scholarly journals COMPETITIVE ANALYSIS OF ELECTRONIC TRADING SITES OF THE PUBLIC PROCUREMENT SYSTEM ON THE INTERNET

Author(s):  
A. Riabchyk
2021 ◽  
Vol 4 (4(60)) ◽  
pp. 6-10
Author(s):  
Nataliia Pochynok ◽  
Volodymyr Muravskyi ◽  
Volodymyr Farion

The object of research is the public procurement system in terms of accounting for the processes of buying (selling) goods (works, services) using electronic communications. A problematic aspect of modern electronic public procurement platforms is the lack of information support for accounting, control and taxation functions. In the context of the development of innovative computer and communication technologies, it becomes possible to integrate various electronic services and electronic communications into the public procurement system in order to automate accounting processes. In the process of studying the prospects for the implementation of a system of public communications with expanded functional capabilities, general scientific empirical, logical and historical methodological methods of cognition of reality were used. The theoretical and methodological aspects of improving the accounting of public procurement in the context of the formation of an innovative electronic platform for business communications were studied on the basis of institutional and innovative methods of scientific research. The paper proposes to place electronic contracts at the heart of the business communications system. A procedure has been developed for business interaction between participants in electronic trading through the mechanism for concluding and executing electronic contracts for the purchase (sale) of goods (works, services). Based on the creation of a system of electronic contracts, it is possible to form a database of credentials. The expediency of using accounting information for the automated implementation of public procurement accounting procedures has been substantiated. The methodology for accounting for the occurrence and repayment of accounts payable and receivable for purchased (sold) goods (works, services), charging and paying taxes and fees, electronic money transactions in various currencies, electronic money and cryptocurrency, the occurrence of credit obligations, calculating the amount of bad debts has been improved. The implementation of a public procurement system with expanded functionality will facilitate the establishment of effective business communications with contractors, the integration of disparate electronic services into a single system. As well as minimizing costs in the process of electronic trading, automating the processing of primary information, optimizing accounting and management processes at the enterprise.


2020 ◽  
Vol 16 (5) ◽  
pp. 860-884
Author(s):  
V.G. Kogdenko ◽  
A.A. Sanzharov

Subject. The article deals with the analysis of suppliers in the public procurement system based on reasonable prequalification parameters. Objectives. The aim is to test the hypothesis about strong reputation characteristics of the winners in the public procurement system and develop a methodology for assessing the reputation of suppliers for prequalification purposes. Methods. We employ general scientific principles and methods of research, like abstraction, generalization of approaches used by domestic and foreign authors for prequalification and assessment of reputation of public procurement participants. Results. To test the hypothesis, we calculated four groups of indicators on corporate, financial, market, and social components of reputation. The methodology was tested on the data obtained from SPARK-Interfax and SPARK-Marketing information resources. Conclusions. The study revealed that not all reputational characteristics of public procurement winners can be regarded as high level. In terms of the corporate component, it is the low level of share capital, indicating the mistrust on the part of owners and their reluctance to invest in the business, and the low percentage of non-current assets. In terms of the market component, it is a low sales growth rate, as well as low return on sales. As to the financial component, it is a low capitalization of winners, low share of long-term debt capital and low credit limit. With respect to the social component, it is a below-average tax burden.


Author(s):  
Yernur Mukhtar ◽  
Yuri Toluev

The relevance of this research topic lies in the fact that public procurement requires in-depth consideration and comprehensive analysis, including the scientific and methodological level of analysis. The use of special legal documents in public procurement and the specific procedure for the execution of these documents is not a factor in the full understanding of this direction, including the economic assessment of the entire process. An economic and statistical approach using system analysis is required, which was used by the authors of the scientific article as the proposed research methodology. One of the main parts of the progressive process of commodity exchange in the economies of the analyzed countries is the mechanism for building public procurement. Currently, the problem of material and technical support of public needs in developed countries is solved as a result of logistics processes in the system of public procurement through the acquisition and supply of goods, works, and services, tangible and intangible resources. The article submits a review of foreign experience in building a public procurement system with special features characteristic of this region of the world, presented as an object of research. Country aspects in the object under study and allowed the authors to formulate the relevant main results and conclusions concerning various parties in the public procurement system, which determined the further strategy to improve the procurement system of the government and international integration union. Key words: public procurement (PP), regulation of the public procurement system, government orders, entrepreneurship, international regional institutions, regulation of the public procurement system, procurement, USA, European Union (EU), Poland, Germany, World Bank.


Author(s):  
Ahmed Alofi ◽  
Yasir Alhammadi ◽  
Dean Kashiwagi ◽  
Kenneth Sullivan

Saudi Arabia has had many issues in delivering mega construction projects, such as delays, high costs, and low customer satisfaction. Some studies show that around 70% of public projects in Saudi Arabia are delayed. One factor that might be causing these performance issues is the traditional low bid contracting system in Saudi Arabia, or the Saudi procurement system. In Saudi Arabia, owners select contractors based only upon the lowest price. This paper researched ways to modify the current Saudi procurement system and show quick and simple modifications that can be done to improve the low performance. This research proposes that by adding the clarification phase from the Performance Information Procurement System (PIPS) to the Saudi traditional procurement process could greatly improve construction performance. The clarification phase requires the selected contractor to submit a project scope, detailed and milestone schedule, potential risks that they do not control, and performance measurement before a contract is awarded. The PIPS system is one of the most successful systems around the world, which shows success rate of 98% in six different countries with risk and cost reduction up to 30%. The clarification phase has been identified as the most important step in the PIPS to ensuring a successful project. This paper conducted a survey among construction professionals in Saudi Arabia, including 157 engineers, 33 consultants 9 owners, 5 vendors, 13 academics, and 28 architects, in order to develop the public procurement system in Saudi Arabia. The participants work in government sectors with an interest in the Saudi Arabian procurement system. The survey confirmed that professionals in the Saudi construction industry believe that the procurement system should be changed and that the inclusion of the clarification phase to the procurement system is a way to improve the procurement system.


2019 ◽  
Vol 110 ◽  
pp. 02090 ◽  
Author(s):  
Elena Karanina ◽  
Ksenia Kartavyh

Every year, the volumes of funding in the sphere of provision of state and municipal demand increases significantly. Achieving the effectiveness of government contracts is one of the main and “eternal” problems of public funds management. For public procurement to be effective, it is necessary to meet the needs of the relevant actors, i.e. society, the state, and the private sector. In order to make a qualitative forecast of the results of public procurement placement, the development and implementation of measures aimed at improving the public procurement system, it is necessary to assess the current situation of manifestation of risks arising from the procurement of goods, works and services for state and municipal needs. For this purpose, a risk-based model for assessing the system of state and municipal procurement has been developed, which allows disclosing the nature of the risks of the procurement cycle fully and identifying a case scenario for choosing a way to loss minimization.


2013 ◽  
Vol 13 (1) ◽  
pp. 50-65 ◽  
Author(s):  
Mastura Jaafar ◽  
Nurhidayah Mohd Radzi

Since the declaration of Malaysian independence, the public sector has significantly contributed to the country’s development. In the 1990s, a new procurement system was developed due to CIBD various changes in the construction industry. Since that period, the poor quality of public sector projects has started to attract public attention. This paper describes a study that was conducted to identify the dominant public procurement systems in place, the problems associated with these systems, and the satisfaction level of the industry players in the Malaysian construction industry. The results were drawn from 84 survey responses and interviews with industry players. The public sector is using a traditional system inherited from the British, with an intention to adopt new procurement systems. Aside from the disputes that are present in most systems, the public sector seems to encounter particular problems in relation to capabilities, time, and cost of the major procurement systems used. Traditional work culture and the industry environment influence public sector practice, which accounts for the modifications of each procurement system used. Thus, the full advantages of using an alternative procurement system may not be realised in public sector organizations. This produces an average level of satisfaction gained from the procurement system adopted. As a developing country, Malaysia needs to exert significant efforts to improve the public procurement system. 


2017 ◽  
Vol 17 (3) ◽  
pp. 281-341
Author(s):  
Emmanuel Botlhale

Public procurement accounts for a big proportion of public budget outlays, hence, it is important that there be demonstrated Value for Money (VfM) in public purchases. To ensure VfM in public procurement, Botswana introduced a modern public procurement system in early 2001. The system is yet to be subjected to VfM analysis. Using document analysis, this paper explores two main research questions: (i) what are key public procurement challenges in Botswana?; and (ii) how can public procurement in Botswana be improved? It is concluded that the public procurement system in Botswana is not constructed on a VfM basis. It is consequently suggested that there is a need for public procurement reforms and the adoption of various private sector continuous improvement tools such as Lean, Kaizen and Six Sigma.


Sign in / Sign up

Export Citation Format

Share Document