Rotor Loss and Temperature Field of Synchronous Condenser under Single-phase Short Circuit Fault Affected by Different Materials of Rotor Slot Wedge

Author(s):  
Guorui Xu ◽  
Peidong Hu ◽  
Zhiqiang Li ◽  
Haisen Zhao ◽  
Yang Zhan
Energies ◽  
2020 ◽  
Vol 13 (4) ◽  
pp. 934
Author(s):  
Yanwen Wang ◽  
Le Wang ◽  
Sven G. Bilén ◽  
Yan Gao

Due to the working condition of low-voltage cabling from the mining flameproof movable substation to the loads of the mining face being poor, it is easy to cause various external mechanical damages to the cable sheaths. Furthermore, a single-phase earth leakage fault or short-circuit fault can occur when the low-voltage cable sheaths are damaged, and electric sparks caused by these faults can lead to a gas explosion. As the gas detonation time caused by the above faults is usually more than 5 ms, the high-speed interruption solid-state switch which controls the cables must cut off the current within 3 ms. This requires the action time of the solid-state switch to be less than 1 ms, and at the same time, the sampling and calculation time of the relay protection must be less than 2 ms. Based on these problems, this paper proposes the use of a high-speed solid-state circuit breaker (SSCB) topology at the neutral point of transformer, and analyzes the conduction mechanism and shut-off mechanism of the current of the SSCB. It presents an ultra-high-speed algorithm based on pattern recognition of single-phase earth leakage fault protection, and an ultra-high-speed algorithm of short-circuit fault which is based on the rate-of-change of the current. Finally, through computer simulation experiments and semi-physical simulation experiments, the feasibility of the above three technologies is verified to ensure that when a single-phase earth leakage fault or short-circuit fault occurs in the low-voltage cable, the solid-state switch which is installed in the mining flameproof movable substation will cut off the current within 3 ms.


2014 ◽  
Vol 521 ◽  
pp. 288-291
Author(s):  
Yu Sheng Quan ◽  
Xin Zhao ◽  
Hua Gui Chen ◽  
En Ze Zhou

Based on the method of symmetrical components of D, 11 and Y, o distribution transformer coupling two different effects of different magnetic circuit coupled to the three-phase system with a system-generated analysis and comparison. Analysis of the difference between the two groups of different connections on the transformer structure. Described in the single-phase short circuit fault clearing, 3n harmonic current suppression and affordability aspects of single-phase unbalanced load, D, ll coupling transformers are significantly better than Y,0 coupling transformer. This has necessarily important for the study of energy loss reduction.


Author(s):  
Deni Almanda ◽  
Juniyanto Juniyanto

Pada saat terjadi gangguan hubung singkat di saluran transmisi Gardu Induk Plumpang, rele jarak berfungsi sebagai proteksi utama. Penelitian ini bertujuan untuk mengetahui pengaruh kompensasi impedansi urutan nol (kzn) terhadap kehandalan sistem proteksi rele jarak (distance relay) pada penghantar harapan indah di Gardu Induk Plumpang. Setting rele jarak yang didapatkan dari PT PLN (Persero) UPT Pulogadung disimulasikan menggunakan alat uji Omicron. Hasil simulasi gangguan hubung singkat satu fasa, gangguan hubung singkat dua fasa, dan gangguan hubung singkat tiga fasa menggunakan setting lama Z1 = 2.58 Ω, Z2 = 3.87 Ω, dan Z3 = 7.30 Ω, kZn = 0.93 Ω < -0.4° rele jarak tidak bekerja selektif, maka dilakukan resetting. Hasil resetting rele jarak yaitu Z1 = 2.58 Ω, Z2 = 3.87 Ω, dan Z3 = 7.30 Ω, kZn = 0.68 Ω < -0.6°. Setelah dilakukan resetting dan disimulasikan gangguan hubung singkat satu fasa, gangguan hubung singkat dua fasa, dan gangguan hubung singkat tiga fasa, rele jarak bekerja secara handal. Kesimpulannya kZn dapat mempengaruhi kehandalan sistem proteksi rele jarak pada penghantar harapan indah di Gardu Induk Plumpang.In the event of a short circuit in the transmission line of the Plumpang Substation, the distance relay serves as the main protection. This study aims to determine the effect of zero sequence impedance compensation (kzn) on the reliability of the distance relay protection system at the Harapan Indah conductor at the Plumpang Substation. The distance relay setting obtained from PT PLN (Persero) UPT Pulogadung was simulated using the Omicron test tool. Simulation results of single phase short circuit, two phase short circuit, and three phase short circuit using the old setting Z1 = 2.58 Ω, Z2 = 3.87 Ω, and Z3 = 7.30 Ω, kZn = 0.93 < -0.4° relay distance does not works selectively, then resetting is done. The results of resetting the distance relay are Z1 = 2.58 Ω, Z2 = 3.87 Ω, and Z3 = 7.30 Ω, kZn = 0.68 < -0.6°. After resetting and simulating single-phase short circuit, two phase short circuit, and three phase short circuit fault, the distance relay works reliably. In conclusion, kZn can affect the reliability of the distance relay protection system on the beautiful hope conductor at the Plumpang Substation.


2014 ◽  
Vol 1079-1080 ◽  
pp. 484-487
Author(s):  
Xin Ming Wang ◽  
Ao Gao ◽  
Chang Zheng Zhao ◽  
Wei Gao

The desired sampleswhich formed by the arc grounding fault in single- phase circuit of thisarticle were obtained through the simulating test. The results indicated thatthe multi-layer structure of the melted marks on copper conductors could beobserved through the metallographic analysis while the arc grounding fault in single-phasecircuit happened, which was the most significant characteristic betweenthe arc grounding fault and the short circuit fault. What's more, there were individualfeathers on the iron earthed object through its own metallographic analysis.The outcomes are intended to provide the significative references for those whoare dedicating themselves to investigating the fire scenes and identifying thephysical evidence.


Sign in / Sign up

Export Citation Format

Share Document