The Activated Sludge Model No. 2: biological phosphorus removal

1995 ◽  
Vol 31 (2) ◽  
pp. 1-11 ◽  
Author(s):  
W. Gujer ◽  
M. Henze ◽  
T. Mino ◽  
T. Matsuo ◽  
M. C. Wentzel ◽  
...  

The Activated Sludge Model No. 2 is introduced as a further development of Activated Sludge Model No. 1. Model No. 2 introduces phosphorus accumulating organisms (PAO) and allows us to simulate the behaviour of biological nutrient removal activated sludge systems. Typical wastewater composition and a set of stoichiometric and kinetic parameters are provided in order to make reasonable predictions. The model has not yet been calibrated or verified in any full-scale application. This report contains a simplified version of the full Model No. 2; the full model is published in the final report of the Task Group (Henze et al., 1994).

2003 ◽  
Vol 47 (11) ◽  
pp. 211-218 ◽  
Author(s):  
M. Wichern ◽  
M. Lübken ◽  
R. Blömer ◽  
K.-H. Rosenwinkel

In 1999, the Activated Sludge Model No. 3 by the IWA Task Group on Mathematical Modelling for the Design and Operation of Biological Wastewater Treatment was presented. The model is used for the simulation of nitrogen removal. The simulations in this paper were done on the basis of a new calibration of the ASM 3 by Koch et al., with the easily degradable COD measured by respiration. For modelling of EBPR the BioP-Module of Rieger et al., was used. Six German wastewater treatment plants were simulated during this research to test the existing set of parameters of the models on various large scale plants. It was shown that changes for nitrification and enhanced biological phosphorus removal in the set of biological parameters were necessary. Sensible parameters and recommended values are presented in this article. Apart from the values of the changed biological parameters, we will in our examination discuss the modelling of the different activated sludge systems and the influent fractioning of the COD. Two plants with simultaneous denitrification in the recirculation ditch (EBPR) are simulated, one with preliminary dentrification, one with intermittent denitrification (EBPR), one with cascade denitrification (EBPR), and one pilot plant according to the Johannesburg-process (EBPR) which was simulated over a period of three months.


2003 ◽  
Vol 47 (11) ◽  
pp. 115-122 ◽  
Author(s):  
J. Manga ◽  
J. Ferrer ◽  
A. Seco ◽  
F. Garcia-Usach

A mechanistic mathematical model for nutrient and organic matter removal was used to describe the behavior of a nitrification denitrification enhanced biological phosphorus removal (NDEBPR) system. This model was implemented in a user-friendly software DESASS (design and simulation of activated sludge systems). A 484-L pilot plant was operated to verify the model results. The pilot plant was operated for three years over three different sludge ages. The validity of the model was confirmed with data from the pilot plant. Also, the utility of DESASS as a valuable tool for designing NDEBPR systems was confirmed.


1983 ◽  
Vol 15 (3-4) ◽  
pp. 233-259 ◽  
Author(s):  
A R Pitman ◽  
S L V Venter ◽  
H A Nicholls

This paper describes three years operating experience with two full-scale biological nutrient removal activated sludge plants. Factors affecting biological phosphorus removal are highlighted and possible process improvements suggested.


2001 ◽  
Vol 44 (1) ◽  
pp. 49-56 ◽  
Author(s):  
M. Wichern ◽  
F. Obenaus ◽  
P. Wulf ◽  
K.-H. Rosenwinkel

In 1999 the Activated Sludge Model no. 3 (ASM 3) by the IWA task Group on Mathematical Modeling for Design and Operation of Biological Wastewater Treatment was presented. The model is used for simulation of nitrogen removal. On the basis of a new calibration of the ASM 3 with the easy degradable COD measured by respiration simulation runs of this paper have been done. In 2000 a biological phosphorus removal module by the EAWAG was added to the calibrated version of ASM 3 and is now serving the current requirements for modelling the enhanced biological P-removal. Only little experiences with different load situations of large-scale wastewater treatment plants were made with both new models so far. This article reports the experiences with the simulation and calibration of the biological parameters using ASM 3 and the EAWAG BioP Module. Three different large-scale wastewater treatment plants in Germany with different treatment systems will be discussed (Koblenz: pre-denitrification; Hildesheim: simultaneous denitrification with EBPR; Duderstadt: intermediate denitrification with EBPR). Informations regarding the choice of kinetic and stoichiometric parameters will be given.


1995 ◽  
Vol 31 (2) ◽  
pp. 13-23 ◽  
Author(s):  
M. Henze ◽  
W. Gujer ◽  
T. Mino ◽  
T. Matsuo ◽  
M. C. Wentzel ◽  
...  

The characterization of wastewater and biomass in relation to the Activated Sludge Model No. 2 is described. A new fraction of organic fermentable matter is needed. Phosphate accumulating organisms and their structural compounds polyphosphate and polyhydroxyalkanoate have to be included in the biomass characterization. There is still a need for development of analytical methods for characterization of the various components.


RSC Advances ◽  
2020 ◽  
Vol 10 (5) ◽  
pp. 2495-2506
Author(s):  
Hai Cui ◽  
Shan-Shan Yang ◽  
Ji-Wei Pang ◽  
Hai-Rong Mi ◽  
Chen-Chen Nuer ◽  
...  

An extended activated sludge model no. 2 provides a new recognition of the contributions of both loosely- and tightly-bound EPS into phosphorus removal by incorporating their formation and degradation processes during the anaerobic–aerobic cycle.


Sign in / Sign up

Export Citation Format

Share Document