Monitoring of Seismic Activation in the Area of the Kaltan Open Pit and Alardinskaya Mine (Kuzbass)

2020 ◽  
Vol 56 (1) ◽  
pp. 82-92
Author(s):  
A. A. Emanov ◽  
A. F. Emanov ◽  
A. V. Fateev
Keyword(s):  
Open Pit ◽  
2012 ◽  
Vol 57 (2) ◽  
pp. 363-373
Author(s):  
Jan Macuda

Abstract In Poland all lignite mines are dewatered with the use of large-diameter wells. Drilling of such wells is inefficient owing to the presence of loose Quaternary and Tertiary material and considerable dewatering of rock mass within the open pit area. Difficult geological conditions significantly elongate the time in which large-diameter dewatering wells are drilled, and various drilling complications and break-downs related to the caving may occur. Obtaining higher drilling rates in large-diameter wells can be achieved only when new cutter bits designs are worked out and rock drillability tests performed for optimum mechanical parameters of drilling technology. Those tests were performed for a bit ø 1.16 m in separated macroscopically homogeneous layers of similar drillability. Depending on the designed thickness of the drilled layer, there were determined measurement sections from 0.2 to 1.0 m long, and each of the sections was drilled at constant rotary speed and weight on bit values. Prior to drillability tests, accounting for the technical characteristic of the rig and strength of the string and the cutter bit, there were established limitations for mechanical parameters of drilling technology: P ∈ (Pmin; Pmax) n ∈ (nmin; nmax) where: Pmin; Pmax - lowest and highest values of weight on bit, nmin; nmax - lowest and highest values of rotary speed of bit, For finding the dependence of the rate of penetration on weight on bit and rotary speed of bit various regression models have been analyzed. The most satisfactory results were obtained for the exponential model illustrating the influence of weight on bit and rotary speed of bit on drilling rate. The regression coefficients and statistical parameters prove the good fit of the model to measurement data, presented in tables 4-6. The average drilling rate for a cutter bit with profiled wings has been described with the form: Vśr= Z ·Pa· nb where: Vśr- average drilling rate, Z - drillability coefficient, P - weight on bit, n - rotary speed of bit, a - coefficient of influence of weight on bit on drilling rate, b - coefficient of influence of rotary speed of bit on drilling rate. Industrial tests were performed for assessing the efficiency of drilling of large-diameter wells with a cutter bit having profiled wings ø 1.16 m according to elaborated model of average rate of drilling. The obtained values of average rate of drilling during industrial tests ranged from 8.33×10-4 to 1.94×10-3 m/s and were higher than the ones obtained so far, i.e. from 181.21 to 262.11%.


Author(s):  
V. V. Agafonov ◽  
V. Yu. Zalyadinov ◽  
M. E. Yusupov ◽  
N. S. Bikteeva

Sustainability of mining companies is of of high concern. The problem is specifically acute at companies that are monotownor monosettlement-forming. Sustainability of a mine depends in many ways on product quality and production resource-intensity. This article discusses formation of mineral quality indexes in terms of an open pit chrysotile mine. The studies took into account specific features of operation procedures implemented by each structural division of the mine. The analysis has found managerial and technological inconsistencies which affect quality and marketable product output, as well as efficiency of the mine in whole. The background for efficiency enhancement at a company is, by the authors’ opinion, consolidation of personnel subject to the single development strategy, namely: improvement of production and control efficiency, as well as use of available reserves and resources by means of better setup for production. The proposed approaches to planning mining operations and forming mineral quality allow higher quality of processing stock. In addition, a new model proposed for interaction between structural divisions of a mining company ensures improvement of general production indexes.


Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


Author(s):  
E. A. Vakulin ◽  
V. A. Ivashkevich ◽  
E. I.I. Gnitsak ◽  
V. S. Baikin ◽  
S. P. Maslyukov

Uniform schedule maintenance of mining and haulage machines is one of the key conditions for increasing productive time of maintenance personnel and decreasing monthly average servicing time. Currently, Russian mines infringe regulated maintenance schedule aimed to improve output per shift. The loss of time of maintenance personnel and equipment as a consequence maintenance irregularity is never assessed. This article presents assessment results on maintenance schedule uniformity in terms of dump trucks BelAZ-7513 and BelAZ-7530 at Chernogorsky open pit mine, SUEK-Khakassia. A variant of calculation of time loss owing to inconsistent maintenance schedule for dump trucks is proposed. The loss of time by maintenance personnel and by mining/haulage machines is assessed. The fleet of dump trucks BelAZ-7513 and BelAZ-7530 is analyzed depending on overtime of operation between maintenance periods. It is recommended to improve uniformity of maintenance schedule for mining and haulage equipment.


Author(s):  
E. A. Vakulin ◽  
A. I. Zayats ◽  
V. A. Beklemeshev ◽  
V. A. Ivashkevich ◽  
V. A. Khazhiev ◽  
...  

Investigation of failures is one of the critical activities of mining and haulage equipment operability assurance in mining. Maintaining failure investigation at the required quality level, it is possible to identify provisions, rules and procedures that should be revised or changed, operation conditions that should be improved, additional personnel training, if required, etc. Investigation of failures in mines is under responsibility of machine men and electricians of maintenance and operation services. In reality, factory management and setup for production condition weak concernment of these workers in quality investigation aimed at finding of sources of equipment failures. This article describes real-life results achieved in development and use of maintenance service operation, technology and management monitoring. The requirements are substantiated for quality improvement in failure cause finding and removal in mining and haulage equipment at Chernogorsky open pit mine, SUEK-Khakassia. Causes of the present quality of failure investigation by machine men of Chernogorsky Repair and Engineering Works and Chernogorsky open pit mine are revealed. The proposed recommended practices will improve quality of mining and haulage equipment failure investigation.


Author(s):  
T. V. Galanina ◽  
M. I. Baumgarten ◽  
T. G. Koroleva

Large-scale mining disturbs wide areas of land. The development program for the mining industry, with an expected considerable increase in production output, aggravates the problem with even vaster territories exposed to the adverse anthropogenic impact. Recovery of mining-induced ecosystems in the mineral-extracting regions becomes the top priority objective. There are many restoration mechanisms, and they should be used in integration and be highly technologically intensive as the environmental impact is many-sided. This involves pollution of water, generation of much waste and soil disturbance which is the most typical of open pit mining. Scale disturbance of land, withdrawal of farming land, land pollution and littering are critical problems to the solved in the first place. One of the way outs is highquality reclamation. This article reviews the effective rules and regulations on reclamation. The mechanism is proposed for the legal control of disturbed land reclamation on a regional and federal level. Highly technologically intensive recovery of mining-induced landscape will be backed up by the natural environment restoration strategy proposed in the Disturbed Land Reclamation Concept.