Life Cycle of Construction Objects at Information Simulation of Buildings and Structures

The variants of the division of the life cycle of a construction object at the stages adopted in the territory of the Russian Federation, as well as in other countries are considered. Particular attention is paid to the exemplary work plan – "RIBA plan of work", used in England. A feature of this document is its applicability in the information modeling of construction projects (Building information Modeling – BIM). The article presents a structural and logical scheme of the life cycle of a building object and a list of works that are performed using information modeling technology at various stages of the life cycle of the building. The place of information models in the process of determining the service life of the building is shown. On the basis of the considered sources of information, promising directions for the development of the life cycle management system of the construction object (Life Cycle Management) and the development of the regulatory framework in order to improve the use of information modeling in construction are given.

Improving the efficiency of life cycle management of capital construction projects using information modeling technologies is one of the important tasks of the construction industry. The paper presents an analysis of accumulated domestic practices, including the legal and regulatory framework, assessing the effectiveness of managing the implementation of investment construction projects and of complex and serial capital construction projects, as well as the life cycle management of especially dangerous technically complex and unique capital construction projects using information modeling technologies, especially capital construction projects, as well as their supporting and using systems, primarily in the nuclear and transport sectors. A review of modern approaches to assessing the effectiveness of life cycle management systems of complex engineering systems in relation to capital construction projects is carried out. The presented material will make it possible to formulate the basic principles and prospects of applying approaches to assessing the effectiveness of the life cycle management system of a capital construction project using information modeling technologies.


Vestnik MGSU ◽  
2020 ◽  
pp. 867-906 ◽  
Author(s):  
Vladimir A. Volkodav ◽  
Ivan A. Volkodav

Abstract Introduction. Various building information classification systems are used internationally; their critical analysis makes it possible to highlight basic requirements applicable to the Russian classifier and substantiate its structure and composition. Materials and methods. Modern international building information classification systems, such as OmniClass (USA), Uniclass 2015 (UK), CCS (Denmark), and CoClass (Sweden), are considered in the article. Their structure, composition, methodological fundamentals are analyzed. In addition to international classification systems, Russian construction information classifiers are analyzed. Results. The structure of a building information classifier has been developed and tailored to the needs of BIM (building information modeling) and national regulatory and technical requirements. The classifier’s structure complies with the one recommended by ISO 12006-2:2015. Its composition has regard to the requirements that apply to the aggregation and unification of Russian classifiers, and it also benefits from the classifiers developed for and used by the construction industry. The proposed building information classifier has four basic categories and 21 basic classes. Conclusions. The proposed structure and composition of a building information classifier represent a unified and universal tool for communicating building information or presenting it in the standardized format in the consolidated information space designated for information models needed to manage life cycles of major construction projects.


2021 ◽  
Vol 2142 (1) ◽  
pp. 012010
Author(s):  
V A Kostesha ◽  
D A Shapovalov ◽  
I K Kolesnikova ◽  
D A Biryukov ◽  
A A Chetverikova

Abstract This article reveals the topic of the implementation of information modeling in the legislation of the Russian Federation. The world experience of creating information models of capital construction and the main features of control and standardization of BIM formation are considered. The analysis of the existing legal framework is carried out in relation to the responsibilities of organizations for the formation and maintenance of information models. The scheme of the life cycle of the model was developed. The article is related to the field of highways property complex management. The main features of the formation of BIM roads, their systematization, storage and regular updating were identified. As a result of the study, a geoportal of highways was developed for the modernization of the land and property complex management of highways. It serves as the basis for geoinformation support for information modeling, cadastral, urban planning, inventory and other works on highways. Conclusions and recommendations for the further development of this area in the territory of the Russian Federation are presented.


Author(s):  
Lisa Lenz ◽  
Kai Christian Weist ◽  
Marvin Hoepfner ◽  
Panagiotis Spyridis ◽  
Mike Gralla

AbstractIn the last few years, particular focus has been devoted to the life cycle performance of fastening systems, which is reflected in increasing numbers of publications, standards and large-scale research efforts. Simultaneously, experience shows that in many cases, where fastening systems are implemented – such as industrial facilities – the design of fasteners is governed by fatigue loading under dynamic characteristics. In order to perform an adequate design and to specify the most efficient and appropriate fastening product, the engineer needs to access and process a broad range of technical and commercial information. Building information modelling (BIM), as a data management method in the construction industry, can supply such information and accommodate a comprehensive design and specification process. Furthermore, the application of BIM-based processes, such as the generation of a BIM-model, allows to use the important information for the construction as well as the life cycle management with different actions and time dependencies of the asset and its components. As a consequence, the BIM model offers the potential to correlate different data relevant for achieving the goals of the respective application, in order to ensure a more effective and correct design of the fastening. This paper demonstrates such a BIM-based design framework for an Industry 4.0 case, and in particular, the installation of a factory robot through post-installed anchors under fatigue-relevant loading in concrete.


2019 ◽  
Vol 26 (4) ◽  
pp. 648-667 ◽  
Author(s):  
Øystein Mejlænder-Larsen

Purpose Traditionally, progress in detail engineering in construction projects is reported based on estimates and manual input from the disciplines in the engineering team. Reporting progress on activities in an engineering schedule manually, based on subjective evaluations, is time consuming and can reduce accuracy, especially in larger and multi-disciplinary projects. How can progress in detail engineering be reported using BIM and connected to activities in an engineering schedule? The purpose of this paper is to introduce a three-step process for reporting progress in detail engineering using building information modeling (BIM) to minimize manual reporting and increase quality and accuracy. Design/methodology/approach The findings of this paper are based on the studies of experiences from the execution of projects in the oil and gas industry. Data are collected from an engineering, procurement and construction (EPC) contractor and two engineering contractors using case study research. Findings In the first step, control objects in building information models are introduced. Statuses are added to control objects to fulfill defined quality levels related to milestones. In the second step, the control objects with statuses are used to report visual progress and aggregated in an overall progress report. In the third step, overall progress from building information models are connected to activities in an engineering schedule. Originality/value Existing research works related to monitoring and reporting progress using a BIM focus on construction and not on detail engineering. The research demonstrates that actual progress in detail engineering can be visualized and reported through the use of BIM and extracted to activities in an engineering schedule through a three-step process.


Work ◽  
2012 ◽  
Vol 41 ◽  
pp. 114-119 ◽  
Author(s):  
Kerosuo Hannele ◽  
Miettinen Reijo ◽  
Mäki Tarja ◽  
Paavola Sami ◽  
Korpela Jenni ◽  
...  

2012 ◽  
Vol 229-231 ◽  
pp. 2760-2764 ◽  
Author(s):  
Yi Jao Chen ◽  
Chung Wei Feng ◽  
Kung Wen Lee

The M/E/P (Mechanical, Electrical, and Plumbing) system of the building project has become more and more complex as the demand of the better living environment within the modern buildings increases. However, since the complexity and uniqueness involved within MEP trades, various fields of designers or contractors can hardly share their information with each other. This study employs BIM (Building Information Modeling) technology to assist the stakeholders of the construction projects to share and exchange information according to their needs. First, the process of different MEP disciplines will be systematically analyzed. Then the possible conflicts between trades will be identified. According to the study, necessary and important attributes required for the MEP BIM objects will be developed. Those developed BIM objects will later serve as the core of the communication platform, on which the project participants can easily access and share information. In addition, a better information integration mechanism for MEP systems will be developed throughout different phases of the project life cycle.


2019 ◽  
Vol 948 (6) ◽  
pp. 16-23
Author(s):  
B.F. Azarov ◽  
I.V. Karelina

The role and place of ground laser scanning in the process of creating information models of the construction object at different stages of its life cycle are discussed. It is noted that ground laser scanning is the main way of creating point clouds of buildings and structures. The composition of information models characterizing the construction object at different stages of its life cycle is considered. It is indicated that ground-based laser scanning is the best solution for the information modeling problems in constructing an object, in particular, for its geodetic control. The authors provide examples of using ground laser scanning data for geodetic control at different stages of construction. In conclusion, the relevant problems of three- dimensional building-models, which can be solved using the technology of ground laser scanning, are indicated. It also noted what advantages ground-based laser scanning has as a tool for information modeling construction projects.


2019 ◽  
Vol 2019 ◽  
pp. 1-10 ◽  
Author(s):  
Liye Zhang ◽  
Lijuan Dong

The successful adoption of building information modelling (BIM) technology has led to an ever-increasing need for improving management practices in both construction and operation stages of highway project engineering. The most significant aspect of applying BIM technology is establishing the rationality and concise engineering breakdown structure (EBS) coding. However, China has no uniform EBS coding standard for highways, which limits BIM technology development in different construction projects and at different stages of the same construction project. The purpose of this study is to propose an EBS standard that embodies a coding system for highways and at the same time meets the requirements of BIM management, project management (PM), and operation management (OM) in life cycle management process. This paper presents an EBS standard based on three classifications: (1) project-level construction, (2) project-level operation, and (3) network-level operation. A case study is given to illustrate the proposed EBS standard’s coding system. The new EBS system will have better adaptability in both the design and construction stages. The proposed EBS coding system has been applied in many projects and is undergoing both improvement and standardization in China. The presented EBS coding standard provides successful implementation references for the future adoption and use of BIM on PM and OM in highway projects.