskal–Wallis test revealed that, except for two (out of 25) identified barriers, and one (out of 15) identified ways of improving BIM implementation in contracting firms, there is no significant statistical difference in the perceptions of the three respondents’ groups. The result of the factor analysis categorized the identified 25 barriers into seven main factors. Practical implications This study provides empirical evidence on the barriers to BIM implementation and the ways of improving its implementation among contracting firms, thereby providing a better insight of the Nigerian construction industry’s BIM environment. Originality/value This study’s findings can positively inform the decisions of construction stakeholders to formulate strategies capable of improving BIM implementation in the construction industry at large.


2019 ◽  
Vol 17 (5) ◽  
pp. 1077-1084 ◽  
Author(s):  
Yaser Gamil ◽  
Ismail Abd Rahman Rahman

Purpose This paper aims to investigate the awareness of construction practitioners of the adoption of building information modeling (BIM) and identification of the dominant challenges of implementing BIM in the life cycle of a construction project. Design/methodology/approach This study was sequentially conducted in the following in three main phases: a preliminary study of archival literature, where a rigorous study of the literature was conducted to identify the challenges of adopting BIM in the construction industry which was to be applied later to the challenges in the case of the Yemen construction industry; data collection, where data were collected using a questionnaire survey targeting 123 Yemeni construction practitioners working in managerial and technical levels; and data analysis, where data were analyzed using descriptive analysis by calculating the average index and standard deviations. The data were analyzed using the SPSS software. Findings The results show that the most critical challenges to adopt BIM are financial restrictions, lack of BIM knowledge, improper introduction of BIM concepts, lack of awareness of BIM benefits and no governmental enforcement. The study recommends policymakers and construction players to consider the challenges for a better introduction of BIM in the Yemen construction industry. Research limitations/implications This research focuses on the awareness and challenges of implementing BIM in the Yemen construction industry. Practical implications The findings of this study will help policymakers develop more constructive strategies to reduce the challenges and introduce governmental agendas towards the widespread use of the BIM concept and technology in the Yemen construction industry. The study suggested an in-depth investigation into the current curriculum in the Yemen universities and recommended the introduction of BIM concept in engineering courses. Social implications This study focused on the challenges of implementing BIM and the role of the social aspect in the issue. Originality/value From the extensive review of previous findings, this paper concentrates on the challenged to the implementation of BIM in the Yemen construction industry. There are lack of investigative studies that focus on the introduction of new technologies to advance the Yemen construction sector. Therefore, the findings help the authority to diagnose and address the sources of these challenges and introduce new solutions to the industry.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohamed Marzouk ◽  
Heba Elsaay ◽  
Ayman Ahmed Ezzat Othman

PurposeThis research is built up upon exploring the concepts of building information modeling (BIM) adoption and strategy formulation with the aim to develop a strategy for implementing BIM in the Egyptian construction industry.Design/methodology/approachThe development of the BIM implementation strategy was based on two pillars, namely the literature review and results of the survey questionnaire and interviews. First, the review of literature helped investigating the BIM challenges and international strategies developed to implement BIM worldwide.FindingsThe research presented recommendations to assist policymakers in Egypt to facilitate BIM implementation.Originality/valueAlthough multiple frameworks have been proposed to aid in BIM implementation, a practical strategy to implement BIM in Egypt is still lacking. Moreover, current market scale studies neglect nonsoftware aspects of BIM adoption, do not identify market gaps or reflect market-specific criteria. As such, it cannot be used by policymakers to facilitate BIM diffusion.


2017 ◽  
Vol 19 (2) ◽  
pp. 78-91 ◽  
Author(s):  
Sarah P. Lonbay ◽  
Toby Brandon

Purpose The increased involvement of adults at risk in the safeguarding process has become a prominent issue within English safeguarding policy. However, there is evidence to suggest that actual levels of involvement are still low. The purpose of this paper is to present findings from a PhD study in relation to the benefits of advocacy in supporting this involvement in adult safeguarding for older people. Design/methodology/approach Participants in the study included advocates and social workers who had experience of working with older people through the safeguarding process within two North East England local authorities. A critical realist approach through in-depth interviews was taken with all the participants. Findings The research findings in relation to the benefits of advocacy in supporting older people going through safeguarding processes are reported. The practical limitations and factors which help and hinder advocacy support within the process are also considered. The theoretical implications for power, empowerment, and advocacy are also explored. Research limitations/implications A key limitation of this research is that it did not include older people who had been through safeguarding amongst the participants. Practical implications Key implications for practice and policy are discussed. Originality/value The paper provides an overview and critique of empowerment in adult safeguarding and the role that advocates play in promoting this key principle.


Author(s):  
Vibhav Singh

Purpose – The purpose of this paper is to study and understand the older generation’s attitude toward use of technology for workplace communications. Design/methodology/approach – In-depth interviews were conducted with the older generation employees of an Indian Oil and Gas Public Sector Undertakings. Data gathered from the interviews were then analyzed to draw broad themes. Findings – Although the older generation is aware of the importance of technology and has adequate knowledge of its use, they are reluctant to use it. The reluctance is not on account of techno-phobia; it is more in the nature of approach-avoidance. Research limitations/implications – Organizations and human resource managers should focus on addressing the mental block of the older generation regarding the use of technology. Practical implications – Reverse mentoring and formation of cross-generational teams can be used to alter older generation’s selective mindset in relation to technology. Originality/value – This paper discusses the role of technology in intergenerational communication in the Indian context.


2015 ◽  
Vol 10 (4) ◽  
pp. 622-633 ◽  
Author(s):  
Mercy Mpinganjira

Purpose – The purpose of this paper is to investigate the role of trust in understanding usage of e-government services in South Africa. Of interest are services that involve two way interactions between citizens and government. Design/methodology/approach – Qualitative and quantitative data were collected from members of the public using in-depth interviews and a structured questionnaire, respectively. Findings – The findings show that trust in internet and in government as a provider of e-services are important factors that differentiates users and non-users of e-government services. The two factors are also significantly related to willingness to start using e-government services. Trust in e-service provider unlike trust in internet was however found to be a stronger differentiator of users and non-users and to have a stronger relationship with willingness to start using e-government services. Practical implications – Efforts aimed at promoting use of e-government services need to be based on a good understanding of factors that impact on citizens’ decisions in this regard. Such efforts need to include activities targeted at improving people’s trust in government’s ability to provide reliable and secure e-services. Originality/value – While provision of government services using the online channel is a growing phenomenon in most African countries, not much research has been done into what governments should focus on in order to entice more citizens to take up this channel. This study contributes to addressing this gap.


Complexity ◽  
2021 ◽  
Vol 2021 ◽  
pp. 1-9
Author(s):  
Ahsan Nawaz ◽  
Xing Su ◽  
Ibrahim Muhammad Nasir

The construction projects in Pakistan have inherent problems of erroneous planning and schedule development. This dilemma has led to the failure of the majority of construction projects in Pakistan. Earlier researches have tried to curtail the increasing spectrum of inaccurate planning and schedule development. But not many research studies have shed light on the major factor of 2D CAD drawings interpretation problems, which are playing a key role in defective planning and scheduling. Moreover, the role of BIM, i.e., Building Information Modeling with respect to efficient planning, has not been also discussed in detail. This study has concluded a positive impact of BIM on effective planning and scheduling in the construction industry of Pakistan. About 210 responses were obtained from experienced construction professionals of Pakistan and tested via regression analysis in order to validate this argument. It has been analyzed that 2D CAD drawings are now getting primitive and 3D technology BIM is taking its place. BIM is an efficient tool for planning and scheduling. With the start of CPEC and Multi-Billion Dollar investment on infrastructure, construction industry of Pakistan needs to uplift its existing standard in order to meet with international requirements. For this purpose, BIM has been recommended. It will not only assist in attaining flawless planning but will also increase the success rate of CPEC projects in Pakistan.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Pearl M.C. Lin

Purpose In view of the intense competition between businesses in the sharing economy and the conventional hospitality industry, this study aims to compare consumers’ private social dining and restaurant dining experiences. Design/methodology/approach In-depth interviews with 29 private social diners were conducted to yield 10 dining experiential domains, which were then validated using online survey data from 840 diners across four sample groups – local (Hong Kong) private social diners, local (Hong Kong) restaurant diners, overseas private social diners and overseas restaurant diners – to empirically examine a mechanism through which the dining experience influences diners’ psychological and behavioral responses. Findings The significant differences emerged among the four sample groups in their evaluations of dining experiences. The mediating role of memorability appeared weaker in overseas settings than in local settings. Practical implications The findings suggest restaurateurs be creative and open-minded in designing dining experiences that go beyond food-related satisfaction. Destination marketers should also find the findings insightful because they can diversify their catering offerings by differentiating private social dining with conventional restaurants. Originality/value The study presents a novel angle on experiential consumption in the sharing economy to focus on food-sharing activities, which is thought to complement the currently skewed research focus in the sharing economy. A theoretically driven mechanism was also validated to explain the experiential differences between conventional restaurants and private social dining.


2020 ◽  
Vol 27 (10) ◽  
pp. 2931-2958
Author(s):  
Oludolapo Ibrahim Olanrewaju ◽  
Nicholas Chileshe ◽  
Sunday Ajiboye Babarinde ◽  
Malindu Sandanayake

PurposeThe purpose of this paper is to identify and assess the perceptions of constructional professionals on barriers to implementation of building information modeling (BIM) within the Nigerian construction industry.Design/methodology/approachA scoping literature review was conducted to identify the fourteen barriers to implementation of BIM, which were employed to design a questionnaire survey. Data collected were analyzed using descriptive statistics, mean score, Kruskal–Wallis test, analysis of variance and multivariate techniques such as factor analysis.FindingsThe descriptive and empirical analysis demonstrated a disparity of ranking of the 14 barriers factors among the groups; however no statistically significant differences among the 14 barriers to BIM. Based on the mean score ranking results, only three (out of 14) barriers are identified as critical (mean score greater than 3.5): few studies available on BIM and lack of knowledge, inexistence or inadequate government policies, and high cost of implementation. The results of the one-sample t-tests show that they were statistically significant differences in 10 out of 14 barriers as follows: few studies available on BIM and lack of knowledge, lack of demand for use and acceptance of BIM, inadequate contractual coordination, lack of specified standards, cost of data and information sharing, technological availability issues, reluctance of other stakeholders, business and cultural changes, data and intellectual property issues, and interoperability issues. The study, through factor analysis, categorized the fourteen barriers to BIM implementation into four principal factors. The factors are: technology and business-related barriers; training and people-related barriers; cost and standards-related barriers; and process and economic-related barriers.Practical implicationsThe identification and assessment of the key barriers to BIM implementation would be useful for the construction professionals and other stakeholder of the construction industry with the view to advance BIM adoption in Nigeria. This could also be extended to other developing countries through considerations of the local economic conditions, given the status of BIM as being in the germinating stage of development in Africa.Originality/valueThe study provides insights on the barriers to BIM implementation across the Nigerian construction sector environments. The innovative aspect of the study is the identification of the ordered and grouped (composite) set of barriers to BIM which could be used to developing appropriate mitigating solutions.


Sign in / Sign up

Export Citation Format

Share Document