IDENTIFICATION OF MAJOR LEAN WASTE AND ITS CONTRIBUTING FACTORS USING THE FUZZY ANALYTICAL HIERARCHY PROCESS

2016 ◽  
Vol 40 (3) ◽  
pp. 371-382 ◽  
Author(s):  
P. Arunagiri ◽  
A. Gnanavelbabu

Lean refers to the reduction of non-value added activities in industries. It focuses on seven types of lean waste. The significant challenge is to identify and reduce the major lean waste. With this objective, a survey was conducted in an international exhibition in India using a questionnaire. The collected data were analyzed using Analytic Hierarchy Process (AHP) software template to check consistency. Finding consistent results obtained in AHP satisfactory, ranking was carried out to find the major lean waste using fuzzy AHP. After the identification of the major lean waste, the major contributing factors for the waste were ranked using the Binary Logistic Regression (BLR). These contributing factors were further investigated for the waste elimination in the automobile component manufacturing industries.

Author(s):  
G. Marimuthu ◽  
G. Ramesh

Decisions usually involve the getting the best solution, selecting the suitable experiments, most appropriate judgments, taking the quality results etc., using some techniques.  Every decision making can be considered as the choice from the set of alternatives based on a set of criteria.  The fuzzy analytic hierarchy process is a multi-criteria decision making and is dealing with decision making problems through pairwise comparisons mode [10].  The weight vectors from this comparison model are obtained by using extent analysis method.  This paper concern with an alternate method of finding the weight vectors from the original fuzzy AHP decision model (moderate fuzzy AHP model), that has the same rank as obtained in original fuzzy AHP and ideal fuzzy AHP decision models.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Anchal Gupta ◽  
Rajesh Kr Singh ◽  
Shivam Gupta

PurposeThe purpose of this study is to identify factors that are important for logistics organizations from the perspective of manpower readiness for digitization of logistics operations. The study also prioritizes the identified factors and also evaluates the readiness index of manpower for the digitalization of logistics processes.Design/methodology/approachThe factors for manpower readiness are identified through literature review and analysis of a case study. Three major categories of factors are identified. These are organizational, behavioural and technological factors. Under these three major categories of factors, 18 sub-factors are identified. Thereafter, with experts' inputs, the factors are prioritized using Fuzzy analytic hierarchy process (AHP). Further, a case illustration of an Indian logistics company has been taken to understand the current processes, technical capabilities, manpower skills and organization culture. After the case analysis and expert inputs, the manpower readiness index has been evaluated by using graph theory matrix approach (GTMA).FindingsThe prioritization of manpower readiness factors has been done using Fuzzy AHP. Organizational factors are found to be the most important factors which require quick attention. Sub-factors that are most important for building competencies in the logistics sector are providing the right training on functional skill development (0.129), top management support and commitment for digitalization (0.117), and organizational culture for process digitalization (0.114), etc. Finally, framework for evaluation of manpower readiness index for logistics operations in the digital age has been illustrated for a case company.Practical implicationsIndian logistics companies can benchmark their readiness index with respect to the best in the industry. Based on the readiness index, logistics companies can analyse their position, gaps from best and worst and can also identify potential areas for improvement.Originality/valueThe novelty of the study lies in the development of a framework for manpower readiness for digitalization in the logistics sector. In literature, this field is very less researched and provides the scope for developing strategies for improving manpower competencies for Industry 4.0. Logistics companies can improve their performance by making their manpower ready based on results obtained for readiness index.


Author(s):  
E Celik ◽  
O Soner ◽  
E Akyuz ◽  
O Arslan

Ships create a large amount of pollutions to marine and coastal environment where its pollutants have negative effects to human and maritime habitat. Depending on the nature of ship-generated waste, rules and regulations determine discharging procedures. This paper focuses on evaluating of potential hazards of ship-generated wastes on the environment whether it may be discharged into the sea or disposed of on port facilities. Thus, marine and costal environmental effects can be discussed analytically to improve human and ecological health. To achieve this purpose, analytic hierarchy process (AHP) extended with interval type-2 fuzzy sets (IT2FSs) is used. While AHP method is used for prioritizing the potential ship- generated waste, the IT2FSs deal with uncertainty and vagueness in the process of obtaining expert decision. Beside assessment of the environmental impacts, the paper contributes to enhance coastal and marine environmental awareness with respect to the ship-generated waste.


2012 ◽  
Vol 8 (1) ◽  
pp. 34-48 ◽  
Author(s):  
Jie Li ◽  
Patrick Zou

To fulfil the increasing demands of the public,Public Private Partnership (PPP) has beenincreasingly used to procure infrastructureprojects, such as motor ways, bridges, tunnelsand railways. However, the risks involved inPPP projects are unique and dynamic due tolarge amount of investment and longconcession period. This paper aims to developa risk identification framework from theperspectives of project life cycle, and anassessment framework for risks associatedwith PPP project using fuzzy analyticalhierarchy process (AHP). First the paperreviews the current literature to identifycommon risks in PPP infrastructure projectsand classification methods used. The risksidentified from the literature were classifiedusing project life cycle perspectives. Followingthat, the paper presents the advantages offuzzy AHP. Furthermore, the paper provides aframework for assessment of risks in PPPprojects followed by an illustrative examplewhere the data was obtained from surveyquestionnaires. The paper concludes that risksassociated in PPP infrastructure projects areunique and therefore it is beneficial to classifythem from project life cycle perspectives, andthe proposed fuzzy AHP method is suitable forthe assessment of these risks.


2019 ◽  
Vol 11 (19) ◽  
pp. 5184
Author(s):  
Bo-Rui Yan ◽  
Qian-Li Dong ◽  
Qian Li

International capacity cooperation is easily affected by the interweaving of its internal and external environment. As the risk accumulation exceeds the threshold, a supply chain crisis and even emergency will occur and serious losses will be caused. Regarding multinational operation and international capacity cooperation, 208 cases were summarized to identify risk types and high-incidence areas, and a risk measurement index system was established. A Fuzzy AHP (Analytic Hierarchy Process) method was used to evaluate the importance of each risk index. It was found that country risk was the main cause of supply chain emergencies in international capacity cooperation. Construction, water and electricity supply, mining and manufacturing were major areas of emergencies. In international capacity cooperation, country risk and cross-cultural risk were more important in external risks, while in internal risk, financial risk and decision risk were more important.


2016 ◽  
Vol 5 (2) ◽  
pp. 59
Author(s):  
TJOKORDA GDE AGUNG FRISKA ADNYANA ◽  
G. K. GANDHIADI ◽  
DESAK PUTU EKA NILAKUSMAWATI

The aim of this research is to apply Fuzzy Analytic Hierarchy Process method to determine the dominant sectors of economy Bali Province. This research used survey data from respondents who understand about economy of Bali Province and Gross Regional Domestic Product (GRDP). The research variables consist of criteria and sub-criteria. The criteria consist of primary sector, secondary, and tertiary, while the sub-criteria consist of 9 sectors of the GRDP. Data processing is done by calculating the weighted average and arrange them into pairwise comparison matrices. Furthermore, the consistency ratio is checked. If consistency ratio less than 0.100 (), the elements of matrices is changed into triangular fuzzy scale and processed with synthetic extent to get the priority. Based on the result of research, the economy of Bali are dominated by tertiary sector in sector group, agriculture and forestry in sub-primary group, manufacturing industry in sub-secondary group, and trade, hotel and restaurant in sub-tertiary group.


2010 ◽  
Vol 20 (1) ◽  
pp. 71-85 ◽  
Author(s):  
Milanka Gardasevic-Filipovic ◽  
Dragan Saletic

In the paper the fuzzy extension of the Analytic Hierarchy Process (AHP) based on fuzzy numbers, and its application in solving a practical problem, are considered. The paper advocates the use of contradictory test to check the fuzzy user preferences during fuzzy AHP decision-making process. We also propose consistency check and deriving priorities from inconsistent fuzzy judgment matrices to be included in the process, in order to check if the fuzzy approach can be applied in the AHP for the problem considered. An aggregation of local priorities obtained at different levels into composite global priorities for the alternatives based on weighted-sum method is also discussed. The contradictory fuzzy judgment matrix is analyzed. Our theoretical consideration has been verified by an application of commercially available Super Decisions program (developed for solving multi-criteria optimization problems using AHP approach) on the problem previously treated in the literature. The obtained results are compared with those from the literature. The conclusions are given and the possibilities for further work in the field are pointed out.


Techno Com ◽  
2019 ◽  
Vol 18 (2) ◽  
pp. 178-189
Author(s):  
Siti Monalisa ◽  
Raynaldi Setiawan

BMT Al-ittihad terdapat bermacam-macam pembiayaan  salah satunya Murabahah yang berarti akad jual beli barang dengan menyatakan harga perolehan dan keuntungan (margin) yang disepakati oleh penjual dan pembeli. BMT Al-itthad dalam proses melaksanakan akad Murabahah dilakukan dengan menganalisa kelayakan pemberian pembiayaan kepada anggota dengan cara melengkapi persyaratan umum dan menggunakan bahasa yang subjektif terhadap penilaian kriteria karakter berdasarkan rekomendasi anggota lain,wawancara dan cara berkomunikasi, Penilaian karakter merupakan penilaian yang paling penting berdasarkan hasil wawancara dengan kepala pembiayaan karena penilaian karakter merupakan penilaian untuk melihat apakah anggota sanggup dan amanah membayar hutang. Untuk mengatasi penilaian yang bersifat subjektif maka dirancang sebuah sistem pendukung keputusan pemberian pembiayaan dengan menggunakan metode fuzzy analytic hierarchy process. Metode fuzzy AHP merupakan penggabungan dari metode fuzzy dan AHP. Metode fuzzy AHP dapat menutupi kelemahan yang terdapat pada AHP yaitu menangani penilaian yang bersifat subjektif . Sistem ini dirancang menggunakan bahasa pemrograman PHP, MySQL , sedangkan metode pengembangan sistem menggunakan V-model dan UML sebagai standar pemodelannya. Sistem pendukung keputusan  ini dapat memudahkan serta mempercepat proses penentuan pemberian pembiayaan Murabahah kepada anggota.


Author(s):  
Mohsen Dadras ◽  
Helmi Zulhaidi Mohd Shafri ◽  
Noordin Ahmad ◽  
Biswajeet Pradhan ◽  
Sahabeh Safarpour

This study aims at identifying the suitable lands for urban development in Bandar Abbas city based on its real world use regarding specific criteria and sub-criteria. The city of Bandar Abbas is considered as the most important commercial and economic city of Iran. It is also considered as one of the major cities of Iran which has played a pivotal role in the country's development and progress in recent years especially after the end of Iran-Iraq war owing to its embracing the country's main commercial ports. This process has caused the immigration rate into the city to rise significantly over the past 20 years. Thus, the development of the city is meanwhile considered as a high priority. Bandar Abbas city does not have a rich capacity for growth and development due to its special geographical situation being located in coastal border. Among the limitations placed in the city's development way, natural limitations (heights and sea shore) in the northern and southern parts of the city and structural limitations (military centers) in the east and west sides of the city may be referred. Therefore, identifying the suitable lands for urban development within Bandar Abbas city limits is becoming an essential priority. Therefore, different quantitative and qualitative criteria have been studied in order to select and identify these lands. The structures of qualitative criteria for most parts involve ambiguities and vagueness. This leads us to use Fuzzy logic in this study as a natural method for determining the solutions for problems of Multi-criteria decision making (MCDM). In the current research, a combination of MCDM methods has been presented for analysis. To assignee weights of the criteria Fuzzy AHP (analytic hierarchy process) is used for land selection and Fuzzy TOPSIS (method for order priority by similarity to ideal solution) is utilized to choose the alternative that is the most appropriate through these criteria weights. The sensitivity analysis of the results is included in the research.


2014 ◽  
Vol 32 (2) ◽  
pp. 163 ◽  
Author(s):  
Abdolhamid Safaei Ghadikolaei ◽  
Saber Khalili Esbouei

Multi Criteria Decision Making (MCDM) is an advanced field of Operation Research; recently MCDM methods are efficient and common tools for performance evaluation in many areas such as finance and economy. The aim of this study is to show one of applications of mathematics in real word. This study with considering value based measures and accounting based measures simultaneously, provided a hybrid approach of MCDM methods in fuzzy environment for financial performance evaluation of automotive and parts manufacturing industry of Tehran stock exchange (TSE).for this purpose Fuzzy analytic hierarchy process (FAHP) is applied to determine the relative important of each criterion, then The companies are ranked according their financial performance by using fuzzy additive ratio assessment (Fuzzy ARAS) method. The finding of this study showed effective of this approach in evaluating financial performance.


Sign in / Sign up

Export Citation Format

Share Document