scholarly journals THE RELATIONSHIP OF SKILLED LABOUR SHORTAGES AND PROJECT PERFORMANCE IN CONSTRUCTION INDUSTRY: A CONCEPTUAL FRAMEWORK

2021 ◽  
Vol 1 (1) ◽  
pp. 1-21
Author(s):  
Nurul Safwah Mohd Yusoff ◽  
Faizul Azli Mohd Rahim ◽  
Loo Siaw Chuing

The construction industry is recognised as one of the major economic sectors that significantly contribute to socio-economic development. However, the skilled labour shortage is one factor that affects the success of projects in the construction industry. Therefore, this paper aims to study the effects of skilled labour shortages on construction project performance. A questionnaire survey was conducted with 42 construction practitioners. The hypotheses were tested by using a Partial Least Square (PLS) method. The results indicate that project-related factors and human capital factors affecting skilled labour shortages in construction projects and skilled labour shortages have affected construction projects’ performance. This finding’s implication is useful for construction industry players by better understanding successfully managing construction projects.

2020 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benti Gadisa ◽  
Hong Zhou

PurposeIt is well recognized that the construction industry is characterised by inefficient and ineffective service delivery due to various causative factors. Thus this study aims to examine the influential factors affecting public construction project performance in Ethiopia to improve the industry's service delivery.Design/methodology/approachFrom the extensive literature reviewed, 58 potential factors affecting construction project performance have been compiled. Based on the evidence accumulated, the conceptual model of this paper has been developed. By using survey questionnaires, valuable data were collected from the construction industry professionals in Ethiopia; analysed and interpreted with the use of both SPSS and AMOS software.FindingsIt is concluded that failure factors related to the “performance” of the contractor, the “capability” of the owner, the “project design-procurement process,” and project contract management can significantly contribute to the poor performance of public construction projects in Ethiopia. Ten key factors include inadequate contractor capacity, weak project site management and supervision, weak project management skills and capabilities of the owner, additional work orders, delayed payment, lack of comprehensive project plans between parties and incomplete project design, rising material prices, ineffective project schedules, and cost management, rising market prices and devaluation of the currency.Research limitations/implicationsThe scope of this study confined to public projects in Ethiopia. It suggests that further research needs to consider public and private construction from a comprehensive perspective in the developing countries.Practical implicationsIt provides practitioners with information and guidance on the factors that affect the performance of construction projects.Originality/valueIt provides inclusive evidence related to many factors that affect the performance of public construction projects.


Author(s):  
Zairra Mat Jusoh ◽  
◽  
Narimah Kasim ◽  
Mansir Dodo ◽  
◽  
...  

Effective materials management has a significant role in the success of any construction projects. Understanding the factors related to the management effectiveness may assist the decision-makers of construction firms to allocate resources in the best possible manner in managing materials when implementing construction projects. However, limited studies have explored and investigated the associated factors of effective materials management related to project performance, especially in the Malaysian construction industry context. Thus, this research paper aims to investigate the influential factors of effective materials management and their effects on project performance. A partial least square-structural equation modelling (PLS-SEM) approach was employed to analyse 202 pieces of data collected from a questionnaire survey. The results indicate that the effective materials management has a positive significant impact on project performance. The top three groups of factors that contribute to this management effectiveness are transportation, management, and purchasing; meanwhile, the most implied factors of the effective materials management are waste, cost and time of project performance. To increase project performance, more resources should be allocated to improve the transportation, management and purchasing components of materials management.


2019 ◽  
Vol 19 (4) ◽  
pp. 550-569 ◽  
Author(s):  
Maan Nihad Ibrahim ◽  
David Thorpe ◽  
Muhammad Nateque Mahmood

Purpose The purpose of this paper is to investigate a set of risk-related factors influencing the earned value management (EVM) concept as an assessment technique in evaluating the progress of modern sustainable infrastructure construction projects. Design/methodology/approach A qualitative research approach has been adopted for identifying risk-related factors influencing EVM concept from a literature review and through interviewing industry personnel, followed by an inductive process to form sets of key factors and their measuring items. Findings EVM is a common method for assessing project performance. A weakness of this approach is that EVM assessment in its current form does not measure the impact of a number of project performance factors that result from the complexity of modern infrastructure construction projects, and thus does not accurately assess their impact in this performance. This paper discusses and explains a range of potential risk factors to evaluating project performance such as sustainability, stakeholder requirements, communication, procurement strategy, weather, experience of staff, site condition, design issues, financial risk, subcontractor, government requirements and material. In addition, their measuring items were identified. Practical implications This research assists projects managers to improve the evaluation process of infrastructure construction performance by incorporating a range of factors likely to impact on that performance and which are not included in current EVM calculations. Originality/value This research addresses the need to include in the EVM calculation a range of risk factors affecting the performance of infrastructure projects in Australia and therefore makes this calculation a more reliable tool for assessing project performance.


2020 ◽  
Vol 20 (3) ◽  
Author(s):  
Amy Marisa ◽  
Nor'Aini Yusof

The construction industry has been accused of ineffectiveness and inefficiency because of delays, cost overruns and defects that are partly due to flaws in the design. As professionals responsible for design, architects should achieve optimum performance in the project delivery process. This study aims to investigate the factors that influence the performance of architects in construction projects. This study employs a questionnaire survey for data collection and partial least square structural equation modelling (PLS–SEM) for data analysis. Using a census method, a total of 222 useable responses are gathered from registered architects in Indonesia. Results reveal significant and positive relationships between working condition, organisational support and effective design process and the performance of architects. The strongest effect is found from the influence of effective design process on the performance of architects. Thus, these factors should be applied to enhance the performance of architects, thereby improving the project outcome.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2021 ◽  
Vol ahead-of-print (ahead-of-print) ◽  
Author(s):  
Benviolent Chigara ◽  
Tirivavi Moyo

Purpose The purpose of this study was to investigate the perceptions of construction professionals relative to factors that affect the delivery of optimum health and safety (H&S) on construction projects during the COVID-19 pandemic. Design/methodology/approach The study adopted a quantitative design which entailed the distribution of a web-based questionnaire among construction professionals, namely, architects, construction/project managers, engineers, H&S managers and quantity surveyors working for contractors and construction consultants in Zimbabwe. The data were analysed with descriptive and inferential statistics. Factor analysis was used to reveal interrelated significant sets of factors affecting the delivery of optimum H&S. Findings Factor analysis revealed nine components/factors: change and innovation-related, monitoring and enforcement-related, production-related, access to information and health service-related, on-site facilities and welfare-related, risk assessment and mitigation-related, job security and funding-related, cost-related and COVID-19 risk perception-related factors as the significant factors affecting the delivery of optimum H&S during the COVID-19 pandemic in Zimbabwe. Research limitations/implications The results highlighted the need for social dialogue among construction stakeholders to support initiatives that will enhance the delivery of H&S on construction projects. Construction stakeholders may find the results useful in highlighting the areas that need improvement to protect workers’ H&S during the pandemic. However, the small sample limits the generalisability of the results to construction sectors in other regions. Originality/value The study investigated factors affecting the delivery of optimum H&S during the COVID-19 to inform interventions to enhance H&S.


2020 ◽  
Vol 2020 ◽  
pp. 1-10
Author(s):  
Thu Anh Nguyen ◽  
Phong Thanh Nguyen ◽  
Sy Tien Do

The construction industry has played an essential role in the process of modernization and industrialization and it has also been a major factor in determining the development of the infrastructure for other economic sectors. Construction companies consider the measurement of work progress, which often wastes time and has a low resolution, to be one of the most challenging problems faced by project management. Therefore, this research aimed to propose practical solutions by applying recent technological achievements of the 4.0 industrial revolution to improve the efficiency of the quantity management process. By utilizing the advantages and features of a BIM model and 3D laser scanning, this paper proposes that adopting a BIM model and 3D laser scanning has the potential to improve the accuracy and efficiency of the quantity management process. The case study demonstrated some typical tasks to evaluate accuracy and efficiency as well as to showcase the research proposal.


2021 ◽  
Vol 2 (4) ◽  
pp. 537-550
Author(s):  
Christina Catur Widayati ◽  
Sarton Sinambela ◽  
Magito Magito ◽  
Khilyatin Ikhsani

The purpose of this study is to find out the factors which affect on purchase decision of fake (non-genuine) Nike sports shoes. Data analysis generally confirms the structural relationship of all variables, namely price and country of origin on brand image and its impact on purchase decision for fake (non-genuine) Nike shoes. This research was conducted on Gold's Gym consumers in the city area of ​​West Jakarta with a sample size of 130 respondents. The data analysis method used in this study is the Component or Variance Based Structural Equation Model where the data processing used Partial Least Square (Smart-PLS) version 3.2.9. The results show that all hypotheses can be accepted, except for the third hypothesis, which indicates that the country of origin does not effect on purchase decision.


2021 ◽  
Vol 14 ◽  
pp. 1-9
Author(s):  
Jeffrey Boon Hui Yap ◽  
Shi Min Tan

Construction practitioners recognise that rework is undesirable due to the detrimental effects. While rework literature has examined rework causation factors in construction projects, the problem continues to plague the industry resulting in poor delivery performance. To better understand this phenomenon and given the scarcity of Malaysian-based rework study, a questionnaire survey involving 130 Malaysian construction practitioners (consultants, contractors and clients) were undertaken to obtain feedback about nature, implications, causes and solutions for rework. Data were analysed using descriptive statistical techniques to prioritise the variables studied. From the analyses, rework is a causal factor for delays and cost overruns, higher wastage and productivity inhibitor. The findings revealed the leading causes of rework are poor quality management, improper planning, lack of communication, design changes and poor subcontractor management. Some practical rework minimisation approaches are also suggested to better manage and prevent rework towards enhanced project performance.