scholarly journals Fuzzy Synthetic Evaluation of the Critical Success Factors for the Sustainability of Public Private Partnership Projects in China

2021 ◽  
Vol 13 (5) ◽  
pp. 2551
Author(s):  
Binchao Deng ◽  
Dongjie Zhou ◽  
Jiachen Zhao ◽  
Yilin Yin ◽  
Xiaoyu Li

Public Private Partnership (PPP) projects have attracted wide attention from academia and industry over the past 20 years, however, they have been plagued by certain factors. This study identified, classified, and evaluated the success factors that may affect PPP projects for achieving sustainability. First, a list of 32 critical success factors were categorized into 3 groups, then a questionnaire survey was conducted, with 108 responses received from experts, researchers, and PPP project managers in China. Second, using a fuzzy synthetic evaluation (FSE) method, stakeholder relationships (A1–A10), external environmental (B1–B8), and project management of a special purpose vehicle (C1–C14) collected data at three different factor group locations in PPP projects were used in this evaluation. The results obtained nine top factors: private sector financing capacity, government credit, government commitment or guarantee, completeness of legal framework, available financial markets, the feasibility study report and implementation, effectiveness of risk management, project investment, and cost control and revenue distribution. It was demonstrated that fuzzy synthetic evaluation techniques are quite appropriate techniques for PPP projects. The research findings should impact on policy development towards PPP and Private Finance Initiative (PFI) project governance.

2017 ◽  
Vol 10 (1) ◽  
pp. 5-18
Author(s):  
Chintamani Gautam

This paper aims to identify the Critical Success Factors (CSFs) of Public Private Partnership (PPP) in hydropower secter of Nepal. The study was based on a survey of 141 experts and practitioners involved in private and public hydropower projects. The study revealed that project technical feasibility, favorable legal framework, good governance, transparent procurement process and macro-economic stability were identified as most CSFs of PPPs. The comparative analysis of rank, found that among the 21 CSFs, four factors: macro-economic condition, employment opportunities, government’s technical support and government’s managerial support were considered equally important CSFs by the public and private sector respondents. It is concluded that for the success of PPPs in hydropower sector, the concerned authorities should use private sector more efficiently, specially for the technical support and government for devising favorable legal framework for the PPP projects. This study offers some insights on CSFs for policy makers concerning the successful implementation of PPPs in hydropower sector. Key Words: Public private partnership, Hydropower sector, Critical success factors. Mr. Gautam is Lecturer at Public Youth Campus, Tribhuvan University.


2020 ◽  
Vol 12 (17) ◽  
pp. 7121
Author(s):  
Goran Amović ◽  
Rado Maksimović ◽  
Sonja Bunčić

In the initial stages of the adoption and institutionalization of Public-Private Partnerships (PPPs), national governments of transitional economies have accepted, developed, and organized Public-Private Partnerships with varying degrees of success. This study aims to investigate the critical success factors (CSFs) influencing the establishment of a sustainable Public-Private Partnership in transition conditions. In the first part of the paper, based on an extensive review of the literature, previous studies and relevant results in this field are presented as a background for this research. In the second part of this article, the survey used a factor analysis, which, with the application of the Principal Component Analysis and Varimax method with Kaiser normalization, has extracted four CSFs: (1) the establishment of a central PPP unit—knowledge center; (2) the establishment of a compatible legal/regulatory framework; (3) development of national PPP policies and strategies; and (4) standardization and transparency of the process. In the concluding remarks, the authors address the perspectives and methodological research constraints, examining possibilities to develop new knowledge and more efficient Public-Private Partnership implementation in the developing PPP markets of transitional economies.


2017 ◽  
Vol 48 (4) ◽  
pp. 93-106 ◽  
Author(s):  
Khalid Almarri ◽  
Halim Boussabaine

Governments are increasingly entering partnerships with the private sector through the public–private partnership (PPP) model for the development of public projects. Value for money analysis is used to assess the viability of these ventures. This research aims to investigate the contribution of the PPP critical success factors to value for money viability analysis. Relevant data were collected through a questionnaire to establish the PPP critical success factors and value for money success criteria. Data were collected from 92 participants. The data obtained were analyzed using mean score, t-test, and regression analysis. The research found that government guarantees, macroeconomic conditions, shared authority between the public and private sectors, social support, and transparent procurement process contributed positively to value for money viability analysis. The results imply that practitioners should consider these key indicators for improving the value for money viability of PPP projects.


2016 ◽  
Vol 6 (1) ◽  
pp. 74-91 ◽  
Author(s):  
Solomon Olusola Babatunde ◽  
Srinath Perera ◽  
Lei Zhou ◽  
Chika Udeaja

Purpose – The purpose of this paper is to identify and assess the perceptions of stakeholders on critical success factors (CSFs) for Public Private Partnership (PPP) projects in Nigeria. Design/methodology/approach – A comprehensive literature review was conducted to identify the CSFs for PPP projects, which were employed to design a questionnaire survey. In order to capture a broad perception of stakeholders, the questionnaires were administered to five different stakeholder organisations involved in different PPP projects implementation in Nigeria. Data collected were analysed using descriptive statistics, mean score, Kruskal-Wallis test, analysis of variance (ANOVA), and factor analysis. Findings – The study revealed the result of mean score ranking, which indicated that all the stakeholders considered the identified 26 CSFs important and crucial for the successful implementation of PPP projects in Nigeria. Thus, the results of Kruskal-Wallis test and ANOVA indicated that except for six (out of 26) identified CSFs, there is no statistically significant difference in the perceptions of the stakeholders on CSFs for PPP projects in Nigeria. The study, through factor analysis, grouped the 26 identified CSFs into six principal factors. Practical implications – This research would be of benefit to stakeholders in PPPs to be aware of CSFs that demand utmost consideration. Also the identified CSFs are expected to enhance the success rate of PPP projects. Originality/value – The findings would be useful for PPP stakeholders in making decisions and in implementing PPP projects towards achieving value for money. This research will also be of interest to other academic researchers intending to investigate CSFs for PPP projects in other locations.