Modular Construction Systems for Freeform Architecture

2013 ◽  
pp. 689-696
Keyword(s):  
Author(s):  
Tochukwu Moses ◽  
David Heesom ◽  
David Oloke ◽  
Martin Crouch

The UK Construction Industry through its Government Construction Strategy has recently been mandated to implement Level 2 Building Information Modelling (BIM) on public sector projects. This move, along with other initiatives is key to driving a requirement for 25% cost reduction (establishing the most cost-effective means) on. Other key deliverables within the strategy include reduction in overall project time, early contractor involvement, improved sustainability and enhanced product quality. Collaboration and integrated project delivery is central to the level 2 implementation strategy yet the key protocols or standards relative to cost within BIM processes is not well defined. As offsite construction becomes more prolific within the UK construction sector, this construction approach coupled with BIM, particularly 5D automated quantification process, and early contractor involvement provides significant opportunities for the sector to meet government targets. Early contractor involvement is supported by both the industry and the successive Governments as a credible means to avoid and manage project risks, encourage innovation and value add, making cost and project time predictable, and improving outcomes. The contractor is seen as an expert in construction and could be counter intuitive to exclude such valuable expertise from the pre-construction phase especially with the BIM intent of äóÖbuild it twiceäó», once virtually and once physically. In particular when offsite construction is used, the contractoräó»s construction expertise should be leveraged for the virtual build in BIM-designed projects to ensure a fully streamlined process. Building in a layer of automated costing through 5D BIM will bring about a more robust method of quantification and can help to deliver the 25% reduction in overall cost of a project. Using a literature review and a case study, this paper will look into the benefits of Early Contractor Involvement (ECI) and the impact of 5D BIM on the offsite construction process.


2021 ◽  
pp. 102820
Author(s):  
Eleni Iacovidou ◽  
Phil Purnell ◽  
Konstantinos Daniel Tsavdaridis ◽  
Keerthan Poologanathan
Keyword(s):  

Buildings ◽  
2021 ◽  
Vol 11 (3) ◽  
pp. 121
Author(s):  
Hosang Hyun ◽  
Moonseo Park ◽  
Dowan Lee ◽  
Jeonghoon Lee

Modular construction, which involves unit production in factories and on-site work, has benefits such as low cost, high quality, and short duration, resulting from the controlled factory environment utilized. An efficient tower crane lifting plan ensures successful high-rise modular project completion. For improved efficiency, the lifting plan should minimize the reaching distance of the tower crane, because this distance directly affects the tower crane capacity, which is directly related to crane operation cost. In situations where units are lifted from trailers, the trailer-to-tower crane distance can have a significant impact on the tower crane operation efficiency. However, optimization of this distance to improve efficiency has not been sufficiently considered. This research proposes a genetic algorithm optimization model that suggests optimized tower crane and trailer locations. The case study results show that through the proposed model, the project manager can reflect the optimal location selection and optimal tower crane selection options with minimal cost.


2021 ◽  
Vol 134 ◽  
pp. 103664
Author(s):  
P.A. Wrigley ◽  
P. Wood ◽  
S. O'Neill ◽  
R. Hall ◽  
D. Robertson

Author(s):  
S Aziz ◽  
S N Che Mohd Nasir ◽  
R Hatrom ◽  
L Ahmad Bazuli ◽  
M R Abdullah

2012 ◽  
Vol 134 (42) ◽  
pp. 17335-17337 ◽  
Author(s):  
Ulrich Stoeck ◽  
Georg Nickerl ◽  
Ulrich Burkhardt ◽  
Irena Senkovska ◽  
Stefan Kaskel
Keyword(s):  

2012 ◽  
Vol 443 (2) ◽  
pp. 477-484 ◽  
Author(s):  
Min Tan ◽  
Wei Yan ◽  
Ru-Juan Liu ◽  
Meng Wang ◽  
Xin Chen ◽  
...  

aaRSs (aminoacyl-tRNA synthetases) establish the rules of the genetic code by catalysing the formation of aminoacyl-tRNA. The quality control for aminoacylation is achieved by editing activity, which is usually carried out by a discrete editing domain. For LeuRS (leucyl-tRNA synthetase), the CP1 (connective peptide 1) domain is the editing domain responsible for hydrolysing mischarged tRNA. The CP1 domain is universally present in LeuRSs, except MmLeuRS (Mycoplasma mobile LeuRS). The substitute of CP1 in MmLeuRS is a nonapeptide (MmLinker). In the present study, we show that the MmLinker, which is critical for the aminoacylation activity of MmLeuRS, could confer remarkable tRNA-charging activity on the inactive CP1-deleted LeuRS from Escherichia coli (EcLeuRS) and Aquifex aeolicus (AaLeuRS). Furthermore, CP1 from EcLeuRS could functionally compensate for the MmLinker and endow MmLeuRS with post-transfer editing capability. These investigations provide a mechanistic framework for the modular construction of aaRSs and their co-ordination to achieve catalytic efficiency and fidelity. These results also show that the pre-transfer editing function of LeuRS originates from its conserved synthetic domain and shed light on future study of the mechanism.


Sign in / Sign up

Export Citation Format

Share Document