On the Cost and the Conditions of Working Railway Traffic in Different Countries

1886 ◽  
Vol 49 (4) ◽  
pp. 693
Author(s):  
J. S. Jeans
Keyword(s):  
2021 ◽  
Vol 133 ◽  
pp. 15-26
Author(s):  
Paweł Drózd ◽  
Adam Rosiński

The paper presents the issues of railway traffic control devices testing and focuses on European Train Control System (ETCS) devices widely implemented in railways. The functions of the ETCS system, principles of operation are described. The basic telegrams transmitted in the track-to-train relation are listed. The process of designing and verifying the implemented data and what parameters are checked at the stage of field tests using the locomotive is briefly described. The functional model of the SRK devices, including ETCS elements, was presented, and the close relationship between the base layer of the railway traffic control devices and the ETCS was shown. Equipment testing reduces the availability of the rail network, engages staff, and generates costs. A test generation method is presented to minimize the impact. Two indicators are proposed for reducing the set of checks, the cost of checking and the information effectiveness. The cost of checking due to the problematic estimate is generalized, divided into three groups taking into account the difficulty and resource consumption of bringing the devices to the initial state and their operation according to the test. Therefore, the obtained set of checks is suboptimal and ensures complete coverage of the functions with tests, which is essential when testing devices. The tests are carried out using available setting commands and the implementation of tasks - entry and exit routes at the station. The proposed method is universal and can be applied to any railway traffic control device, regardless of the manufacturing technology. It is a non-invasive method in the structure of the tested devices and does not require additional hardware resources.


2017 ◽  
Vol 2017 (6) ◽  
pp. 1-12
Author(s):  
Filip Pachla ◽  
Bartosz Radecki-Pawlik ◽  
Krzysztof Stypuła ◽  
Tadeusz Tatara

The work presents the design process of vibration isolation for a building subjected to the influence of railway vibrations. This process is illustrated on the example of the railway control building in Biała Rawska, realized within the framework of the investment whose the general contractor was PORR Poland Construction S.A. Measurements of railway vibrations at the site of the planned building were made. The building calculation model was performed and then the vibration isolation parameters of the building were calculated based on the simulation calculations of this model. The purpose of the described design work was to limit the impact of vibration on the people and the equipment in the computer server room located in this building. The original design of the rail track vibration insulation was replaced by the building vibration project. This allowed to optimize work time, reduced railway traffic interruptions and the cost of vibration isolation.


Author(s):  
James F. Mancuso

IBM PC compatible computers are widely used in microscopy for applications ranging from control to image acquisition and analysis. The choice of IBM-PC based systems over competing computer platforms can be based on technical merit alone or on a number of factors relating to economics, availability of peripherals, management dictum, or simple personal preference.IBM-PC got a strong “head start” by first dominating clerical, document processing and financial applications. The use of these computers spilled into the laboratory where the DOS based IBM-PC replaced mini-computers. Compared to minicomputer, the PC provided a more for cost-effective platform for applications in numerical analysis, engineering and design, instrument control, image acquisition and image processing. In addition, the sitewide use of a common PC platform could reduce the cost of training and support services relative to cases where many different computer platforms were used. This could be especially true for the microscopists who must use computers in both the laboratory and the office.


Author(s):  
H. Rose

The imaging performance of the light optical lens systems has reached such a degree of perfection that nowadays numerical apertures of about 1 can be utilized. Compared to this state of development the objective lenses of electron microscopes are rather poor allowing at most usable apertures somewhat smaller than 10-2 . This severe shortcoming is due to the unavoidable axial chromatic and spherical aberration of rotationally symmetric electron lenses employed so far in all electron microscopes.The resolution of such electron microscopes can only be improved by increasing the accelerating voltage which shortens the electron wave length. Unfortunately, this procedure is rather ineffective because the achievable gain in resolution is only proportional to λ1/4 for a fixed magnetic field strength determined by the magnetic saturation of the pole pieces. Moreover, increasing the acceleration voltage results in deleterious knock-on processes and in extreme difficulties to stabilize the high voltage. Last not least the cost increase exponentially with voltage.


1994 ◽  
Vol 58 (11) ◽  
pp. 832-835 ◽  
Author(s):  
ES Solomon ◽  
TK Hasegawa ◽  
JD Shulman ◽  
PO Walker
Keyword(s):  

1998 ◽  
Vol 138 (2) ◽  
pp. 205-205
Author(s):  
Snellman ◽  
Maljanen ◽  
Aromaa ◽  
Reunanen ◽  
Jyrkinen‐Pakkasvirta ◽  
...  
Keyword(s):  

2004 ◽  
Vol 171 (4S) ◽  
pp. 40-40
Author(s):  
Leslee L. Subak ◽  
Stephen K. Van Den Eeden ◽  
Jeanette S. Brown ◽  
Arona I. Ragins ◽  
Eric Vittinghoff ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document