scholarly journals Ranking the Factors that Influence the Construction Project Success: the Jordanian Perspective

2018 ◽  
Vol 7 (3.32) ◽  
pp. 97
Author(s):  
Ghanim A. Bakr ◽  
. .

Project success is what must be done for the project to be acceptable to the client, stakeholders and end-users who will be affected by the project. The study of project success and the critical success factors (CSFs) are the means adopted to improve the effectiveness of project.This research is conducted in an effort to identify which factors influence the success of project accomplishment in Jordan. This study has selected, through an extensive literature review and interviews, (83) factors categorized into (7) main groups that the questionnaire respondents were required to score. The responses from 66 professionals with an average of 15 years of experience in different types of construction projects in Jordan were collected and analyzed using SPSS and the most important factors for success for various success criteria are presented depending on the relative importance index to rank the categories. The research revealed the significant groups of factors are: factors related to Client , factors related to Contractor’s, factors related to Project Manager (PM), and factors related to Project management. In addition the top ten sub factors are: Assertion of the client towards short time of the project, availability of skilled labor, Assertion of the client towards high level of the quality, capability of the client in taking risk, previous experience of the PM in similar projects, previous experience of the contractor in similar projects, decision making by the client/ the client’s representative at the right time, assertion of client towards low cost of project, experience in project management in previous projects, and flow of the information among parties. The findings of this study might be useful to construction project participants in taking decisions leading to successful finishing of construction projects in Jordan. 

Companies try to use better techniques to deal with complex projects. The maturity of companies to apply these better techniques can guarantee project success or not. The environment, where the engineering and construction project is developed, also has influence over the success. The maturity of a company's project management processes is also a factor of success. This chapter aims to talk about concepts related to engineering and construction initiatives.


2017 ◽  
Vol 24 (1) ◽  
pp. 154-169 ◽  
Author(s):  
Sami Kärnä ◽  
Juha-Matti Junnonen

Purpose In a construction project, “participants’ satisfaction” is one of the main dimensions used for measuring the successfulness of a project. Designers perform a major role in attaining the project goals and managing project complexity during production. The purpose of this paper is to examine the designers’ performance as evaluated by the main participants: the client, the project consultant/manager and the main contractor, and to identify the main success factors of designer performance using the participants’ evaluation. The study also aims to examine how the economic size of a project affects the project participants’ assessment of the designer’s performance. It is assumed that as the size of a project increases, so does the complexity of the project, which will affect the scope of work and demands on the designers’ operational performance for the specific project level. Design/methodology/approach The Finnish project evaluation and benchmark database was used in this study as empirical data. The quantitative data consists of surveys on the project level and are based on a multi-dimensional standard evaluation wherein the main participants evaluate each other’s performances. The client, project consultant and main contractor evaluated the designer’s performance. The data of the study consisted of a total of 892 evaluations. ANOVA analysis was used to examine the differences between the project participants’ assessments based upon the different economic sizes of the projects. Findings Contractors were satisfied with the designers’ performance in small projects, whereas the client and the project consultant/manager rated the designers’ performance most successful in large projects. This result may be due to small projects are typically simple and less complex, in which case design solutions are generally well-defined. Nonetheless, the participants’ level of satisfaction follows the same factors. The main problems in the designers’ performance were related to the design content: the flawlessness and comprehensiveness, as well as the compatibility and consistency of designs. These factors were emphasized particularly in the client’s low satisfaction of the designer’s performance. However, project participants were satisfied with the collaboration with designers; however, room for improvement could be found in internal communication and collaboration within the design teams. The findings illustrated that the assessment of the success rate of a project was party-specific, which was clearly affected by the size of the project, as large projects appeared to be more complex than smaller ones. Practical implications The findings suggested that there is a need to develop project-specific practices in managing multidisciplinary design teams. Additionally, particularly in large projects, designers should focus more on solving problems and design requirements occurring at the construction site. However, this should be implemented in such a way that this does not interfere with the design activities conducted with the client and project management. While client satisfaction is low in the small projects, designers should focus more on customer-oriented methods to serve client needs better. Originality/value In construction project management studies, there is a need to measure the importance that various participants assign to different success factors. Since project success factors depend on project type, a more project-specific approach is suggested to identify the main parameters for measuring project success. This study provides a holistic approach of the designers’ performance, which contributes to the theory of project success and designers’ performance improvement.


2021 ◽  
Vol 13 (2(I)) ◽  
pp. 16-34
Author(s):  
Adrien Fariala ◽  
Olawumi Dele Awolusi

The success of the Government's construction projects in the Democratic Republic of Congo (DRC) since 2011 has been anchored on the potential of construction firms in completing these projects based on the planned timeframe as well as the budget. Consequently, from a project management viewpoint, the main objective of the present study was to assess the critical success factors in developing countries' construction projects and to examine the impact of risk management, leadership, experience and expertise, and project size on construction projects in DRC. Data was gathered from respondents in the construction projects in DRC using quantitative methods. A statistical software program, SPSS version 25, was subsequently used to analyze the collected quantitative data. The findings emanating from this study contribute to the body of knowledge on key success factors in construction projects in DRC as a developing country. It was revealed from the study that the success of construction projects in DRC could be boosted through effective and efficient risk management. In addition, effective and efficient leadership mainly transactional leadership would affect construction project success. Further, the more the experience and expertise of construction project staff, the more likely the project success criteria would be met, and the more likely the project would be successful. And lastly, smaller-sized and medium-sized construction projects may be more successful, whereas mega projects may not be very successful due to insufficient and limited experience and expertise.


2018 ◽  
Vol 25 (3) ◽  
pp. 425-442 ◽  
Author(s):  
Jian Zuo ◽  
Xianbo Zhao ◽  
Quan Bui Minh Nguyen ◽  
Tony Ma ◽  
Shang Gao

Purpose The purpose of this paper is twofold: first, to identify the soft skills of construction project management; and second, to investigate the influence of these soft skills on project success factors in the Vietnamese construction industry. Design/methodology/approach A questionnaire survey was conducted with 108 project management professionals from the Vietnamese construction industry. Partial least square structural equation modelling was employed in data analysis. Findings Four-dimensional structure of project success factors was confirmed in this study. Results also showed that soft skills of project managers significantly contributed to project success factors and hence the project success. Research limitations/implications There may be geographical limitation on the conclusions drawn from the findings. Similarly, the sample size was still small, despite a relatively high response rate. In addition, the majority of the respondents were contractors and clients as other project players were reluctant to respond to the survey. Practical implications This study provides an understanding of the relationship between soft skills and project success factors. Originality/value Although there have been studies focused on soft skills of project management and project success factors, few have attempted to analyse the effects of these soft skills on critical success factors. Thus, this study adds significantly to the existing research on both project management skills and project success factors.


2021 ◽  
Vol 13 (17) ◽  
pp. 9877
Author(s):  
Agata Klaus-Rosińska ◽  
Joanna Iwko

According to contemporary literature, stakeholder management (which is one of the identified clues of sustainable project management) plays a significant role in successfully delivering construction projects. However, the literature focuses on the issues of stakeholder management/analysis mainly for large projects, and the authors could not find any items related to small construction projects. The aim of the article is to present the results of research conducted in small construction companies in the context of stakeholder management of their projects against the background of project success and sustainability. Many researchers have concluded that stakeholder management is one of the success factors of projects (including construction projects). Based on the conducted quantitative research, the needs in the field of stakeholder management of small construction companies’ projects were determined and the approaches used in this area were diagnosed. The research results indicate a low level of maturity of small construction companies in managing project stakeholders, which is a surprising result considering the fact that the literature on the subject emphasizes the importance of taking care of the project stakeholder management area and associating it with the project’s success.


2013 ◽  
Vol 17 (1) ◽  
pp. 21-31 ◽  
Author(s):  
Neringa Gudienė ◽  
Audrius Banaitis ◽  
Nerija Banaitienė

This paper aims to identify a comprehensive list of critical success factors for construction projects in Lithuania. Based on the available literature review, this paper identified 71 success factors under 7 broad groups. Based on the survey results, ten factors including project manager competence, project management team members' competence, project manager coordinating skills, client clear and precise goals/objectives, project value, project management team members' relevant past experience, project manager organising skills, project manager effective and timely conflict resolution, client ability to make timely decision, and project manager experience were determined as the most important success factors for construction projects. These critical success factors are of great significance both to researchers and industry practitioners.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Masoud Zavari ◽  
Mohammad Reza Afshar

PurposeIn the construction industry, site managers are responsible for the day-to-day on-site running of a project. Site managers are required not only to ensure that work is done safely, on time, within budget and to the right quality standards, but also to manage any delays or problems encountered on-site during a construction project. Thus, a site manager has a significant position in the success of a construction project. However, there is a lack of studies considering the role of the leadership style of a site manager in construction project success. In this study, not only the effect of the transformational leadership (TL) style of site managers on the success of construction projects is assessed, but also the mediating role of team-building (TB) and team innovation between TL and project success is studied.Design/methodology/approachThe proposed hypotheses are tested by comparing the performance criteria of construction projects with the TL style of site managers. The success criteria of the projects are examined using project documents and client opinions, and the TL of site managers, TB aspects and team innovation in projects are assessed by asking from their subordinates. The Pearson correlation coefficient is employed to investigate the relation between every two variables.FindingsThe results illustrate that the TL of a site manager is directly related to project success; thus, the findings would confirm the importance of selecting appropriate site managers for construction projects. Moreover, while there is a mediating role of TB between TL and construction project success, team innovation does not have a mediating impact in design-bid-build (DBB) construction projects.Originality/valueAs there is a lack of studies assessing the TL effects on the success of construction projects and the significant role of site managers, this study is one of the first researches that tested these impacts and evaluated the mediating role of TB and team innovation between TL and project performance.


2019 ◽  
Vol 25 (6) ◽  
pp. 531-550
Author(s):  
Mariela Sjekavica Klepo ◽  
Mladen Radujković

There is a continuous need to improve existing project management decision-making support models, particularly those for monitoring and control are needed to increase chances for success. In this paper, potential of early warning in project management was focused, along with its connection to project success via project success factors. First, a systematic literature review was conducted, along with the focus group method, in order to identify project success factors. The selected success factors were also collected on 93 water infrastructure projects through a survey. By the means of linear regression analysis, critical success factors were finally determined. The results were integrated in the early warning system algorithm, composed by three modules – detection, validation and response module. The response module is composed by three dimensions: 1) risk, constraint and change management, 2) incorporation of project management competences and 3) application of project management methods, tools and techniques. The proposed early warning system was tested on three infrastructure projects. The results confirmed that improved early warning system can contribute in increase of project management success. As original database is composed by projects from only one country (Croatia), in the final stage of the research proposed approach was checked in five countries from the Central or South East Europe (Czech Republic, Slovenia, Serbia, North Macedonia, Bosnia and Herzegovina). The results from the final stage confirmed potential of the proposed approach as declared originally, so it is reasonable to expect success in early warning system’s implementation due to similarities of critical success factors on projects as well as project management problems in general, that countries in regions share. This research presents new and creative way in linking early warning and project success, as well as interpretation of early response through different dimensions in project management. Also, based on the results of this research, it is possible to create a useful practical tool for managing other types of projects.


2015 ◽  
Vol 764-765 ◽  
pp. 895-899
Author(s):  
Shiow Luan Wang ◽  
Thi Hoa Vu

Construction projects are becoming ever more complex and time driven, especially as the amount of project data and active project participants’ increase. For achieving a project success, project management not only must to meet time, cost, quality objectives, but also satisfies the project stakeholders needs related to the project management process. Project managers were difficult to effectively seizing, collecting and handling information which are generated from different systems. The elements of information presentation in web-based was contributed an important role to project management success. The purpose of this study is to provide a background to denote the enhancing project management via information presentation based on effective information technology/information systems which are emphasized in web-based.


Sign in / Sign up

Export Citation Format

Share Document