Dynamic Control Method and Application of Coastal Engineering Project Construction Cost Based on Rough Sets

2020 ◽  
Vol 115 (sp1) ◽  
pp. 7
Author(s):  
Daqing Zhang ◽  
Xiaobing Liu
2020 ◽  
Vol 4 (2) ◽  
pp. 42
Author(s):  
Jian Yin ◽  
Huiyun Zhou ◽  
Jing Yang

<p>With the development of economic globalization, the scale of international trade continues to expand. Ports are very important for cross regional transactions. However, the construction cost is also very high in the actual construction process because port engineering is a relatively large project. Cost management can effectively control the cost and improve the economic benefits of port engineering project construction. The traditional cost management model has been unable to meet the needs because the construction cost control is a dynamic process and runs through the whole process of the project. BIM information technology is a technology with engineering digital model as the core. Based on BIM, this article studies the refined cost management of port engineering project, and aims to provide some help for relevant practitioners.</p>


2013 ◽  
Vol 711 ◽  
pp. 790-793
Author(s):  
Dong Xiao Niu ◽  
Tong Liu ◽  
Shu Yi Zhou ◽  
Ting Ting Chen

In the process of engineering project construction, cost management should be closely around three big targets: cost control, quality control and progress control. This paper analyzes the interacting relationship of these factors, then discussing the elements of engineering cost management based on the earned value method. Finally, it proposed some corresponding suggestions and measures for the developing of cost management.


2013 ◽  
Vol 361-363 ◽  
pp. 674-681
Author(s):  
Wei Li

As more and more non-public fund entering rural drinking water safety engineering project market; it becomes very necessary to built rural drinking water safety engineering project guarantee mechanism. This paper proposes three steps of mechanism design. Firstly, history data is used to fit multivariate linear equation set up describing relationship between bank loss and key risk factors. Secondly, guarantee fee is calculated through model regression, which is threefold of possible bank loss. Thirdly, guarantee fee is adjusted according to variety of key risk factor in the process of project construction and operating.


2012 ◽  
Vol 594-597 ◽  
pp. 738-741 ◽  
Author(s):  
Yin Duan ◽  
Xing Hong Liu ◽  
Xiao Lin Chang

Main factors of the temperature control and crack prevention in arch dams are summarized. The Space-time Dynamic Control method in pipe cooling process and the Temperature Real-time Control and Decision Database System are introduced to help for temperature real-time control and rapid analysis. Successful application of these new techniques in the construction of Dagangshan arch dam indicates that the proposed method are of significant effectiveness on the temperature control and crack prevention, and have good application prospect in practical project.


2020 ◽  
Vol 2020 ◽  
pp. 1-16
Author(s):  
Lanjun Liu ◽  
Denghui Liu ◽  
Han Wu ◽  
Junwu Wang

To accurately predict the construction costs of foundation pit projects, a model based on the stacked denoising autoencoder (SDAE) is constructed in this work. The influencing factors of foundation pit project construction costs are identified from the four attributes of construction cost management, namely, engineering, the environment, the market, and management. Combined with Chinese national standards and the practice of foundation pit project management, a method of the quantization of the influencing factors is presented. 60 deep foundation pit projects in China are selected to obtain 13 main characteristic factors affecting these project construction cost by using the rough set. Then, considering the advantages of the SDAE in dealing with complex nonlinear problems, a prediction model of foundation pit project construction costs is created. Finally, this paper employs these 60 projects for a case analysis. The case study demonstrates that, compared with the actual construction costs, the calculation error of the proposed method is less than 3%, and the average error is only 1.54%. In addition, three error analysis tools commonly used in machine learning (the determination coefficient, root mean square error, and mean absolute error) emphasize that the calculation accuracy of the proposed method is notably higher than those of other methods (Chinese national code, the multivariate return method, the BP algorithm, the BP model optimized by the genetic algorithm, the support vector machine, and the RBF model). The relevant research results of this paper provide a useful reference for the prediction of the construction costs of foundation pit projects.


2012 ◽  
Vol 178-181 ◽  
pp. 2294-2298
Author(s):  
Jin Gan ◽  
Meng Ju Jin ◽  
Wei Guo Wu ◽  
Jin Yao

According to the characteristics and the development tendency of sea-crossing bridge construction, a concept of multi-purpose offshore operation platform for the construction of sea-crossing bridge is introduced in this paper. Meanwhile, the structure design plan and the features and advantages of the platform for sea-crossing bridge construction are listed in detail. The analysis shows that the multi-purpose offshore operation platform based on the modularization design concept could complete the tasks of sea-crossing bridge construction safely and efficiently. Due to the application of multi-purpose offshore operation platform, the construction cost of bridge should be reduced and the economy of project construction should be improved.