The economic-mathematical model of geotechnological strategy for the mining of transition areas at the consecutive scheme of the combined mining of ore deposits, representing a set of the methods for determining the parameters and indicators of the mining technical system, the evaluation algorithm and the corresponding computer program, was created. In the result of modeling the developed options of geotechnical strategy with different the condition of quarry, sequence of mining, method and scheme of opening, mining system, method of isolation goaf from quarry, method of utilization of wastes from mining and mineral processing, the optimal option was selected on proposed complex environmental and economical criterion.