The Identification Methods of Partial Discharge Test for Equipment

2014 ◽  
Vol 986-987 ◽  
pp. 1685-1688
Author(s):  
Qing Hao Wang ◽  
Bin Lin ◽  
Xin Yu Li ◽  
Jian Feng Li ◽  
Qi Wang ◽  
...  

When the power transformer in partial discharge test, if the test equipment (voltage regulator, intermediate transformer, etc.) ontology partial discharge is big, it will severely affect the quality of testing, and even cause false identify.How to correctly identify partial discharge from the power transformer or from the test equipment itself, it is very important for the test personnel. This paper introduces to use the idle 220kV circuit breaker in parallel capacitor to cleverly find out in the whole process of partial discharge from the test equipment itself.

2018 ◽  
Vol 218 ◽  
pp. 04008
Author(s):  
Siswanto ◽  
Agus Indarto ◽  
Radin Rahmatullah ◽  
Chairul Hudaya

Power transformer (PT), essential equipment in electrical power system proceeds complicated manufacturing process to meet high standard design. During manufacturing process of PT, the drying stage is of importance to remove excessive moisture contaminant on the solid insulation. This study investigated the effects of drying duration on partial discharge test of 83.3 MVA 275/160 kV PT. The partial discharge test measurements were carried out using IEC 60270 standards comprising of the capacitive network model based on the main quantity apparent charge concept. We found that the lowest partial discharge of 21 pC was achieved at 68 hours drying duration, while the highest value of 60 pC was reached at 81 hours drying time. The longer drying time may lead to initial degradation of cellulose insulation due to excessive heating. The amount of water extracted during drying effect to partial discharge also investigated. We conclude that the drying time at a higher and lower than 68 hours significantly contributes to the increased partial discharge values of PT.


2019 ◽  
Vol 2 (5) ◽  
Author(s):  
Tong Wang

The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefore, real-time, comprehensive, rapid and accurate prediction of construction compaction quality through informatization detection method is an important guarantee for speeding up construction progress and ensuring subgrade compaction quality. Based on the function of the system, this paper puts forward the principle of system development and the development mode used in system development, and displays the development system in real-time to achieve the whole process control of subgrade construction quality.


Sensors ◽  
2021 ◽  
Vol 21 (6) ◽  
pp. 2223 ◽  
Author(s):  
Sayed A. Ward ◽  
Adel El-Faraskoury ◽  
Mohamed Badawi ◽  
Shimaa A. Ibrahim ◽  
Karar Mahmoud ◽  
...  

Power transformers are considered important and expensive items in electrical power networks. In this regard, the early discovery of potential faults in transformers considering datasets collected from diverse sensors can guarantee the continuous operation of electrical systems. Indeed, the discontinuity of these transformers is expensive and can lead to excessive economic losses for the power utilities. Dissolved gas analysis (DGA), as well as partial discharge (PD) tests considering different intelligent sensors for the measurement process, are used as diagnostic techniques for detecting the oil insulation level. This paper includes two parts; the first part is about the integration among the diagnosis results of recognized dissolved gas analysis techniques, in this part, the proposed techniques are classified into four techniques. The integration between the different DGA techniques not only improves the oil fault condition monitoring but also overcomes the individual weakness, and this positive feature is proved by using 532 samples from the Egyptian Electricity Transmission Company (EETC). The second part overview the experimental setup for (66/11.86 kV–40 MVA) power transformer which exists in the Egyptian Electricity Transmission Company (EETC), the first section in this part analyzes the dissolved gases concentricity for many samples, and the second section illustrates the measurement of PD particularly in this case study. The results demonstrate that precise interpretation of oil transformers can be provided to system operators, thanks to the combination of the most appropriate techniques.


Proceedings ◽  
2018 ◽  
Vol 2 (23) ◽  
pp. 1455 ◽  
Author(s):  
Dina Czajczyńska ◽  
Renata Krzyżyńska ◽  
Hussam Jouhara

In 2016 4.94 million tonnes of tyres were produced. Each tyre eventually become waste and pyrolysis has been considered an effective way of utilizing scrap tyres for several decades. However, pyrolysis has failed many times because the process has a great energy demand and the quality of products is unstable or insufficient for commercial use. Usually plants are focused on the production of pyrolytic oil or char and the gaseous phase is only a by-product. In this paper the importance of composition and quality of pyrolytic gas is emphasized. The main chemical properties make this gas a valuable biofuel that may satisfy energy requirements of the whole process (except for the start-up phase). Available data from literature concerning composition and other features of the pyrolytic gas from scrap tyres obtained at temperatures up to 1000 °C are compared with experimental results. The quality of evolved gases is discussed in the context of the Industrial Emissions Directive (IED), too. Finally, an analysis of the mass balances obtained allows a decision about the business profile and profitability.


2013 ◽  
Vol 318 ◽  
pp. 572-575
Author(s):  
Li Li Yu ◽  
Yu Hong Li ◽  
Ai Feng Wang

In this paper a quality monitoring system for seismic while drilling (SWD) that integrates the whole process of data acquisition was developed. The acquisition equipment, network status and signals of accelerometer and geophone were monitored real-time. With fast signal analysis and quality evaluation, the acquisition parameters and drilling engineering parameters can be adjusted timely. The application of the system can improve the quality of data acquisition and provide subsequent processing and interpretation with high qualified reliable data.


Sign in / Sign up

Export Citation Format

Share Document