scholarly journals Būvprojekta apstiprināšana Latvijā 1920.–1940. gadā

Author(s):  
Zoja Bruģe ◽  

The article considers the legal aspects of construction law in Latvia in 1920–1940, describing historical legal aspects of the building plan (construction project, building design) approval process. Requirement to approve the building plan was the main precondition for implementing the idea of construction. The article is the first study about legal aspects of the construction industry on the issue of the building plan approval process in Latvia in 1920–1940.

2015 ◽  
Vol 7 (6) ◽  
pp. 162 ◽  
Author(s):  
Shijing Liu ◽  
Benzheng Xie ◽  
Linda Tivendal ◽  
Chunlu Liu

<p>Building Information Modelling (BIM) is one of the most significant technological advances in the building design and construction industry to date. Implementation of BIM has increased significantly over the past decade; and it enables the different stakeholders of a construction project to collaborate better throughout its lifecycle, and improves the opportunities to share data and decrease consumption. However, the implementation of BIM lags far behind its potential due to the existence of various barriers. This paper aims at identifying, classifying, and prioritising these barriers to BIM implementation through a survey. The research findings are expected to assist major stakeholders in the construction industry to promote BIM implementation.</p>


High rise office building design is one of the essential buildings in construction industry due to the limited space especially in the urban area. After home, a high rise office building is an important space for human in modern era. Due to the issue of high energy consumption especially inefficient artificial light strategy, side-day lighting becomes the best solution for a high rise office building design. Despite providing efficient energy consumption, side-day lighting creates a positive impact to the worker as well as the office's indoor environment. Hence, this paper aims to explore the basic passive side-day lighting considerations that educate people especially for those who are involved in the building construction industry. Beside, this paper focuses on the passive design considerations due to the various advantages that not involved especially with complex electrical and mechanical system. A systematic literature review is the main methodology for this paper to identify the basic passive side-day lighting considerations for a high rise office building design. Base on this research, it revealed that eight elements for building design considerations should be applied to provide a better day lighting impact for a high rise office building design. Considerations for non-building design aspects should also need to be applied since those aspects contribute to produce a better day lighting impact for a high rise office building design.


2017 ◽  
Vol 1 (1) ◽  
pp. 39-52
Author(s):  
Ibrahim Saidu ◽  
W Shakantu ◽  
A Adamu ◽  
I Anugwo

The problems of material waste and cost overruns are common in the construction industry. These problems occur at different stages of a construction project, from planning, design to project completion. The argument on how to eliminate cost overrun has been on-going for the past 70 years as on-site wastage of materials leads to increase in the final project cost. This paper examines the relationship between the causes of material waste and those of cost overrun at the pre-contract and post-contract stages of a project. The desktop methodological approach was firstly adopted in comparing the causes of material waste and those of cost overruns from the literature, in order to determine the possible relationship. Subsequently, interviews were purposively conducted with construction professionals within Abuja, Nigeria, in order to verify the literature based information. The result reveals that all the causes of material waste also cause cost overrun at the pre-contract and the post-contract stages of a project. 96.88% and 81.81% of the causes of cost overrun also cause material waste at the pre-contract and post-contract stages respectively. Other causes which are not related are mostly, the micro-economic and macro-economic factors. These results are not different from those of the interviews conducted with professionals and summarised in the tick box. It was also found that to achieve Effective Construction Material Waste Management (ECMWM) for any construction project, material waste must be controlled at its sources and causes, and at different stages of a project. Based on these findings, it can be concluded that effective management of material waste would translate into a reduction in the level of project cost overrun. The study recommends that construction-project managers, as well as the construction practitioners should encourage the management of material-waste causes, as it has the potential to minimise cost overrun for projects. 


2018 ◽  
Vol 11 (3) ◽  
pp. 761-782 ◽  
Author(s):  
Shamil George Naoum ◽  
Carlos Herrero ◽  
Charles Egbu ◽  
Daniel Fong

Purpose It is axiomatic that construction is a fast-paced and competitive industry, which goes hand in hand with many construction professionals suffering from stress including construction project managers (C-PMs). The role of C-PMs is crucial to achieving project success as they are responsible for planning the project, organising human resources, controlling operations and the budget, and forecasting probable difficulties. The purpose of this paper is to investigate the causal relationships between stressors, stresses, stress-coping behaviours and their impact on the performance of C-PMs. Design/methodology/approach To investigate the relationships between stress and performance among C-PMs, a questionnaire was designed based on the extensive literature, and was sent to 150 C-PMs who had amassed at least five years’ direct working experience in the construction industry. A total of 44 completed questionnaires were returned. Correlation analysis and structural equation modelling were employed to understand the integrated relationships between these factors. Based on the data collected and analysis of the results, an integrated structural equation model of the stresses and performances of C-PMs was developed using AMOS version 22.0. Findings The results of structural equation modelling reveal the following: burnout is the type of stress that has the highest impact on the performance of C-PMs, being detrimental to their interpersonal performance (IPP) and positive for their organisational performance (OP), whereas physiological stress worsens the task performance of C-PMs and objective stress improves their IPP. The most active stressor towards the performance of C-PMs is “workgroup cooperation”, which has an impact on the IPP in a positive way but is detrimental to the OP. Career-developing environment, poor organisational structure and role conflict affect both stress and performance together. Originality/value This study provides a comprehensive investigation into the impact of various types of stress on the performances of C-PMs. The result constitutes a significant step towards the stress management of C-PMs in the dynamic and stressful construction industry.


Author(s):  
Clinton Aigbavboa ◽  
Neo Malose Masemeni ◽  
Wellington Thwala

This chapter report on some of the challenges faced and successes achieved during the construction of the recently completed Department of Environmental Affairs (DEA) headquarters in South Africa. Qualitative interviews where conducts with five (5) professionals which were part of the construction supply chain team that completed the DEA project in South Africa. Findings summary were that the South African construction industry exists in a very dynamic and volatile environment with common challenges as evident in other countries. This challenge, necessitates the use of collaborative means of managing the various phases of the supply chain. It was also found that the use of collaborative models such as Public Private Partnership (PPP) can prove rewarding when stakeholders involved in a project have an understanding of the model and its dynamics. This chapter contributes to the use of PPP collaborative models in construction project delivery in South Africa.


Sign in / Sign up

Export Citation Format

Share Document