The Analysis of a Production Flow with the Help of Value Stream Mapping

2019 ◽  
Vol 957 ◽  
pp. 203-210
Author(s):  
Ana Gavriluță

The main aim of Lean Manufacturing concept is to produce more with less: space, stock, workforce and time. The companies that along the years implemented Lean Manufacturing, reached a spectacular development, mainly because with the same workforce and financial resources, succeeded to increase significantly their profit (some reached up to 300-400% increase). The strength of Lean concept is the calculation of value of product for the final client, considering each stage of manufacturing. Therefore, the main aim of this paper is to analyze and improve the manufacturing flow of a component, from the system entry point to its exit using Flow Mapping and Value Stream Mapping. After all the actions on improving the flow, the activities without added value decreased with 15.92% and the lead time with 15.61%

2021 ◽  
Vol 6 (1) ◽  
pp. 036-050
Author(s):  
Muhammad Adib Uz Zaman ◽  
Emad Rabiei Hosseinabad

The importance of lean manufacturing concepts has been discussed many times over the few decades. The most important elements in lean manufacturing practices are value stream mapping (VSM), Kaizen events, load leveling (heijunka), etc. In this case study, a real-world clock assembly simulation has been used to study the performance improvement in terms of production flow and lead time after introducing lean concepts. In each round of simulation, the lean concepts have been introduced one by one and performance metrics were recorded. After implementing the concepts, the productivity was improved enormously. So, this simulation study emphasizes the importance of continuous improvement of production flow through lean concepts in a real production setting.


2021 ◽  
pp. 1451
Author(s):  
Ahmad Ahmad ◽  
Helena JK ◽  
Andrean Yonathan

PT. IE is engaged in the business of making Lighting and Lampposts. Based on observations and interviews, there are still some wastes that arise in the flow of the production process, among which there are still many wastes of waiting time, transportation, movement and inventory. These wastes cause the product completion time to be longer and the resulting quality decreases. To eliminate or reduce waste, it is necessary to apply Lean Manufacturing. Lean Manufacturing is a systematic approach to eliminating waste and changing processes by identifying and reducing waste with continuous improvement and striving to create a production flow along the value stream by eliminating all forms of waste and increasing the added value of products to customers. From the Pareto diagram, it is found that transportation waste has the highest percentage of 26.21%, waiting time is 21.38%, motion waste is 19.31% and waste inventories are 15.17%. while the results of the Value Stream Mapping Current State Map mapping obtained a production lead time of 7,680 seconds and a total cycle time of 6,660 seconds and a PCE Current State Map value of 53.09%. Identify the root causes of waste using Fishbone diagrams, 5 Why Analysis, 5W+1H, Fault Tree Analysis and FMEA. After corrective actions have been taken, based on the Value Stream Mapping Future mapping there is a decrease in production lead time to 5,220 seconds and a decrease in total cycle time to 4,860 seconds and an increase in PCE Future State Map to 68.10% so that there is an increase of 15.01% which shows The company's production process has become more Lean.PT. IE bergerak dalam bisnis pembuatan Lighting dan Tiang Lampu. Berdasarkan observasi dan wawancara, masih terdapat beberapa pemborosan (waste) yang timbul di aliran proses produksi di antaranya masih banyak terjadi pemborosan-pemborosan waktu tunggu, transportasi, gerakan dan inventori. Pemborosan-pemborosan tersebut menyebabkan waktu penyelesaian produk menjadi lebih lama dan kualitas yang dihasilkan menurun. Untuk menghilangkan atau mengurangi pemborosan diperlukan adanya penerapan Lean Manufacturing.Lean Manufacturing merupakan pendekatan sistematik untuk mengeliminasi pemborosan dan mengubah proses dengan cara mengidentifikasi dan mengurangi pemborosan dengan perbaikan kontinu dan berupaya untuk menciptakan aliran produksi sepanjang value stream dengan menghilangkan segala bentuk pemborosan serta meningkatkan nilai tambah produk kepada pelanggan. Dari diagram Pareto ditemukan waste transportasi memiliki persentase paling tinggi sebesar 26,21%, waktu tunggu  21,38%, waste motion 19,31% dan waste inventories 15,17%. sedangkan hasil pemetaan Value Stream Mapping Current State Map diperoleh production lead time selama 7.680 detik dan total cycle time selama 6.660 detik serta nilai PCE Current State Map sebesar 53,09%. Identifikasi akar permasalahan pemborosan menggunakan diagram Fishbone, 5 Why Analysis, 5W+1H, Fault Tree Analysis dan FMEA. Setelah dilakukan tindakan–tindakan perbaikan, berdasarkan pemetaan Value Stream Mapping Future ada penurunan production lead time menjadi 5.220 detik dan penurunan total cycle time menjadi 4.860 detik serta ada peningkatan PCE Future State Map menjadi 68,10% sehingga ada peningkatan 15,01% yang menunjukan proses produksi perusahaan telah menjadi lebih Lean.


Author(s):  
Daniel Derrell Forest ◽  
G.H. Massiha

<span>The purpose of this project is to evaluate and optimize an assembly process for ergonomic and productivity considerations. Companies use lean manufacturing as a method for continuous improvement in order to increase throughput and for to reallocate resources for more important tasks. For this project, value stream mapping (VSM) was used to evaluate, analyze, and improve the ergonomic factors of an assembly process and to increasing throughput. With the use of VSM, researchers are able to see the areas of added value, non-added value, and bottlenecks. This project illustrates the implementation of VSM for the minimization of waste, by using the design method to restructure the process of assembly. The results show drastic improvement in assembly time and ergonomic workplace design, while providing a platform for a continuous improvement system.</span>


2018 ◽  
Vol 4 (1) ◽  
pp. 23 ◽  
Author(s):  
Agung Ravizar ◽  
Rosihin Rosihin

This study aims to reduce the waste that occurs on each workstation and has an impact on increasing productivity and reducing production costs caused by waste that occurs during production. The data used for this study is quantitative data obtained by direct observation to the relevant departments regarding the problem of identifying waste that occurs — data taken from observations as much as 30 times the collection of data and historical data used from January 2016 to June 2017. By using the value stream mapping method on lean manufacturing, it can be seen that there are five types of waste from the existing seven waste. The five wastes are unnecessary motion, waiting, reject, transportation and in-process processes. From the results of the value stream mapping carried out a reduction in waste on each workstation with a total reduction of waste that occurs at 66.97 tons / year or 18.6% on waste gel and 88.8 tons / year or 19.3% at waste powder and there was a reduction in the changeover process for 45 minutes or 12.16% of the total changeover time before the improvement. Also, there was also an increase in the production process speed of 2 minutes 47 seconds or 4.52% from the lead time of the previous production process, 61 minutes 34 seconds to 58 minutes 47 seconds.


2017 ◽  
Vol 3 (2) ◽  
Author(s):  
Dion Avellino Suyanto ◽  
Sunday Noya

Fierce competition encourages companies to make continuous improvements to achieve better working efficiency. One method to improve the working efficiency is using the concept of lean manufacturing. The efficiency of the existing work in PT. Rimba Kencana is still not good because there are many processes that are not uniform and because of that, production lead time is increased. By using value stream mapping and value stream analysis tools (VALSAT), the production processes in the company are mapped into the current state mapping and future state mapping. In the current state mapping, the total value of production lead time is 59.49 days and the value of process cycle efficiency (PCE) is 0.013%. After doing improvement on welding department, the total value of production lead time decreased to 48.22 days and the value of process cycle efficiency becomes 0.016%. Keywords: Efficiency, Value Stream Mapping, Value Stream Analysis Tools


2019 ◽  
Vol 5 (1) ◽  
pp. 1-7
Author(s):  
Catur Kusbiantoro ◽  
Ellysa Nursanti

CV. Tanara Textile merupakan salah satu perusahaan tekstil yang termasuk dalam kelompok industri penyempurnaan kain berupa kain kaos. Pada proses produksi di perusahaan masih ditemukan beberapa waste. Penelitian ini bertujuan untuk mengidentifikasi dan menurunkan waste yang terjadi pada proses produksi maka digunakan pendekatan lean manufacturing. Metode Value Stream Mapping (VSM) digunakan untuk pemetaan aliran produksi dan aliran informasi terhadap suatu produk pada tingkat produksi total, melakukan wawancara untuk pembobotan penyebab 7 waste yang sering terjadi pada proses produksi, VALSAT untuk menganalisa pemborosan dari hasil pembobotan yang selanjutnya melakukan detailed mapping tools, serta analisis FMEA untuk mengetahui penyebab kegagalan prosesyang terjadi di lini produksi lalu menghitung nilai RPN tertinggi. Selanjutnya melakukan usulan perbaikan untuk menurunkan waste unnecessary inventory serta menganalisis perbaikan secara berkelanjutan dengan PDCA. Waste terbesar ada pada Unncessary Inventory sebesar 28,571% faktor penyebabnya adalah penumpukan bahan baku, work in process (WIP), sparepart yang tidak terpakai dan penimbunan pada finished goods Sebelum perbaikan proses produksi 16 hari 9 jam dimana Value Added 6 hari 4 jam dan Lead Time 10 hari 4 jam, setelah perbaikan proses produksi menjadi 14 hari 5 jam dimana Value Added 6 hari 4 jam dan Lead Time 8 hari 1 jam, dengan demikian dapat meningkatkan process cycle efficiency sebesar 17,19% dan menghemat lead time sebesar 2,546% dengan penurunan waste sebesar 8,31%


2011 ◽  
Vol 110-116 ◽  
pp. 2062-2066 ◽  
Author(s):  
Paramdeep Singh ◽  
Harpuneet Singh

Lean manufacturing has been proved to be an effective management philosophy for improving businesses in a competitive market by eliminating non-value added waste and improving in process operations. Value stream mapping is an important tool used to identify the opportunities for various lean techniques. The present research mainly focuses on the description of a model that is developed to contrast the “before” and “after” scenarios in detail in order to obtain the various benefits such as reduced production lead time, lower work in process inventory [1] and proper utilisation of the workforce. The current manufacturing system has been compared with the proposed pull (Kanban) system which shows the benefits of the proposed lean manufacturing system over the existing traditional manufacturing system. The present research work has been carried out at typical tractor industry which shows 50.5% reduction in total lead time in the future state value mapping of the crank case and the number of operators involved in processing of crank case has also been reduced from 22 to 18.


2018 ◽  
Vol 220 ◽  
pp. 02005
Author(s):  
Abdillah Arif Nasution ◽  
Ikhsan Siregar ◽  
Anizar ◽  
Tigor Hamonangan Nasution ◽  
Khalida Syahputri ◽  
...  

This research was conducted in manufacturing industry, so this research is based on case study application. This research serves to reduce waste in the industry when making a product. This study categorizes value-added work and which work has no added value. And it is measurable and has value, so it can be evaluated in the future. Later this will be poured or depicted on a map called Value stream mapping. This is a tool from Lean Manufacturing. Lean manufacturing is useful for analysing and reducing non value-added activities, value stream mapping analysis tools, 5L1H process mapping activities, and 5 why tools. From the results of this study obtained the efficiency of the process cycle and total estimation of the improvement of the lead time. This calculation can be an evaluation material for the company.


Sign in / Sign up

Export Citation Format

Share Document