Dewatering of dredged slurry by horizontal drain assisted with vacuum and flocculation

2021 ◽  
pp. 1-33
Author(s):  
H. Pu ◽  
D. Khoteja ◽  
Y. Zhou ◽  
Y. Pan
Keyword(s):  
2016 ◽  
Author(s):  
Fadairo Adesina ◽  
Anawe Paul ◽  
Orodu Oyinkepreye ◽  
Oladepo Adebowale

2021 ◽  
Author(s):  
Pawan Agrawal ◽  
Sharifa Yousif ◽  
Ahmed Shokry ◽  
Talha Saqib ◽  
Osama Keshtta ◽  
...  

Abstract In a giant offshore UAE carbonate oil field, challenges related to advanced maturity, presence of a huge gas-cap and reservoir heterogeneities have impacted production performance. More than 30% of oil producers are closed due to gas front advance and this percentage is increasing with time. The viability of future developments is highly impacted by lower completion design and ways to limit gas breakthrough. Autonomous inflow-control devices (AICD's) are seen as a viable lower completion method to mitigate gas production while allowing oil production, but their effect on pressure drawdown must be carefully accounted for, in a context of particularly high export pressure. A first AICD completion was tested in 2020, after a careful selection amongst high-GOR wells and a diagnosis of underlying gas production mechanisms. The selected pilot is an open-hole horizontal drain closed due to high GOR. Its production profile was investigated through a baseline production log. Several AICD designs were simulated using a nodal analysis model to account for the export pressure. Reservoir simulation was used to evaluate the long-term performance of short-listed scenarios. The integrated process involved all disciplines, from geology, reservoir engineering, petrophysics, to petroleum and completion engineering. In the finally selected design, only the high-permeability heel part of the horizontal drain was covered by AICDs, whereas the rest was completed with pre-perforated liner intervals, separated with swell packers. It was considered that a balance between gas isolation and pressure draw-down reduction had to be found to ensure production viability for such pilot evaluation. Subsequent to the re-completion, the well could be produced at low GOR, and a second production log confirmed the effectiveness of AICDs in isolating free gas production, while enhancing healthy oil production from the deeper part of the drain. Continuous production monitoring, and other flow profile surveys, will complete the evaluation of AICD effectiveness and its adaptability to evolving pressure and fluid distribution within the reservoir. Several lessons will be learnt from this first AICD pilot, particularly related to the criticality of fully integrated subsurface understanding, evaluation, and completion design studies. The use of AICD technology appears promising for retrofit solutions in high-GOR inactive strings, prolonging well life and increasing reserves. Regarding newly drilled wells, dedicated efforts are underway to associate this technology with enhanced reservoir evaluation methods, allowing to directly design the lower completion based on diagnosed reservoir heterogeneities. Reduced export pressure and artificial lift will feature in future field development phases, and offer the flexibility to extend the use of AICD's. The current technology evaluation phases are however crucial in the definition of such technology deployments and the confirmation of their long-term viability.


2021 ◽  
Author(s):  
Emad Alabbasy Alabbasy ◽  
Ahmed Khamis Ahmed ◽  
Khalid Alwahedi Khaled ◽  
Abdulmohsen Al Marzooqi Abdulmohsen ◽  
Majid Hammadi Majid

Abstract With the objective to drill two wells shared from one conductor with independent wellhead and completion, ADNOC Offshore drilling team pioneered for the first time in Umm Lulu field and ADNOC UAE the Conductor sharing drilling technique. Which is to drill two wells from one single conductor in wellhead tower. Well planning technique drilling 42" hole and run 36" conductor, then install lower male connector and run conductor Down Hole Guide (DHG) assembly to be a guide for both two wells. Land the DHG on the lower male connector. Install upper male connector, which is equipped with two well slots for drilling the two wells. Drilling 1st 16" hole and run 13 3/8" casing and cemented. Skid over second slot and drill second hole 16" and run and cement 13 3/8" casing and carry out top up cement job for both hole up to surface inside 36" conductor. Install casing head housing for each well. Then each well could be drilled as per normal procedures. Well executing process. Well challenges: Drilling large hole 42" hole with 42" bit and BHA. Run 36" conductor and conductor sharing DHG and keep aligned for accessibility of BHA and casing Nudge 16" hole for both two wells at centre-to-centre distance 8" safely without collision issue. Run two 13 3/8" casing strings in 36" conductor and cement same up to surface. Complete drilling well UL-056 from slot A, drilled 12 ¼" hole section to TH-I ABS, run 9 5/8" casing and perform cement job to surface, drilled 6" hole (linerless design) and land in TH II then continued drilling horizontal drain to TD, Run completion and deliver the well. Suspend the other well in slot B at 13 3/8" casing with securing the well with abandonment cap and as per ADNOC offshore policy.


2020 ◽  
Vol 11 (1) ◽  
pp. 25-36
Author(s):  
Rokhmat Hidayat

The landslides event was triggered by rain infiltration is an annual occurrence in Indonesia, majority of landslide occur in rainy season. In this research, the case of landslide taken in Pangkalan Area, District of Limapuluh Kota, West Sumatera. The location of the case study is the main access of West Sumatra-Riau, so the landslide in the location is certainly causing close the road. Research phase is geology mapping, geotechnical analysis, and hydrological modeling. Hydrological modeling is done by numerical simulation using laboratory data. The modeling results show that the rain infiltration process resulted in the formation of positive water pressure zone at the foot of the slope, then spread towards the top of the slope.  One day after the rainfall, the soil layer had been saturated. The soil layer will saturate the water, so that the slope stability will decrease and the landslide event will occur. To improve the slope stability, it can be done by preventing water from entering the permeable layer with the installation of the shotcrete layer, and draining the water from the slopes by the installation of horizontal drain.


2015 ◽  
Author(s):  
Pungki Ariyanto ◽  
Mohamed.A.. A. Najwani ◽  
Yaseen Najwani ◽  
Hani Al Lawati ◽  
Jochen Pfeiffer ◽  
...  

Abstract This paper outlines how a drilling team is meeting the challenge of cementing a production liner in deep horizontal drain sections in a tight sandstone reservoir. It is intended to show how the application of existing technologies and processes is leading to performance gain and improvements in cementing quality. The full field development plan of the tight reservoir gas project in the Sultanate of Oman is based on drilling around 300 wells targeting gas producing horizons at measured depths of around 6,000m MD with 1,000m horizontal sections. Effective cement placement for zonal isolation is critical across the production liner in order to contain fracture propagation in the correct zone. The first few attempts to cement the production liner in these wells had to overcome many challenges before finally achieving the well objectives. By looking at the complete system, rather than just the design of the cement slurry, the following criteria areas were identified: –Slurry design–Mud removal and cement slurry placement–Liner hanger and float equipment Improvements have been made in each of these areas, and the result has been delivery of a succesfully optimised liner cementing design for all future horizontal wells.


2001 ◽  
Vol 16 ◽  
pp. 175-180
Author(s):  
Hideki YAMASAKI ◽  
Jinchun CHAI ◽  
Norihiko MIURA ◽  
Tadaaki NOMURA

Petroleum ◽  
2019 ◽  
Vol 5 (1) ◽  
pp. 35-41 ◽  
Author(s):  
Fadairo Adesina ◽  
Oladepo Adebowale ◽  
Adeyemi Gbadegesin

1994 ◽  
pp. 55-64
Author(s):  
Masahiro Okamoto ◽  
Yukio Ohami ◽  
Tej B. S. Pradhan ◽  
Goro Imai

Sign in / Sign up

Export Citation Format

Share Document