scholarly journals Application Study on Building Information Model (BIM) Standardization of Chinese Engineering Breakdown Structure (EBS) Coding in Life Cycle Management Processes

2019 ◽  
Vol 2019 ◽  
pp. 1-10 ◽  
Author(s):  
Liye Zhang ◽  
Lijuan Dong

The successful adoption of building information modelling (BIM) technology has led to an ever-increasing need for improving management practices in both construction and operation stages of highway project engineering. The most significant aspect of applying BIM technology is establishing the rationality and concise engineering breakdown structure (EBS) coding. However, China has no uniform EBS coding standard for highways, which limits BIM technology development in different construction projects and at different stages of the same construction project. The purpose of this study is to propose an EBS standard that embodies a coding system for highways and at the same time meets the requirements of BIM management, project management (PM), and operation management (OM) in life cycle management process. This paper presents an EBS standard based on three classifications: (1) project-level construction, (2) project-level operation, and (3) network-level operation. A case study is given to illustrate the proposed EBS standard’s coding system. The new EBS system will have better adaptability in both the design and construction stages. The proposed EBS coding system has been applied in many projects and is undergoing both improvement and standardization in China. The presented EBS coding standard provides successful implementation references for the future adoption and use of BIM on PM and OM in highway projects.

The variants of the division of the life cycle of a construction object at the stages adopted in the territory of the Russian Federation, as well as in other countries are considered. Particular attention is paid to the exemplary work plan – "RIBA plan of work", used in England. A feature of this document is its applicability in the information modeling of construction projects (Building information Modeling – BIM). The article presents a structural and logical scheme of the life cycle of a building object and a list of works that are performed using information modeling technology at various stages of the life cycle of the building. The place of information models in the process of determining the service life of the building is shown. On the basis of the considered sources of information, promising directions for the development of the life cycle management system of the construction object (Life Cycle Management) and the development of the regulatory framework in order to improve the use of information modeling in construction are given.


Improving the efficiency of life cycle management of capital construction projects using information modeling technologies is one of the important tasks of the construction industry. The paper presents an analysis of accumulated domestic practices, including the legal and regulatory framework, assessing the effectiveness of managing the implementation of investment construction projects and of complex and serial capital construction projects, as well as the life cycle management of especially dangerous technically complex and unique capital construction projects using information modeling technologies, especially capital construction projects, as well as their supporting and using systems, primarily in the nuclear and transport sectors. A review of modern approaches to assessing the effectiveness of life cycle management systems of complex engineering systems in relation to capital construction projects is carried out. The presented material will make it possible to formulate the basic principles and prospects of applying approaches to assessing the effectiveness of the life cycle management system of a capital construction project using information modeling technologies.


Author(s):  
Lisa Lenz ◽  
Kai Christian Weist ◽  
Marvin Hoepfner ◽  
Panagiotis Spyridis ◽  
Mike Gralla

AbstractIn the last few years, particular focus has been devoted to the life cycle performance of fastening systems, which is reflected in increasing numbers of publications, standards and large-scale research efforts. Simultaneously, experience shows that in many cases, where fastening systems are implemented – such as industrial facilities – the design of fasteners is governed by fatigue loading under dynamic characteristics. In order to perform an adequate design and to specify the most efficient and appropriate fastening product, the engineer needs to access and process a broad range of technical and commercial information. Building information modelling (BIM), as a data management method in the construction industry, can supply such information and accommodate a comprehensive design and specification process. Furthermore, the application of BIM-based processes, such as the generation of a BIM-model, allows to use the important information for the construction as well as the life cycle management with different actions and time dependencies of the asset and its components. As a consequence, the BIM model offers the potential to correlate different data relevant for achieving the goals of the respective application, in order to ensure a more effective and correct design of the fastening. This paper demonstrates such a BIM-based design framework for an Industry 4.0 case, and in particular, the installation of a factory robot through post-installed anchors under fatigue-relevant loading in concrete.


As the intricacy of construction projects is amassed, prospects for tribulations are mounting, depicting negative impact on projects’ cost, time and excellence. Thus, eliciting claims that aredisruptive to projects, time consuming and exorbitant. BIM holds enormousprobable in prosperous claim management practices. The progression of BIM can enrich knowledge sharing for information of a building or facility. It forms a vitalbase for decision making throughout the life cycle phase from the conceptual design to demolition. BIM is also, a valuable multidisciplinary cohesive source of information technology that posts benefits and disputes in the construction industry. The main aspiration of this paper is to appraise how and to what magnitude BIM can help evading and plummeting claims in Jordan construction industry.The paper ran a literature review on recent research, industry reports, and other sources to seehow they identified claims, its classifications, benefits, impacts and challenges of BIM on construction projects.Also, the paper acknowledgedcontemporaneous challenges in the claims field and the construction industry as whole. The attained outcomes have shown that BIM overtakes traditional claim management practices in many aspects including recognizing and investigating claims, where the benefits are comprehended in time and cost savings, less change orders, less rework. Moreover, the information and knowledge management that BIM postulates can improve many aspects of claim management.


2012 ◽  
Vol 1 (1) ◽  
pp. 1-24 ◽  
Author(s):  
André Borrmann ◽  
Katharina Lukas ◽  
Marc Zintel ◽  
Peter Schießl ◽  
Michael Kluth

This paper introduces the concept of a BIM-based life-cycle management system for reinforced concrete buildings. The system allows one to compute a prognosis of the building’s condition taking into account the material properties of individual components, the environmental load as well as measurement data from current inspections. This prognosis then forms foundations for scheduled maintenance and repair actions in an economically efficient way. A particularly important feature of the presented system is that all input data as well as the computational results are associated with a (full) 3D Building Information Model (BIM) of the construction. In this way, an easy localization of the information is achieved facilitating both the data collection and the estimation of the building condition for engineers involved in inspection planning, inspection or the scheduling of repair actions. To further facilitate data input and interpretation, a hierarchic level-of-detail approach is employed for structuring the building model, ranging from building level down to individual hot spots. Additionally, the integration of a meta-model allows the flexible adaption of the semantic data model to specific buildings types or the particular needs of the users.


Work ◽  
2012 ◽  
Vol 41 ◽  
pp. 114-119 ◽  
Author(s):  
Kerosuo Hannele ◽  
Miettinen Reijo ◽  
Mäki Tarja ◽  
Paavola Sami ◽  
Korpela Jenni ◽  
...  

Author(s):  
Ki-Sig Kang ◽  
Claude Russell Clark ◽  
Poong Eil Juhn

For the past couple of decades there has been a change of emphasis in the world nuclear power from that of building new Nuclear Power Plants (NPP) to that of taking measures to optimize the life cycle of operational plants. National approaches in many countries showed an increase of interest in Plant Life Management (PLIM), both in terms of plant service life assurance and in optimizing the service or operational life of NPP. A strong convergence of views is emerging from different National approaches, particularly in the area of the economic aspects of NPP operation and in the evolution in the scope of NPP PLIM. The latter can directly affect the cost of electricity from NPP in an increasingly competitive environment. The safety considerations of a NPP are paramount and those requirements have to be met to obtain and to extend/renew the operating license. To achieve the goal of the long term safe, economic and reliable operation of the plant an Integrated Life Cycle Management Programme (ILCMP) is necessary. Some countries already have advanced PLIM Programmes while others still have none. The ILCMP objective is to identify all that factors and requirements for the overall plant life cycle. The optimization of these requirements would allow for the minimum period of the investment return and maximum of the revenue from the sell of the produced electricity. Recognizing the importance of this issue and in response to the requests of the Member States the IAEA Division of Nuclear Power implements the Sub-programme on “Engineering and Management Support for Competitive Nuclear Power”. Four projects within this sub-programme deal with different aspects of the NPP life cycle management with the aim to increase the capabilities of interested Member States in implementing and maintenance of the competitive and sustainable nuclear power. Although all four projects contain certain issues of PLIM there is one specific project on guidance on engineering and management practices for optimization of NPP service life including decommissioning. This particular project deals with different specific issues of NPP life management including aspects of ageing phenomena and their monitoring, issues of control and instrumentation, maintenance and operation issues, economic evaluation of NPP life cycle management including guidance on its earlier shut down and decommissioning. The paper describes in detail the full scope IAEA activities on different issues of NPP life management and some of its achievements in this field during the nearest past as well as plans for the future.


2011 ◽  
Vol 368-373 ◽  
pp. 3797-3800
Author(s):  
Xu Dong Zeng ◽  
Wei Qiang Zhou

Construction project life-cycle management should be based on the visualization of a virtual building, through the establishment of a Building Information Model in the phase of architectural design as a life-cycle information carrier to realize complete information integration. This enables all phases and territories of the whole building life-cycle to achieve in-time information-sharing so as to overcome traditional territory management pattern. This also improves the running mode and information management during the phases of design, costing, construction and operation.


2021 ◽  
Vol 19 (01) ◽  
pp. 180-197
Author(s):  
Vladimir Popov ◽  
Milena Medineckienė ◽  
Tatjana Grigorjeva ◽  
Arūnas Remigijus Zabulėnas

Traditional construction planning is being replaced by the building information modelling (BIM) approach, which seeks to digitalise all the construction procedures, including procurement. Successful implementation of BIM on the market requires the preparation of appropriate procurement documents. Purpose – to suggest the most suitable set of documents for public procurement in the context of BIM by analysing the documents that are necessary for implementing the stages of the building life cycle. Research methodology – in order to achieve the aim of the research, the in-depth analysis of different countries’ procurement methodological documents and analysis of the scientific articles have been implemented. The methodology also includes expert interviewing, which was done in order to analyse the investigated standards. Findings – After analysing the procurement procedures of Norway, Spain, France, Poland, the United Kingdom, the Netherlands, and Finland, a set of documents, including Employer’s Information Requirements (EIR), BIM Execution Plan (BEP) and BIM protocol, was considered as the most suitable for BIM-based procurement processes. In addition, the basic principles of ISO 19650-2:2018 do not reflect the specific conditions of each country, so it is appropriate to examine the possibility of providing guidance in individual national annexes that reflects the peculiarities of national procurement. Research limitations – some research limitations were related to the challenges to access the literature, particularly the regulatory documentation associated with the public procurement procedure in a singular Country. Also, the difficulties with and accessing the document in the English language. However, in most of these cases, the document overview was analysed or translated from the native language. Originality/Value – existing related studies are mainly oriented on a particular region/country, and no general overview of European countries regarding BIM procurement procedures has been implemented. Additionally, a significant scientific contribution of this research is the review of the fundamental standards, which includes the general specification for information management in construction projects using BIM. Implemented analysis can serve as a basis for other authors to implement their research concerning their region, to suggest the most appropriate and suitable set of documents. Practical implications – this study contributes to the preparation of the Lithuanian market for the implementation of BIM and could help policy-makers to prepare the most appropriate procurement documents.