IMPROVEMENT OF EXPRESS METHOD OF HYDRODYNAMIC WELL TESTING IN THE CONDITIONS OF OIL AND GAS FIELDS OF OIL AND GAS PRODUCTION DEPARTMENT «YAMASHNEFT»
Keyword(s):
To increase the efficiency of hydrodynamic well testing after the geological and technical measures, it is proposed to record the pressure change at the bottom of the well during the development by means of the GIC. Such a solution will allow to combine the process of well development after the IPF with the study, thereby increasing the control over the success of the repairs carried out without additional downtime in real time.
Keyword(s):
2003 ◽
Vol 20
(1)
◽
pp. 17-59
◽
2019 ◽
Vol 2019
(4)
◽
pp. 46-59
Keyword(s):
Keyword(s):
2019 ◽
pp. 7-19
Keyword(s):
2021 ◽
pp. 78-82
2021 ◽
Vol 3
(37)
◽
pp. 53-66