Utilization of a Thermo-Mechanical Model Coupled With Multi-Objective Optimization to Enhance the Start-Up Process of Solar Steam Turbines

Author(s):  
Monika Topel ◽  
Andrea Vitrano ◽  
Björn Laumert

The need to mitigate the climate change has brought in the last years to a fast rise of renewable technologies. The inherent fluctuations of the solar resource make concentrating solar power technologies an application that demands full flexibility of the steam turbine component. A key aspect of this sought steam turbine flexibility is the capability for fast starts, in order to harvest the solar energy as soon as it is available. However, turbine start-up time is constrained by the risk of low cycle fatigue damage due to thermal stress, which may bring the machine to failure. Given that the thermal limitations related to fatigue are temperature dependent, a transient thermal analysis of the steam turbine during start process is thus necessary in order to improve the start-up operation. This work focuses on the calculation of turbine thermo-mechanical properties and the optimization of different start-up cases in order to identify the best solution in terms of guaranteeing reliable and fast start-ups. In order to achieve this, a finite element thermal model of a turbine installed in a concentrating solar power plant was developed and validated against measured data. Results showed relative errors of temperature evolutions below 2%, making valid the assumptions and simplifications made. Since there is trade-off between start-up speed and turbine lifetime consumption, the model was then implemented within a multi-objective optimization scheme in order to test and design faster start-ups while ensuring safe operation of the machine. Significant improvements came up in terms of start-up time reduction up to 30% less than the standard start-up process.

Author(s):  
Monika Topel ◽  
Björn Laumert ◽  
Åsa Nilsson ◽  
Markus Jöcker

Liberalized electricity market conditions and concentrating solar power technologies call for increased power plant operational flexibility. Concerning the steam turbine component, one key aspect of its flexibility is the capability for fast starts. In current practice, turbine start-up limitations are set by consideration of thermal stress and low cycle fatigue. However, the pursuit of faster starts raises the question whether other thermal phenomena can become a limiting factor to the start-up process. Differential expansion is one of such thermal properties, especially since the design of axial clearances is not included as part of start-up schedule design and because its measurement during operation is often limited or not a possibility at all. The aim of this work is to understand differential expansion behavior with respect to transient operation and to quantify the effect that such operation would have in the design and operation of axial clearances. This was accomplished through the use of a validated thermo-mechanical model that was used to compare differential expansion behavior for different operating conditions of the machine. These comparisons showed that faster starts do not necessarily imply that wider axial clearances are needed, which means that the thermal flexibility of the studied turbine is not limited by differential expansion. However, for particular locations it was also obtained that axial rubbing can indeed become a limiting factor in direct relation to start-up operation. The resulting approach presented in this work serves to avoid over-conservative limitations in both design and operation concerning axial clearances.


Author(s):  
Gabriel Marinescu ◽  
Michael Sell ◽  
Andreas Ehrsam ◽  
Philipp B. Brunner

Steam turbine start-up has a significant impact on the cyclic fatigue life. Modern steam turbines are operated at high temperatures for optimal efficiency, which results in high temperature differences relative to the condition before start-up. To achieve the fastest possible start-up time without reducing the lifetime of the turbine components due to excessive thermal stress, the start-up procedure of cyclic turbines is optimized to follow the specific material low cycle fatigue limit. For such optimization and to ensure reliable operation, it is essential to fully understand the thermal behavior of the components during start-up. This is especially challenging in low flow conditions, i.e. during pre-warming and early loading phase. A two-dimensional numerical procedure is described for the assessment of the thermal regime during start-up. The calculation procedure includes the rotor, casings, valves and main pipes. The concept of the start-up calculation is to replace the convective effect of the steam in the turbine cavity by an equivalent fluid over-conductivity that gives the same thermal effect on metallic parts. This approach allows simulating accurately the effect of steam ingestion during pre-warming phase. The fluid equivalent over-conductivity is calibrated with experimental data. At the end of the paper the impact of ingested steam temperature and mass-flow on the rotor cyclic lifetime is demonstrated. This paper is a continuation of papers [1] and [2].


Author(s):  
Yasuhiro Yoshida ◽  
Kazunori Yamanaka ◽  
Atsushi Yamashita ◽  
Norihiro Iyanaga ◽  
Takuya Yoshida

In the fast start-up for combined cycle power plants (CCPP), the thermal stresses of the steam turbine rotor are generally controlled by the steam temperatures or flow rates by using gas turbines (GTs), steam turbines, and desuperheaters to avoid exceeding the thermal stress limits. However, this thermal stress sensitivity to steam temperatures and flow rates depends on the start-up sequence due to the relatively large time constants of the heat transfer response in the plant components. In this paper, a coordinated control method of gas turbines and steam turbine is proposed for thermal stress control, which takes into account the large time constants of the heat transfer response. The start-up processes are simulated in order to assess the effect of the coordinated control method. The simulation results of the plant start-ups after several different cool-down times show that the thermal stresses are stably controlled without exceeding the limits. In addition, the steam turbine start-up times are reduced by 22–28% compared with those of the cases where only steam turbine control is applied.


Author(s):  
W. Z. Wang ◽  
J. H. Zhang ◽  
H. F. Liu ◽  
Y. Z. Liu

Linear damage method is widely used to calculate low-cycle fatigue damage of turbine rotor in the long-term operation without fully considering the interaction between creep and low cycle fatigue. However, with the increase of steam turbine pressure and temperature, the influence of high-temperature creep on the strain distribution of turbine rotor becomes significant. Accordingly, the strain for each start-up or shut-down process is different. In the present study, the stress and strain during 21 iterations of continuous start-up, running and shut-down processes was numerically investigated by using the finite element analysis. The influence of high-temperature creep on low cycle fatigue was analyzed in terms of equivalent strain, Mises stress and low cycle fatigue damage. The results demonstrated that the life consumption of turbine rotor due to low cycle fatigue in the long-term operation of startup, running and shutdown should be determined from the full-time coverage of the load of turbine rotor.


Author(s):  
Wolfgang Beer ◽  
Lukas Propp ◽  
Lutz Voelker

New flexible operational regimes with fast start-ups and fast-changing load cycles for steam turbines require calculation procedures for determining optimal start-up times in order not to exceed the limits of thermal stress for the steam turbine parts. This work presents a start-up time calculation for various kinds of industrial steam turbines. An analytical approach for estimating the optimal thermal load of a turbine from quasi-steady or steady condition is developed. The geometry of the respective turbine components, the changing of the steam parameters and heat transfer effects during the start-up procedure are taken into account while observing the respective material properties and stress limits. The temperature distributions of the respective turbine parts are calculated with a one-dimensional numerical algorithm of Fourier’s heat conduction equation. Three-dimensional influences of the geometry and of the the heat flux are considered analytically by adjusting the numerical solutions of elementary bodies (e.g. one-dimensional plate). The start-up time calculation is performed in small time steps to guarantee the stability of the numerical solution. The unsteady stress analysis for the start-up procedure does not uniquely identify one critical component. The calculation must be repeated for each time step to identify the component which limits the start-up gradient. Other boundary conditions, such as restricted speed ranges of the rotor with minimum transients and time for synchronization with the electrical grid, are considered by the model too and can further limit the start-up gradient and lead to slower start-up procedures. The one-dimensional calculation models were verified with a three-dimensional FEA of the casing and a two axis symmetrical FEA of the rotor. The results for the temperature distribution are presented and compared to the one-dimensional results. The final result of the analytical approach for an optimized start-up time calculation is verified with two typical start-up calculations, one for a generator drive steam turbine and one for a mechanical-drive steam turbine.


Author(s):  
Jan Vogt ◽  
Thomas Schaaf ◽  
Klaus Helbig

In the past most of the steam turbines were designed as base load machines. Due to new market requirements based on the effect of renewable energies, power plant operators are forced to operate with more frequent start-up events and load changes, resulting in a fundamental higher low cycle fatigue (LCF) lifetime consumption. Traditional methods of lifetime assessment often use representative start-ups, for the calculation of LCF damage, which can provide very conservative results with reasonable safety margins. For a high number of starts these safety margins may result in an overestimation of the LCF damage. At Alstom, an enhanced method for lifetime assessment has been developed, that evaluates the actual lifetime consumption from real operation data in an automated manner and provides much more realistic results. The operation data is used to calculate the transient temperature distribution and heat transfer coefficients along the rotor for each start-stop cycle. The corresponding stress distribution in the rotor is evaluated by means of a Finite-Element-method analysis. Finally the number of remaining cycles is extracted for the most critical locations using material data. In combination with the creep damage the lifetime consumption is evaluated. The entire process is highly automated, but also facilitates easy monitoring through the lifetime engineer by graphic presentation of calculation results. Using this enhanced method of lifetime assessment, the computed lifetime consumption is closer to the actual value, supporting the planning of overhauls and component replacements and minimizing the risk of failure or forced outages. The utilization of remaining lifetime can be optimized in favour of a more flexible mode of operation (e.g. low load operation and fast start-up) or extension of operational lifetime for conventional and combined cycle power plants.


Author(s):  
Y. Kostenko ◽  
D. Veltmann ◽  
S. Hecker

Abstract Growing renewable energy generation share causes more irregular and more flexible operational regimes of conventional power plants than in the past. It leads to long periods without dispatch for several days or even weeks. As a consequence, the required pre-heating of the steam turbine leads to an extended power plant start-up time [1]. The current steam turbine Hot Standby Mode (HSM) contributes to a more flexible steam turbine operation and is a part of the Flex-Power Services™ portfolio [2]. HSM prevents the turbine components from cooling via heat supply using an electrical Trace Heating System (THS) after shutdowns [3]. The aim of the HSM is to enable faster start-up time after moderate standstills. HSM functionality can be extended to include the pre-heating option after longer standstills. This paper investigates pre-heating of the steam turbine with an electrical THS. At the beginning, it covers general aspects of flexible fossil power plant operation and point out the advantages of HSM. Afterwards the technology of the trace heating system and its application on steam turbines will be explained. In the next step the transient pre-heating process is analyzed and optimized using FEA, CFD and analytic calculations including validation considerations. Therefor a heat transfer correlation for flexible transient operation of the HSM was developed. A typical large steam turbine with an output of up to 300MW was investigated. Finally the results are summarized and an outlook is given. The results of heat transfer and conduction between and within turbine components are used to enable fast start-ups after long standstills or even outages with the benefit of minimal energy consumption. The solution is available for new apparatus as well as for the modernization of existing installations.