scholarly journals Evaluasi Tekanan Air Pori dan Rembesan Pada Bendungan Panohan

Author(s):  
Adib Lathiful Huda ◽  
Sri Prabandiyani Retno Wardani ◽  
Suharyanto Suharyanto

Salah satu penyebab kegagalan struktur bendungan adalah terjadinya rembesan yang dipicu oleh tingginya tekanan air pori yang terjadi pada tubuh bendungan. Pada Bendungan Panohan, kebocoran rembesan terjadi hingga memotong lereng hilir bendungan yang dapat mengganggu stabilitas tubuh bendungan. Tujuan dari penelitian ini adalah untuk mengevaluasi tekanan air pori dan rembesan di tubuh Bendungan Panohan menggunakan metode analisis instrumentasi piezometer dan v-notch yang kemudian dibandingkan dengan analisis metode elemen hingga (finite element method / FEM) menggunakan program perangkat lunak SEEP/W. Metode FEM menggunakan parameter desain material selama tahap perencanaan bendungan. Kedua analisis dilakukan pada section C - C Bendungan Panohan menggunakan beberapa variasi ketinggian muka air waduk. Hasil perbandingan menunjukkan bahwa nilai tekanan air pori dan rembesan pada metode FEM lebih besar dari hasil analisis dengan metode pembacaan instrumentasi pada kondisi muka air minimal dan normal. Kondisi sebaliknya terjadi pada kondisi ketinggian air banjir, yaitu nilai tekanan air pori dan rembesan dari pembacaan instrumentasi lebih besar dari hasil analisis metode FEM. Seiring dengan naiknya ketinggian muka air waduk, terjadi kenaikan nilai tekanan air pori dan rembesan dari kedua hasil analisis. Kondisi rembesan yang terjadi pada  Bendungan Panohan saat ini tidak aman pada kondisi muka air banjir, karena memiliki nilai debit rembesan 0,38 ltr/det melebihi dari yang disyaratkan yaitu sebesar 0,35 ltr/det.Kata kunci : bendungan panohan; tekanan air pori; rembesan; FEM ABSTRACTOne of the causes of the failure of a dam structure is the occurrence of seepage triggered by high pore water pressure that occurs in the body of the dam. In the Panohan Dam, seepage occurs on the downstream slope of the dam which can disturb the stability of the dam body. The purpose of this research is to evaluate the pore water pressure and seepage in the Panohan Dam body using the piezometer and v-notch instrumentation reading method which is then compared with the finite element (FEM) method using SEEP/W software program. FEM method uses material parameters during the dam planning stage. Both analyses were carried out on the C – C section of the Panohan Dam using several variations of reservoir water level. The comparison results show that pore water pressure in the FEM method is greater than the pore water pressure value based on the piezometer method at the minimum and normal water level conditions. The opposite condition occurs in maximum water level conditions. The seepage value of the v-notch reading is greater than the seepage value from the FEM method. Seepage that occurs in the Panohan Dam is currently unsafe under the maximal water level conditions.

2021 ◽  
Vol 12 (1) ◽  
Author(s):  
Priyanka Talukdar ◽  
Arindam Dey

AbstractThis paper reports a finite element study to identify the locations of crack initiation in a homogeneous earthen dam at its post-construction and reservoir operation stages. The steady state and transient analyses, including reservoir rise-up and drawdown conditions, are simulated to identify the favorable conditions and locations of crack generation. The behavioral response of the dam is represented in terms of the developed total stress, horizontal deformations of the faces, strain accumulation in the dam, and the differential settlement of the dam base. The locations of post-construction cracks are identified based on the negative minor principal stresses developed on the dam faces. For both single-lift and multiple-lift modeling techniques, the upstream face of the dam is found to be the most favorable location for the crack generation. For transient reservoir operations (rise-up and drawdown scenarios), it is identified that hydraulic fracturing may occur on either faces of the dam at specific heights, governed by the minor principal stresses becoming lesser than the developed pore-water pressure. Depending on whether the reservoir drawdown occurs before or after the attainment of steady-state phreatic level within the body of the dam, the pore-water pressure distribution within the dam are found notably different. This results in hydraulic fracturing occurring at different faces of the dam and at different heights. It is important to have a thorough understanding of the tentative location of the cracks developed in homogeneous earthen dams so that proper mitigation measure can be adopted as per requirement.


Water ◽  
2021 ◽  
Vol 13 (4) ◽  
pp. 502
Author(s):  
Jinman Kim ◽  
Heuisoo Han ◽  
Yoonhwa Jin

This paper shows the results of a field appliance study of the hydraulic well method to prevent embankment piping, which is proposed by the Japanese Matsuyama River National Highway Office. The large-scale embankment experiment and seepage analysis were conducted to examine the hydraulic well. The experimental procedure is focused on the pore water pressure. The water levels of the hydraulic well were compared with pore water pressure data, which were used to look over the seepage variations. Two different types of large-scale experiments were conducted according to the installation points of hydraulic wells. The seepage velocity results by the experiment were almost similar to those of the analyses. Further, the pore water pressure oriented from the water level variations in the hydraulic well showed similar patterns between the experiment and numerical analysis; however, deeper from the surface, the larger pore water pressure of the numerical analysis was calculated compared to the experimental values. In addition, the piping effect according to the water level and location of the hydraulic well was quantitatively examined for an embankment having a piping guide part. As a result of applying the hydraulic well to the point where piping occurred, the hydraulic well with a 1.0 m water level reduced the seepage velocity by up to 86%. This is because the difference in the water level between the riverside and the protected side is reduced, and it resulted in reducing the seepage pressure. As a result of the theoretical and numerical hydraulic gradient analysis according to the change in the water level of the hydraulic well, the hydraulic gradient decreased linearly according to the water level of the hydraulic well. From the results according to the location of the hydraulic well, installation of it at the point where piping occurred was found to be the most effective. A hydraulic well is a good device for preventing the piping of an embankment if it is installed at the piping point and the proper water level of the hydraulic well is applied.


2011 ◽  
Vol 2011 ◽  
pp. 1-12
Author(s):  
Mohammed Y. Fattah ◽  
Kais T. Shlash ◽  
Nahla M. Salim

The problem of the proposed “Baghdad metro line” which consists of two routes of 32 km long and 36 stations is analyzed. The tunnel is circular in cross-section with a 5.9 m outer diameter. The finite element analyses were carried out using elastic-plastic and modified Cam clay models for the soil. The excavation has been used together with transient effects through a fully coupled Biot formulation. All these models and the excavation technique together with Biot consolidation are implemented into finite-element computer program named “Modf-CRISP” developed for the purpose of these analyses. The results indicate that there is an inward movement at the crown and this movement is restricted to four and half tunnel diameters. A limited movement can be noticed at spring line which reaches 0.05% of tunnel diameter, while there is a heave at the region below the invert, which reaches its maximum value of about 0.14% of the diameter and is also restricted to a region extending to 1.5 diameters. The effect of using reduced zone on excess pore water pressure and surface settlement (vertical and horizontal) was also considered and it was found that the excess pore water pressure increases while the settlement trough becomes deeper and narrower using reduced .


2015 ◽  
Vol 23 (2) ◽  
pp. 9-18 ◽  
Author(s):  
Mohammed Y. Fattah ◽  
Raid R. Al-Omari ◽  
Haifaa A. Ali

Abstract In this paper, a method for the treatment of the swelling of expansive soil is numerically simulated. The method is simply based on the embedment of a geogrid (or a geomesh) in the soil. The geogrid is extended continuously inside the volume of the soil where the swell is needed to be controlled and orientated towards the direction of the swell. Soils with different swelling potentials are employed: bentonite base-Na and bentonite base-Ca samples in addition to kaolinite mixed with bentonite. A numerical analysis was carried out by the finite element method to study the swelling soil's behavior and investigate the distribution of the stresses and pore water pressures around the geocells beneath the shallow footings. The ABAQUS computer program was used as a finite element tool, and the soil is represented by the modified Drucker-Prager/cap model. The geogrid surrounding the geocell is assumed to be a linear elastic material throughout the analysis. The soil properties used in the modeling were experimentally obtained. It is concluded that the degree of saturation and the matric suction (the negative pore water pressure) decrease as the angle of friction of the geocell column material increases due to the activity of the sand fill in the dissipation of the pore water pressure and the acceleration of the drainage through its function as a drain. When the plasticity index and the active depth (the active zone is considered to be equal to the overall depth of the clay model) increase, the axial movement (swelling movement) and matric suction, as a result of the increase in the axial forces, vary between this maximum value at the top of the layer and the minimum value in the last third of the active depth and then return to a consolidation at the end of the depth layer.


2001 ◽  
Vol 38 (1) ◽  
pp. 1-15 ◽  
Author(s):  
Guoxi Wu

A nonlinear effective stress finite element approach for dynamic analysis of soil structure is described in the paper. Major features of this approach include the use of a third parameter in the two-parameter hyperbolic stress-strain model, a modified expression for unloading–reloading modulus in the Martin–Finn–Seed pore-water pressure model, and an additional pore-water pressure model based on cyclic shear stress. The additional pore-water pressure model uses the equivalent number of uniform cyclic shear stresses for the assessment of pore-water pressure. Dynamic analyses were then conducted to simulate the seismically induced soil liquefaction and ground deformation of the Upper San Fernando Dam under the 1971 San Fernando Earthquake. The analyses were conducted using the finite element computer program VERSAT. The computed zones of liquefaction and deformation are compared with the measured response and with results obtained by others.Key words: effective stress method, finite element analysis, Upper San Fernando Dam, earthquake deformation, VERSAT.


2021 ◽  
Vol 7 (2) ◽  
pp. 131-145
Author(s):  
Gerald Guntur Pandapotan Siregar ◽  
Fajar aldoko Kurniawan

The embankment dam is the most widely built dam in the world, especially in Indonesia. However, embankment dams are also prone to collapse. Dam failures due to the piping process through the dam body account for 30.5% of the total dam collapses worldwide. Therefore, it is necessary to periodically monitor and evaluate the condition of pore water pressure and seepage in a dam which is usually carried out using installed instrumentation. Very little has been done on instrumentation interpretation of earthfill dams in Indonesia, which is a very worrying condition. It is possible that old or even new dams have shown behavior that leads to a decrease in safety. This condition can be monitored by instrumentation in the dam if interpreted properly. Kedung Ombo Dam as an old embankment dam but has a fairly complete instrumentation can be evaluated for safety related to pore water pressure and phreatic line (seepage line). Pore water pressure evaluation is carried out by collecting piezometer readings and reservoir water level fluctuations over a period of several years. The results of the research on the interpretation of piezometer readings indicate that the overall safety of the Kedung Ombo dam is still good in terms of pore water pressure conditions. However, there are some anomalous conditions that should be investigated further


2021 ◽  
Vol 2021 ◽  
pp. 1-11
Author(s):  
Daqing Wang ◽  
Dong Wei ◽  
Guoyi Lin ◽  
Jiannan Zheng ◽  
Zhiting Tang ◽  
...  

Combined vacuum and surcharge preloading has gradually been widely used because of its advantages of low cost, green environmental protection, and good treatment effect. The conventional prefabricated vertical drain presents obvious defects in vacuum preloading treatment, such as obvious silting, serious bending of the drainage board, large attenuation of vacuum degree of drainage board along the depth, long construction period, and so on, which affect the final reinforcement effect. In this paper, the MIDAS finite element simulation of combined vacuum and surcharge preloading of prefabricated vertical drains (PVDs) and prefabricated horizontal drains (PHDs) is established through the comparative experiment of the engineering field. The comparative experimental study is carried out from the aspects of the vertical settlement, horizontal displacement, and pore water pressure. The results show that under combined vacuum and surcharge preloading, the consolidation effect of soft soil with PHDs is better than that with PVDs. When PHDs are used, the vertical settlement increases by 7.2% compared with PVDs; the horizontal displacement is larger; and the pore water pressure dissipates faster. This is because when the PHDs are adopted, the consolidation direction of the soil is consistent with the direction of the vacuum suction, which is mainly caused by vertical settlement. With the consolidation, the spacing between PHDs is gradually shortened, and the drainage distance is reduced, which can effectively reduce the consolidation time and improve the reinforcement effect of the soil. In addition, the PHDs can move downward uniformly with the soil during the consolidation process and have almost no bending deformation, which makes the vacuum transfer more uniform and effective.


2012 ◽  
Vol 204-208 ◽  
pp. 50-53
Author(s):  
Zhong Ming He ◽  
Wei Wu ◽  
Ling Zeng ◽  
Zhong Xin Cai

A numerical model was built by Finite Element software,discussed the effect of rainfall on slope pore water pressure、volatile water content and depth of infiltration in rainstorm condition. The results indicated that: (1)the variation of slope surface pore water pressure is more significant and the depth of infiltration is larger with the increase of rainfall intensity on the condition of fixed rainfall duration;(2)The slope section appears three pore water pressure divisions: transient saturated zone、negative pressure region and hydrostatic pressure area after the rainfall.


2012 ◽  
Vol 238 ◽  
pp. 451-454
Author(s):  
Zhong Ming He ◽  
Wei Wu ◽  
Ling Zeng ◽  
Zhong Xin Cai

A numerical model is built by Finite Element Software, discussed the effect of rainfall on slope pore water pressure, volatile water content and depth of infiltration in continuous rain condition. The result indicated that when the rainfall intensity and rainfall duration reach a certain condition, the ground water table rises slowly, and mostly, the spill points of ground water locate in the foot of slope. The slope section appears three pore water pressure divisions: transient saturated zone, negative pressure region and hydrostatic pressure area after the rain.