National Register Testing of a Railroad Embankment for the Hollygrove Drainage Improvements Feature, Southeast Louisiana Urban Flood Control Project, Orleans Parish, Louisiana

Author(s):  
EARTH SEARCH INC NEW ORLEANS LA
2014 ◽  
Vol 1065-1069 ◽  
pp. 2381-2385
Author(s):  
Sen Guo Zhan ◽  
Bao Hui Men ◽  
Jia Jie Wu ◽  
Zheng Da Duan

On 21 July 2012, a huge thunderstorm hit Beijing, prompting the city government to act immediately to deal with the emergency. Yet great losses were caused, exposing problems about urban flood control and drainage, and making people take a new look at them. It is not uncommon for a rainfall of such a degree to happen in Asia. Comparatively speaking, however, unlike in Beijing, fewer damages are caused in Taiwan, Japan and the Philippines given the same situation. In this article, therefore, the problems arising after a heavy rainfall and their solutions will be discussed.


2019 ◽  
Vol 1 (1) ◽  
pp. 29-34
Author(s):  
Mohammad Sofyan

The purpose of this study is to encourage ownership, responsibility and to develop stakeholders and policy makers for the river normalization program in the pre-construction, construction and post-construction stages. The use of the IPA method to measure community satisfaction in the quadrants on the Importance Performance Matrix map. The results of the study showed that the socialization from the Department of Water and Public Works, when the project was finished, was not in line with community expectations. Flood control projects that have been built, coordination with the contractor at the time of project implementation, socialization from the city government prior to project implementation, socialization from the city government when the project is finished, socialization from the river hall at the time before project implementation, socialization from the river hall at the time the project was completed, dissemination of information from the irrigation service prior to project implementation, and community involvement in project implementation. The process of land clearing, and the price agreement that has been reached. Improved land clearing, and price agreements that have been reached can be reconsidered because their impact on the benefits felt by the community is very small.


2019 ◽  
Vol 576 ◽  
pp. 478-493 ◽  
Author(s):  
Osvaldo Moura Rezende ◽  
Anna Beatriz Ribeiro da Cruz de Franco ◽  
Antonio Krishnamurti Beleño de Oliveira ◽  
Ana Caroline Pitzer Jacob ◽  
Marcelo Gomes Miguez
Keyword(s):  

2018 ◽  
Vol 19 (6) ◽  
pp. 1827-1838 ◽  
Author(s):  
Gangyan Xu ◽  
Junwei Wang ◽  
George Q. Huang ◽  
Chun-Hsien Chen

2013 ◽  
Vol 838-841 ◽  
pp. 1709-1714
Author(s):  
Xiu Yong Yi ◽  
Yang Zhang

Considering topography, climate, river system, and existing problems in Taiyuan, the urban flood control planning in Taiyuan boils down to the following points: determine the flood control standard according to the size of city; study the flood alleviating measures in the upstream area; provide adequate water and soil conservation measures in the mountainous areas reduce flash floods; divert flood from mountainous areas to the downstream area instead of to the urban; improve the river channels in the urban area; provide flood detention and retarding area in the downstream area; study non-engineering flood control measures.


2014 ◽  
Vol 641-642 ◽  
pp. 84-87
Author(s):  
Xin Wen ◽  
Guo Hua Fang

Currently, the development of flood control system of Nanjing City has been entering a new critical phase, facing some great challenging problems that never experienced before. To meet these challenges, this research initially reviewed the developing process of flood control system of Nanjing City after China's reform and opening up. Based on the analysis of current flood control situation, four major challenge of was summarized. To solve these problems, this research provided some productive suggestions for future development of flood control system of Nanjing City from six perspectives, namely principle of flood control, layout of flood control system, drainage system improvement, flood management, technology application and supporting measures.


Sign in / Sign up

Export Citation Format

Share Document