scholarly journals Identifying and prioritizing delay factors in Iran’s oil construction projects

2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Aliyeh Kazemi ◽  
Eun-Seok Kim ◽  
Mohammad-Hossein Kazemi

Purpose Successful implementation of construction projects is one of the crucial factors for the economic development of every country. The main part of the countries’ capital is allocated to civil and infrastructure projects annually, most of which are accomplished with delay. Construction projects are often criticized for overrunning time and budgets. Analyzing the factors causing delay is essential for omitting them and timely implementation of these projects. Due to the importance of oil projects, this study aims to investigate and analyze the factors causing a delay in Iran’s oil construction projects. Design/methodology/approach In this research, after a broad literature review, using the fuzzy Delphi method, a total of 75 delay factors were identified under 11 major categories of owner, contractor, consultant, equipment, labor, materials, design, contract and contractual relations, laws and regulations, environmental factors, and managerial factors. Then, by using the best-worst method, the factors were prioritized. Findings The results showed that sanction, governmental management systems, weak project management by the contractor, technical and managerial weaknesses of the consultant, financial problems and delay in payment by the owner, low efficiency of the equipment, low productivity of the workforce, changes in laws and regulations, inappropriate organizational structure linking to the project, changes in the design, and changes in the price of materials are the most crucial factors causing a delay in Iran’s oil construction projects. Research limitations/implications These findings are expected to have significant contributions to Iran’s oil construction industry in controlling the time overruns in construction contracts. Originality/value The main contribution of this study is to develop a comprehensive framework in which, causes of delay in Iran’s oil construction projects are addressed and prioritized.

2019 ◽  
Vol 26 (8) ◽  
pp. 1625-1640 ◽  
Author(s):  
Manuel Alexander Silverio-Fernandez ◽  
Suresh Renukappa ◽  
Subashini Suresh

Purpose The decentralisation of information and high rate of mobile content access in the construction industry provides an ideal scenario for improvement of processes via the implementation of the paradigm of the Internet of Things (IoT). Smart devices are considered as the objects interconnected in the IoT; therefore, they play a fundamental role in the implementation of digital solutions during the execution of construction projects. The purpose of this paper is to assess the critical factors for a successful implementation of smart devices in the construction industry. Design/methodology/approach An empirical study was performed in the Dominican Republic. This country, located at the heart of the Caribbean, presents an economy that strongly relies on the construction industry. Following a systematic approach, a qualitative data collection and analysis was performed based on semi-structured interviews and content analysis to professionals of construction companies in the Dominican Republic, enquiring the concept of smart devices and critical success factors for implementing the devices in the industry. Findings The key success factors obtained from the contestants were leadership, technology awareness, company size, usability of proposed solution, cost of implementation and interoperability. Originality/value This paper provides information to clients of the construction sector regarding the benefits of embedding smart devices into their business activities. Furthermore, this study provides a better understanding of the key factors to be considered by construction organisations when embedding smart devices into their projects. This study also provides recommendations for distinct stakeholders of the construction sector, such as policy makers, clients and technology consultants. Policy makers should especially consider factors such as technology awareness and leadership to develop the right policies for the integration of the IoT in construction projects. Technology consultants should be aware of the latest case studies of successful implementation of smart devices and IoT systems in the world in order to adapt and implement smart devices and IoT in their projects.


2017 ◽  
Vol 29 (2) ◽  
pp. 276-309 ◽  
Author(s):  
Fahim Ullah ◽  
Muhammad Jamaluddin Thaheem ◽  
Siddra Qayyum Siddiqui ◽  
Muhammad Bilal Khurshid

Purpose The purpose of this paper is to investigate the level of implementation of Six Sigma (SS) in the construction industry of Pakistan along with the current state of affairs and the challenges, and opportunities for a successful implementation. Design/methodology/approach The research is purely exploratory in nature. Based on published work, critical success factors are gathered, and a number of questionnaire surveys and interviews are conducted to refine and quantify their impact. A system dynamics framework to assess the SS influence on project success is developed and case study project are simulated. Findings The construction industry of Pakistan is still functioning in a traditional way; marred with low level of awareness and ad hoc approaches, the findings point to a huge improvement opportunity. Further, when under planning projects are exposed to SS, the chances of project success improve better than under execution projects. Research limitations/implications The limited level of awareness possessed by the respondents constrains the possible outreach of this work in industrially developed contexts. However, this work may become an impetus for further research in managing quality in construction industry. Practical implications The findings can be used to improve the quality provision of construction projects. Originality/value This work may trigger an important debate over the research and implementation of SS in the construction industry of developing countries that may greatly benefit by improving the quality of their projects and rectify their diminishing reputation for project success.


2005 ◽  
Vol 12 (4) ◽  
pp. 351-372 ◽  
Author(s):  
Khaled Al‐Reshaid ◽  
Nabil Kartam ◽  
Narendra Tewari ◽  
Haya Al‐Bader

PurposeIt is a well‐known fact that the construction industry always passes through two distinctive problems during the construction stage: slippages of project‐schedules, i.e. time‐frame, and overruns of project‐costs, i.e. budget. However, limited literature is available to solve or dilute these two problems before they even occur. It is strongly believed that the bulk of the two mentioned problems can be mitigated to a great extent, if not eliminated, provided that proper attention is paid to the pre‐construction phases of projects. Normally projects are implemented through traditionally old techniques which generally emphasize only solving “construction problems during the construction phase”. The aim of this article is therefore to unveil a professional methodology known as Project Control System (PCS) focusing on pre‐construction phases of construction projects.Design/methodology/approachIn this article, the authors share the lessons learned during implementation of Kuwait University projects worth approximately $400 million in a span of ten years. The task of the project management/construction management (PM/CM) is being provided to the university by a joint venture team of international and local specialists.FindingsThe pre‐construction methodology ensures smooth and successful implementation during construction phases of the projects as they are generally executed in a fast‐pace, deadline‐driven and cost‐conscious environment. The intuitive proactive methods, if implemented during pre‐construction stage, automatically answer the questions that are encountered during the execution periods of projects.Originality/valueIn this article, the authors share the lessons learned during PM/CM during projects over a span of ten years, which could be of use to others.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Lekan Damilola Ojo ◽  
Deji Rufus Ogunsemi ◽  
Olusola Ogunsina

Purpose The Nigerian construction industry is bedeviled with poor project performance and outcomes which value management (VM) could address if applied. The application of VM on Nigerian construction projects is very minimal due to certain obstacles, namely, lack of VM experts, paucity of knowledge on the techniques, etc., which inhibits the adoption into the construction industry. Therefore, this study aims to develop a conceptual framework of the adoption of VM on construction projects in a typical developing economy. Design/methodology/approach This study engaged 15 selected VM experts in two rounds of Delphi survey to develop a conceptual framework of VM adoption. The method of data analysis includes mean score, standard deviation, Kendall’s coefficient of concordance, chi-square (χ2) test, interrater agreement analysis and significant level analysis. The developed conceptual framework was sent to a team of local and international VM experts for validation. Findings This study reveals that the adoption of VM requires the collective effort of relevant stakeholders in the construction industry. The framework developed presents individual and collective activities to be undertaken by the stakeholders. The activities include training, legislation, government-funded research, etc. Thus, the adoption of innovative management methodology like VM requires the collaboration of academics, construction professional bodies and government parastatals. This will assist in the judicious use of limited construction resources and boost the relevance of the Nigerian construction industry among developing nations and in the global construction market. Originality/value This study used the opinions of few construction professionals that can be regarded as VM experts in Nigeria, as against engaging a pool of construction professionals who may not be knowledgeable in VM process. Engaging the few VM experts in the Nigerian construction industry is important to have a valid basis for drawing conclusion, as large questionnaire survey could be possibly filled by inexperienced or unqualified respondents if stringent criteria are not considered at the outset of this study.


2017 ◽  
Vol 15 (6) ◽  
pp. 803-825 ◽  
Author(s):  
Jeffrey Boon Hui Yap ◽  
Anna Lock

Purpose Knowledge management (KM) is the central know how for the construction industry. However, the delivery of construction projects is often plagued by schedule delays and cost overruns due to lack of working knowledge of project personnel. Hence, the need to appraise the practices of knowledge management in the construction industry has become all the more germane. This paper aims to determine the awareness of KM practices in Malaysia-based construction small and medium enterprises, and to investigate the benefits, tools and techniques, and challenges associated with knowledge management implementation so that effective measures can be devised to address them. Design/methodology/approach The research data were gathered using a structured questionnaire survey disseminated in the Klang Valley region in Malaysia. Responses were collected from 107 industry practitioners. The quantitative data are subjected to descriptive statistics, and the ranking with category of significance of the hypothesised variables is determined using the relative importance index (RII) technique. Findings The key benefits of KM practices are predominantly raising efficiency, quality, productivity and decision-making. The most preferred KM techniques are “face-to-face interaction”, “mentoring” and “documents and reports”. The highly significant tools are “groupware” and “telephone”. The major organisational issue hampering the implementation of knowledge management practices is “lack of motivation” while the critical cultural issue is relating to “bureaucracy and hierarchical”, and the vital people issue concerns “lack of trust”. Research limitations/implications The respondents were limited to only small and medium construction enterprises located in the Klang Valley region in Malaysia, which makes generalisation challenging. Practical implications KM provides not only a pragmatic but also a proactive approach to raising the competitive edge and capabilities of a construction company. Identification of the critical attributes of KM provides the basis for project managers in formulating KM strategies to enhance the chances of successful delivery of future projects. Originality/value The study contributes to the debate on the knowledge agenda in the construction industry, particularly from a fast developing economy’s perspective, where an effective KM can further contribute to realising a reasonable level of competitiveness operation.


2014 ◽  
Vol 32 (4) ◽  
pp. 315-330 ◽  
Author(s):  
Michelle C. Brennan ◽  
Alison J. Cotgrave

Purpose – Despite the surge of interest in construction sustainability and the many Government initiatives encouraging reform in the UK construction industry (CI), the prevalence of sustainable development (SD) in the industry is still largely lagging behind that of other industries. Given the amount of focus and activity identified nationally in this area, the purpose of this paper is to investigate the reasons why this is not being translated into action and to seek counsel from industry professionals as to how they believe change can be achieved with a particular focus on how they believe higher education institutions (HEIs) can contribute. Design/methodology/approach – An explorative, qualitative study using three focus groups was of construction professionals. Findings – Despite a lack of action, many in industry support sustainability and actively attempt to engage in sustainable practices but a number of barriers preclude successful implementation. Government initiatives are having a positive impact, with participants believing that both Government and HEIs are imperative in driving the sustainability agenda forward. Research limitations/implications – Whilst limited in scale, this paper highlights the current state of the CI in relation to SD and evidences that progress is being made albeit slowly. The findings may help both Government and HEIs alongside industry in achieving how this can be overcome. Originality/value – Previous research in this area has generally adopted a quantitative approach. Adopting a qualitative approach provides a more in depth view as to why the status quo remains with regards to SD in the CI.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad Osama ◽  
Aly Sherif ◽  
Mohamed Badawy

Purpose This paper aims to enlighten the importance of the risk management process which is considered as a major procedure to effectively handle the potential inherent risks in the construction industry. However, most traditional risk analysis techniques are based on theories that deal with each risk factor as an independent, which does not take into consideration the causal relationships between risk factors. Design/methodology/approach This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using Bayesian belief networks (BBN). Through a review of the literature, 27 risk factors were identified and categorized as the most common risk factors in the construction industry. A structured questionnaire was performed to estimate the probability and severity of these risks. Through site visits and interviews with experts in the construction field, 200 valid questionnaires were collected. A risk analysis model was developed using BBNs, then the applicability of this model was verified using a case study in Egypt. Findings However, the outcome showed that critical risks that manipulate administrative construction projects in Egypt were corruption and bribery, contractor financial difficulties, force majeure, damage to the structure and defective material installation. Practical implications The proposed study presents the possibilities available to the project parties to obtain a better forecast of the project objectives, including the project duration, total project cost and the target quality by examining the causal relationships between project risks and project objectives. Originality/value This study aspires to identify the overall risk of the administrative construction projects in Egypt and to recognize the most influencing risk factors through the project life cycle by using BBNs.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Mohammad-Hadi Sehatpour ◽  
Behnam Abedin ◽  
Aliyeh Kazemi

PurposeThe main aim of this research is to rank and prioritize the solutions to address the challenges for the successful implementation of talent management (TM) in government banks in Iran.Design/methodology/approachThis paper has identified the challenges of TM implementation in government banks and proposed the solutions to address these challenges through a review of the extant literature. The identified challenges and solutions were ranked using two multi-criteria decision-making (MCDM) methods called PROMETHEE and VIKOR based on the insights from 20 senior managers of government banks in Iran.FindingsThe challenges and solutions were categorized into cultural, managerial, human resources and environmental-related factors. “Building culture of TM in organizations”, “making TM as an ongoing process in organizations”, “commitment of senior managers to TM process”, “managing TM pipeline” and “focusing on meritocracy in recruitment and selections” were ranked as the top solutions to address cultural, managerial, human resources and environmental challenges, respectively.Research limitations/implicationsThe findings can provide a comprehensive view of different types of challenges and solutions in the TM process for government organizations and institutions. It also provides helpful insights for top managers to define their organizations' strategies effectively and to implement the TM process by ranking and prioritizing the solutions to address their challenges.Originality/valueThe main contribution of this study is to develop a comprehensive framework in which, identification of different types of challenges in the implementation of TM processes can be addressed and the approaches to remove or mitigate the effects of these challenges are ranked by using two well-established MCDM techniques.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Chipozya Kosta Tembo ◽  
Franco Muleya ◽  
Emmanuellie Phiri

PurposeThis research aimed to investigate the extent to which organisational culture is practised in local and foreign contractors in grade one and two categories and how it affects their performance.Design/methodology/approachThe approach for this research was positivist in nature adopting a mono-method of data collection through a survey using self-administered questionnaires. A total of 138 questionnaires were distributed among public clients and large-scale contractors registered in the stated grades, and 112 questionnaires were returned for analysis representing an overall response rate of 81% for contractors and clients.FindingsFindings revealed that in organisational culture, significant differences were found for management style and dominant characteristics of the organisation between local and foreign contractors. Differences were not found for leadership styles, measures of success and organisational glue. Results suggest that for local contractors to perform better, significant changes are needed to their management style and dominant characteristics of their organisations.Originality/valueForeign contractors in the Zambian construction industry are reportedly outperforming local contractors making them preferred contractors on larger public projects accounting for 85% of construction projects by value of works. This study presents the differences in organisational culture between foreign and local firms. It further demonstrates that organisational culture plays a key role in determining performance of a contracting firm. The study presents areas that local contractors can improve in organisational culture in order to remain competitive.


Author(s):  
Habeeb Kusimo ◽  
Lukumon Oyedele ◽  
Olugbenga Akinade ◽  
Ahmed Oyedele ◽  
Sofiat Abioye ◽  
...  

Purpose The purpose of this paper is to identify challenges faced in resource management in the UK construction industry and to propose some solutions to these problems. Design/methodology/approach Based on a qualitative research methodology, 14 experts from the UK construction industry were chosen to be participants in the study. The participants were equally divided into two focus groups to discuss resource management using five projects as case studies. Thematic analysis of the discussion reveals seven key factors that affect resource management. Findings The results show that most of the problems identified are due to poor data management processes and the practice of having data in silos. Overcoming this challenge requires the adoption of big data approaches for resource management to allow the integration of large and different forms of data. Originality/value This study seeks to bring to the fore challenges faced in resource management by the UK construction industry and to outline some solutions to address them.