Research of Small and Medium-Sized Enterprises Performance Evaluation System Based on ERP

2012 ◽  
Vol 452-453 ◽  
pp. 726-730
Author(s):  
Yao Wu Wei

ERP (Enterprise Resource Planning) is a kind of advanced management method and ideological system, which is an effective tool to improve operating efficiency. In reference to the domestic and foreign relevant research results, this paper attempts to find a set of evaluation index system and method, which is suitable for small and medium-sized enterprises in China implementing ERP system performance evaluation according to characteristics. Then use AHP to determine each index weight and evaluate comprehensively ERP implementation performance of small and medium-sized enterprise employing the fuzzy comprehensive evaluation method. This can provide ERP project methodological guidance and help enterprise to carry out the scientific decision, improve the success rate of ERP implementation, and promote the process of ERP in our country popularity.

2014 ◽  
Vol 1037 ◽  
pp. 532-535
Author(s):  
Li Zhen Du ◽  
De Xin Tao ◽  
Lian Qing Yu

According to the definition of integrated supply chain performance, improved method of grey relational evaluation and multi-level dynamic fuzzy comprehensive evaluation method are adopted to comprehensively evaluate the overall performance of the integrated supply chain. Based on these, the Performance Evaluation System (PES) of the integrated supply chain is developed on MATLAB software platform. In the end, the validity and feasibility of the system is validated by an example, and the system can provide a convenient operation tool and scientific, objective decision basis for managers to evaluate the integrated supply chain performance.


2014 ◽  
Vol 472 ◽  
pp. 1022-1026
Author(s):  
Jing Liu ◽  
Yu Bo Wang ◽  
Cheng Bing He ◽  
Ping Zhu

Currently, boiler efficiency evaluation system is always established on the method of heat balance based on the first law of thermodynamics as the main indicator, it is imperfect. Using Exergy method, which is based on the first and the second law of thermodynamics, not only focus on energy consumption, but also take the useful energy utilization levels into account, combined with evaluation of environmental indicators, the evaluation index system is established for energy-efficient of boilers. Then, in view of the structural characteristics of the index system, using fuzzy comprehensive evaluation method evaluates the energy efficiency of boilers. Finally, by using this evaluation method, energy efficiency was studied.


2013 ◽  
Vol 339 ◽  
pp. 766-771 ◽  
Author(s):  
Li Zhen Du ◽  
Cheng Ran Wang ◽  
De Xin Tao

The Performance Evaluation Index System of automotive Supply Chain is established in this paper. Considering the time-varying characteristics of the evaluation object, combining Analytic Hierarchy Process (AHP) with fuzzy comprehensive evaluation, multi-level dynamic fuzzy evaluation model is adopted to comprehensively evaluate the overall performance of the automotive supply chain. Based on this, the Performance Evaluation System (PES) of automotive integrated supply chain is developed on MATLAB software platform. In the end, the validity and feasibility of the system is validated by an example.


2021 ◽  
Vol 2021 ◽  
pp. 1-12
Author(s):  
Wei Zhang ◽  
Chaodan Yang ◽  
Ying Cheng ◽  
Haiying Chen ◽  
Wei Wang

This paper adopts the analysis method of big data to conduct an in-depth analysis and research on the sustainable development mechanism of enterprises, firstly, combing the content and methods of enterprise business performance evaluation, defining enterprise sustainable development, and exploring the integration of enterprise sustainable development and enterprise business performance evaluation by specifically analyzing from different perspectives. Then, we analyze the industry in which the enterprise is located, its business situation, and strategy, and after analyzing the current business performance evaluation system of the enterprise, we point out its problems. The current performance evaluation system is incomplete, focuses only on economic benefits, is not long term, and does not consider the company’s strategy and stakeholders’ needs, which affects its importance and feasibility. Then, the above analysis is integrated to build a performance evaluation system consisting of four dimensions, namely, economic dimension, scientific research and innovation dimension, social dimension, and ecological dimension, from the perspective of sustainable development, and a total of 29 indicators are selected. Then, the two research tools of first value method and fuzzy comprehensive evaluation method were combined, based on the panel data of enterprises from 2016 to 2020; the first value method was used to get the weights of each indicator in the business performance evaluation system. The fuzzy comprehensive evaluation method was used to get a comprehensive evaluation score of enterprise’s business performance in 2019, and then the evaluation results were analyzed in detail and suggestions were made, which confirms that enterprises are based on the sustainable development perspective. The evaluation of business performance is necessary and important. Finally, we propose supporting safeguards, such as establishing a performance evaluation team and a monitoring mechanism, dynamically improving the enterprise performance evaluation system, establishing a sustainable corporate culture, preparing and publishing a sustainable development report, and accelerating the information construction of performance evaluation.


2013 ◽  
Vol 438-439 ◽  
pp. 1952-1957
Author(s):  
Jie Li ◽  
Shao Wei Yang

In this paper, the preliminary study of fuzzy comprehensive evaluation for arterial highway is made, the multi-level evaluation index system is set up, the process and formula of fuzzy comprehensive evaluation are proposed, and the practical application is explained by examples. To evaluate the highway engineering feasibility study, some methods are applied such as fuzzy comprehensive evaluation, analytic hierarchy process, expert evaluation method, etc. Thus it provides objective evaluation for the related management department to achieve the goal of improve the quality of highway preliminary work.


2020 ◽  
Vol 143 ◽  
pp. 01034
Author(s):  
Miao Yang ◽  
Yang Zhao ◽  
Tiezheng Zhao

With the advancement of China's urbanization process, China's villages and small towns also begin to face a series of challenges such as ecological environment destruction, population outflow and aging. In order to better deal with these challenges, Zhejiang province issued the “Interim Measures for the Assessment and Acceptance of Environmental Comprehensive Improvement Actions in Small Towns in Zhejiang Province”. The document provides detailed environmental assessments of villages and small towns, but lacks economic and social assessments. This study introduced the performance evaluation system of landscape, it focuses on the sustainable development of the thought and the advantage of quantitative evaluation system, combined with“Interim Measures for the Assessment and Acceptance of Environmental Comprehensive Improvement Actions in Small Towns in Zhejiang Province”, to build a strong comprehensive evaluation index system. Then, the analytic hierarchy process (AHP) and fuzzy comprehensive evaluation method (FCE) are used to draw the conclusion. In this way, the direction of key construction in the next step of rural and small town development can be clarified to achieve better development of this region.


2013 ◽  
Vol 357-360 ◽  
pp. 2839-2844
Author(s):  
Li Ming Xia ◽  
Jun Jun Zheng

With the introduction of knowledge management into project management, this paper proposes a set of evaluation system for project performance based on knowledge management. The scope of evaluation is defined by the analysis of the relationship between knowledge management and the project, and under the guidance of establishing principle, establish the mapping relationship of knowledge management from the idea of balanced score card. Then determine the specific evaluation index combining with the whole implementation process of the project. Finally, use the analytic hierarchy process (AHP) and fuzzy comprehensive evaluation method (FCE) to establish a quantitative evaluation index system, which plays a role to guide the practice of the project.


2011 ◽  
Vol 120 ◽  
pp. 292-295
Author(s):  
Li Sun ◽  
Ai Qiao Sun ◽  
Zi Qin Ma ◽  
Xiu Lun Wang ◽  
Jian Min Fan ◽  
...  

Based on the research of process management level evaluation , it proposed evaluation index system of process management level, established function module of evaluation system, adopted fuzzy comprehensive evaluation method to evaluate enterprise process management level.


2021 ◽  
Vol 336 ◽  
pp. 07017
Author(s):  
Xu Cheng ◽  
Yanyan Huang ◽  
Peiting Wu

In 2020, the outbreak of COVID-19 seriously threatened many people's life and it had brought unexpected impacts upon the global economy. In order to understand the emergency response ability of cities with similar backgrounds, an evaluation method based on fuzzy comprehensive evaluation was proposed. First, we established the evaluation index system of urban epidemic response capability. Meantime, a combination way to calculate the index weights of the evaluation system was developed based on analytic hierarchy process. Finally, we have an empirical analysis on the evaluation activity of epidemic emergency management in area H, J province. The evaluation results can be used as the basis for selecting advanced cities. At the same time, it is of great importance for area H to improve urban resource allocation and emergency response capability.


2014 ◽  
Vol 989-994 ◽  
pp. 2336-2339
Author(s):  
Song Ling ◽  
Chuan Yu Ye

This paper analyzed the mechanism of the Enterprise business process reengineering (BPR) to study the performance of the development process, Determined the importance of process cost, process, quality, customer satisfaction to process performance, and on this basis, further established the effect factors layer of process reengineering evaluation index system and build the enterprise develop business process reengineering effect evaluation system. Finally, this article determine the weight of each evaluation index based on the attribute hierarchical model and empirical analyses by using fuzzy comprehensive evaluation method.


Sign in / Sign up

Export Citation Format

Share Document