scholarly journals Building Information Modelling (BIM) in Managing Construction Claims: Now and Beyond – A Review (Jordan Perspective)

As the intricacy of construction projects is amassed, prospects for tribulations are mounting, depicting negative impact on projects’ cost, time and excellence. Thus, eliciting claims that aredisruptive to projects, time consuming and exorbitant. BIM holds enormousprobable in prosperous claim management practices. The progression of BIM can enrich knowledge sharing for information of a building or facility. It forms a vitalbase for decision making throughout the life cycle phase from the conceptual design to demolition. BIM is also, a valuable multidisciplinary cohesive source of information technology that posts benefits and disputes in the construction industry. The main aspiration of this paper is to appraise how and to what magnitude BIM can help evading and plummeting claims in Jordan construction industry.The paper ran a literature review on recent research, industry reports, and other sources to seehow they identified claims, its classifications, benefits, impacts and challenges of BIM on construction projects.Also, the paper acknowledgedcontemporaneous challenges in the claims field and the construction industry as whole. The attained outcomes have shown that BIM overtakes traditional claim management practices in many aspects including recognizing and investigating claims, where the benefits are comprehended in time and cost savings, less change orders, less rework. Moreover, the information and knowledge management that BIM postulates can improve many aspects of claim management.

2013 ◽  
Vol 397-400 ◽  
pp. 2064-2068 ◽  
Author(s):  
Mei Liu

Change orders present one of the largest sources of cost growth on building construction projects and have negative impact on productivity, labor efficiency and building environment. Building Information Modeling (BIM) is proved a high technology that greatly benefits both design and construction, greatly promoting the design visualization and construction 4-D modeling. Driven by BIM, Integrated Project Delivery (IPD) emphasizes communication in the collaborative process by avoiding adversarial or counter-productive professional relationships to reduce waste and rework. If BIM&IPD can be properly applied in project, quite a lot change orders can be avoided and then project cost will be reduced. This paper investigates the impact of BIM&IPD on construction change orders using Bayesian Network method. Bayesian Network is a graphic model representing cause and effect relationship between change orders and BIM&IPD. In this paper, evidence reasoning and probabilistic inference analyses are conducted to indicate the causes in light of the results and forecast the results according to causes. From the analysis, Bayesian Network is proved a good tool for construction managers to make decisions.


2021 ◽  
Vol 4 (1) ◽  
pp. 50-64
Author(s):  
Ja’far A. Aldiabat Al-Btoosh

Variation order (VO) is one of the main issues faced by the construction industry in Jordan. Many researchers had investigated on the causes of VO and proposed procedures to minimize and control this issue; however, the VO is affecting the construction industry badly even at moment. Building Information Modeling (BIM) is a powerful management system that can make a significant difference in the project costs. However, BIM has not been examined as a tool to minimize the VO in Jordan. The main target of this study is to utilize BIM applications in reducing the effect of VO on the governmental projects in Jordan. In order to achieve this target, the researcher has designed a questionnaire to gather data related to VO causes and the BIM capability to solve this problem. The data collected from the questionnaires were analyzed statistically. The result from the analysis found that the consultant initiated the highest VO of 50% followed by the clients and the contractors of 20% and 10% unforeseen variation respectively. Moreover, it is found that BIM Design Applications, Facility Operations Simulation, Exploration Design Scenarios, BIM Design Detection and BIM Quantity Take-off and Cost Estimation were significantly capable of minimizing VO. The results show positive relationship with the application of BIM in minimizing VO in the construction industry in Jordan. © 2018. JASET, International Scholars and Researchers Association


Vestnik MGSU ◽  
2020 ◽  
pp. 867-906 ◽  
Author(s):  
Vladimir A. Volkodav ◽  
Ivan A. Volkodav

Abstract Introduction. Various building information classification systems are used internationally; their critical analysis makes it possible to highlight basic requirements applicable to the Russian classifier and substantiate its structure and composition. Materials and methods. Modern international building information classification systems, such as OmniClass (USA), Uniclass 2015 (UK), CCS (Denmark), and CoClass (Sweden), are considered in the article. Their structure, composition, methodological fundamentals are analyzed. In addition to international classification systems, Russian construction information classifiers are analyzed. Results. The structure of a building information classifier has been developed and tailored to the needs of BIM (building information modeling) and national regulatory and technical requirements. The classifier’s structure complies with the one recommended by ISO 12006-2:2015. Its composition has regard to the requirements that apply to the aggregation and unification of Russian classifiers, and it also benefits from the classifiers developed for and used by the construction industry. The proposed building information classifier has four basic categories and 21 basic classes. Conclusions. The proposed structure and composition of a building information classifier represent a unified and universal tool for communicating building information or presenting it in the standardized format in the consolidated information space designated for information models needed to manage life cycles of major construction projects.


2020 ◽  
Vol 9 (1) ◽  
pp. 1
Author(s):  
Qian Yang

<p>With the rapid development of social economy, the demand for new energy is also increasing, and then the problem of large consumption also has a negative impact on the development of the construction industry. Under the concept of green building, the design and construction units pay more attention to energy conservation and environmental protection, so they actively use photovoltaic new energy in the field of electrical energy conservation of construction projects, so as to improve people's quality of life. Starting from the principles and characteristics of building electrical energy conservation, this paper discusses the methods of building electrical energy conservation, and analyzes how to use photovoltaic new energy in the field of building electrical energy conservation, hoping to better practice the concept of energy conservation.</p>


2021 ◽  
Vol 318 ◽  
pp. 02003
Author(s):  
Hassan Kamal Alhilli ◽  
Sedki I. Rezoqi

Changes are a common phenomenon in the construction industry, impacting the project's cost, time, and performance. The purpose of this work is to a comprehensive review relating to variation order causes. Also, the aim here is to determine variation order causes in the building’s construction. More importantly, explore the relationship between these causes. However, the importance of specifying the causes for change orders is the first step in managing variation orders to reduce the harmful effect on a project. The field survey was conducted for several institutions such as health (Karkh’s health), higher education (University of Baghdad and University of Kufa). As a result, a field visit was made to the project sites. They were then, Conducting interviews with the resident engineer, the consultant, and the contractor. A developer tool called cause (variation orders) breakdown structure (CBS) included 12 causes at the first level, including 103 sub-causes. There is a relationship between the variation orders causes, which is evident in the third level. The study recommends adopting (CBS) a comprehensive reference for variation order causes in projects due to facilitating their management processes. Future research could examine the relative importance of variation order causes, in addition to using a fuzzy cognitive map to find the extent of each cause’s influence on the other.


2017 ◽  
Vol 15 (6) ◽  
pp. 803-825 ◽  
Author(s):  
Jeffrey Boon Hui Yap ◽  
Anna Lock

Purpose Knowledge management (KM) is the central know how for the construction industry. However, the delivery of construction projects is often plagued by schedule delays and cost overruns due to lack of working knowledge of project personnel. Hence, the need to appraise the practices of knowledge management in the construction industry has become all the more germane. This paper aims to determine the awareness of KM practices in Malaysia-based construction small and medium enterprises, and to investigate the benefits, tools and techniques, and challenges associated with knowledge management implementation so that effective measures can be devised to address them. Design/methodology/approach The research data were gathered using a structured questionnaire survey disseminated in the Klang Valley region in Malaysia. Responses were collected from 107 industry practitioners. The quantitative data are subjected to descriptive statistics, and the ranking with category of significance of the hypothesised variables is determined using the relative importance index (RII) technique. Findings The key benefits of KM practices are predominantly raising efficiency, quality, productivity and decision-making. The most preferred KM techniques are “face-to-face interaction”, “mentoring” and “documents and reports”. The highly significant tools are “groupware” and “telephone”. The major organisational issue hampering the implementation of knowledge management practices is “lack of motivation” while the critical cultural issue is relating to “bureaucracy and hierarchical”, and the vital people issue concerns “lack of trust”. Research limitations/implications The respondents were limited to only small and medium construction enterprises located in the Klang Valley region in Malaysia, which makes generalisation challenging. Practical implications KM provides not only a pragmatic but also a proactive approach to raising the competitive edge and capabilities of a construction company. Identification of the critical attributes of KM provides the basis for project managers in formulating KM strategies to enhance the chances of successful delivery of future projects. Originality/value The study contributes to the debate on the knowledge agenda in the construction industry, particularly from a fast developing economy’s perspective, where an effective KM can further contribute to realising a reasonable level of competitiveness operation.


2020 ◽  
Vol 312 ◽  
pp. 02002
Author(s):  
Abdul-Majeed Mahamadu ◽  
Lamine Mahdjoubi ◽  
Patrick Manu ◽  
Clinton Aigbavboa

With more than 80% of all construction projects overrunning their budget, there is a need for more efficient management of the estimated 10% of Gross Domestic Product (GDP) that is expended annually on construction across the world. It has been proposed that better information and data management through Building Information Modelling (BIM) will lead to cost savings and greater predictability. Notwithstanding the role of quantity surveyors (QS) in modelling and managing construction cost, they remain among the least capable of assimilating BIM into their existing traditional processes. Despite the increasing need for BIM capability assessments for projects, there remains, no tool specifically developed for assessing QS firm’s BIM utilisation capacity or performance. As a result, it is unclear the attributes that indicate BIM capability of QS firms as well as QS practices on projects. This study sought to address this through a review of BIM capability assessment frameworks in order to ascertain their suitability for QS practices. An expert focus group discussion was then used to identify peculiar attributes suitable for QS BIM capability assessment as a precursor to the development of a comprehensive model of QS BIM capability maturity. Findings reveal that most QS BIM capability attributes relate to processes including criteria for effective information definition and data management such that they are consistent with QS measurement standards. The BIM competence of staff also emerged as one of the key attributes highlighting the need for QSs to improve their knowledge, skills and experience in the application of BIM amidst current low levels of adoption. The proposed attributes would assist the development of performance and maturity indicators that would help QS firms better understand their own capability as well as the requirements for delivering costing services through BIM on projects.


2009 ◽  
Vol 36 (3) ◽  
pp. 439-449 ◽  
Author(s):  
Yi Zou ◽  
Sang-Hoon Lee

Change orders are ubiquitous in construction projects, and effective and efficient control of changes is critical to project success. There have been many empirical suggestions as to how to manage changes for best project outcomes, but this research is specifically aimed at exploring the relationship between project characteristics and the implementation of project change management best practices (PCMBP). Construction project data for this research are derived from the Construction Industry Institute (CII) benchmarking and metrics (BM&M) database. Binary logistic regressions and factorial analysis of variance (ANOVA) are performed to find out the differences among diverse types of projects in terms of the extents to which the PCMBP elements have been implemented. The findings can assist construction industry practitioners with using PCMBP more purposefully in accordance with specific project characteristics so that they will be better able to develop and administer their project execution plans.


Author(s):  
Lukumon O. Oyedele ◽  
Martin Regan ◽  
Jason von Meding ◽  
Ashraf Ahmed ◽  
Obas John Ebohon ◽  
...  

PurposeThe UK construction industry produces up to one third of all waste to landfill. This study aims to identify specific project practices impeding the reduction of waste in construction projects as well as uncovering potential waste solutions throughout the project delivery process. The rationale being that for such a drastic reduction in waste to landfill, holistic and extensive measures would be required.Design/methodology/approachA two‐way methodological approach was used. This comprised qualitative unstructured interviews and a quantitative questionnaire survey of three major stakeholders in the UK construction industry: clients, architects and contractors.FindingsDesign factors remain the major cause of impediments to waste reduction to landfill. Critical impediments include clients making waste prevention a top priority in projects, overly complex designs, waste taking a low priority compared to project time and costs, lack of concerns by designers for buildability, among others. Critical solutions include early supply chain involvement in design process, choosing materials for their durability, early communication of design changes to all parties, longer project programmes and better lead times, among others.Practical implicationsIn all, the target of halving construction waste to landfill based on the 2008 benchmark is achievable but would require construction companies to take it upon themselves to implement the proposed solutions suggested by this study.Originality/valueThe value of this research is to provide UK construction companies with solutions to reduce waste and aid the reaching of the landfill target, as landfill is decreasing as a solution to waste. In addition the cost savings on reducing waste could be crucial for companies in this current economic climate.