scholarly journals Penerapan Lean Manufacturing untuk Mengurangi Waste pada Produksi Absorbent

2018 ◽  
Vol 4 (1) ◽  
pp. 23 ◽  
Author(s):  
Agung Ravizar ◽  
Rosihin Rosihin

This study aims to reduce the waste that occurs on each workstation and has an impact on increasing productivity and reducing production costs caused by waste that occurs during production. The data used for this study is quantitative data obtained by direct observation to the relevant departments regarding the problem of identifying waste that occurs — data taken from observations as much as 30 times the collection of data and historical data used from January 2016 to June 2017. By using the value stream mapping method on lean manufacturing, it can be seen that there are five types of waste from the existing seven waste. The five wastes are unnecessary motion, waiting, reject, transportation and in-process processes. From the results of the value stream mapping carried out a reduction in waste on each workstation with a total reduction of waste that occurs at 66.97 tons / year or 18.6% on waste gel and 88.8 tons / year or 19.3% at waste powder and there was a reduction in the changeover process for 45 minutes or 12.16% of the total changeover time before the improvement. Also, there was also an increase in the production process speed of 2 minutes 47 seconds or 4.52% from the lead time of the previous production process, 61 minutes 34 seconds to 58 minutes 47 seconds.

2017 ◽  
Vol 17 (3) ◽  
pp. 143-148
Author(s):  
R. Władysiak ◽  
T. Pacyniak ◽  
J. Trzoska

AbstractThe paper presents the technology and organization of the artistic cast production. On the basis of the actual cast production system, the manufacturing process was shown, in particular sand–piece moulding, which is a very important process and a time-consuming part of the entire manufacture of the casts. The current state of the production process as well as the organization of the work and production technology were analysed with the use of methods and techniques of production improvement, the Lean Manufacturing concept and computer systems. The results of the analysis and studies were shown with use of schemes and graphs of the layout of the production resources, a flow chart of the production process, value stream mapping, and a costs table for the production and modernization of the moulding stage. The work has shown that there are possibilities to improve the artistic cast production system. This improvement leads to increased productivity, lower production costs of artistic casts and increased competitiveness of the foundry.


2017 ◽  
Vol 4 (1) ◽  
pp. 47 ◽  
Author(s):  
Muhammad Shodiq Abdul Khannan ◽  
Haryono Haryono

Productivity achievement at PT Adi Satria Abadi (Golf Gloves Division) is not optimal because of<br />the waste. Value Stream Mapping as a Lean Manufacturing tool is used to map the production process<br />and identify and eliminate the waste. The advantage of VSM is its capability to give visual map of value<br />added flow process, necessary but non value added flow process, and non value added flow process. In this<br />study Waste Assessment Model (WAM) also have been implemented to identify the waste. The sequence of<br />three greatest waste are Defect/Reject 24,73%, Unneccessary Inventory 18,80%, and Unneccessary Motion<br />15,44%. This study can reduce production lead time 62,22 minutes and improve the production throughput<br />by 77 pcs.


2021 ◽  
pp. 1451
Author(s):  
Ahmad Ahmad ◽  
Helena JK ◽  
Andrean Yonathan

PT. IE is engaged in the business of making Lighting and Lampposts. Based on observations and interviews, there are still some wastes that arise in the flow of the production process, among which there are still many wastes of waiting time, transportation, movement and inventory. These wastes cause the product completion time to be longer and the resulting quality decreases. To eliminate or reduce waste, it is necessary to apply Lean Manufacturing. Lean Manufacturing is a systematic approach to eliminating waste and changing processes by identifying and reducing waste with continuous improvement and striving to create a production flow along the value stream by eliminating all forms of waste and increasing the added value of products to customers. From the Pareto diagram, it is found that transportation waste has the highest percentage of 26.21%, waiting time is 21.38%, motion waste is 19.31% and waste inventories are 15.17%. while the results of the Value Stream Mapping Current State Map mapping obtained a production lead time of 7,680 seconds and a total cycle time of 6,660 seconds and a PCE Current State Map value of 53.09%. Identify the root causes of waste using Fishbone diagrams, 5 Why Analysis, 5W+1H, Fault Tree Analysis and FMEA. After corrective actions have been taken, based on the Value Stream Mapping Future mapping there is a decrease in production lead time to 5,220 seconds and a decrease in total cycle time to 4,860 seconds and an increase in PCE Future State Map to 68.10% so that there is an increase of 15.01% which shows The company's production process has become more Lean.PT. IE bergerak dalam bisnis pembuatan Lighting dan Tiang Lampu. Berdasarkan observasi dan wawancara, masih terdapat beberapa pemborosan (waste) yang timbul di aliran proses produksi di antaranya masih banyak terjadi pemborosan-pemborosan waktu tunggu, transportasi, gerakan dan inventori. Pemborosan-pemborosan tersebut menyebabkan waktu penyelesaian produk menjadi lebih lama dan kualitas yang dihasilkan menurun. Untuk menghilangkan atau mengurangi pemborosan diperlukan adanya penerapan Lean Manufacturing.Lean Manufacturing merupakan pendekatan sistematik untuk mengeliminasi pemborosan dan mengubah proses dengan cara mengidentifikasi dan mengurangi pemborosan dengan perbaikan kontinu dan berupaya untuk menciptakan aliran produksi sepanjang value stream dengan menghilangkan segala bentuk pemborosan serta meningkatkan nilai tambah produk kepada pelanggan. Dari diagram Pareto ditemukan waste transportasi memiliki persentase paling tinggi sebesar 26,21%, waktu tunggu  21,38%, waste motion 19,31% dan waste inventories 15,17%. sedangkan hasil pemetaan Value Stream Mapping Current State Map diperoleh production lead time selama 7.680 detik dan total cycle time selama 6.660 detik serta nilai PCE Current State Map sebesar 53,09%. Identifikasi akar permasalahan pemborosan menggunakan diagram Fishbone, 5 Why Analysis, 5W+1H, Fault Tree Analysis dan FMEA. Setelah dilakukan tindakan–tindakan perbaikan, berdasarkan pemetaan Value Stream Mapping Future ada penurunan production lead time menjadi 5.220 detik dan penurunan total cycle time menjadi 4.860 detik serta ada peningkatan PCE Future State Map menjadi 68,10% sehingga ada peningkatan 15,01% yang menunjukan proses produksi perusahaan telah menjadi lebih Lean.


2014 ◽  
Vol 915-916 ◽  
pp. 1405-1411
Author(s):  
A.N.A. Ahmad ◽  
Sulaiman Hj. Hasan ◽  
H. Norafifah

Value stream mapping (VSM) was initially developed to use of the suite of tools to help researcher or practitioner to identify waste in individual value streams and find an appropriate method to its removal. The process itself is simple and straightforward is used to identify waste using lean manufacturing technique, determined causes of the waste through the value stream mapping method and to propose solution to improve workplace environment. In this project is made an attempt to computerize the process though the application of VSM. Computerize value stream system is basically a method which is an internet networking system combining traditional concept of value stream mapping method to be used at manufacturing company to reduce wastes. This paper summarizes the way to develop an internet, online and network based of an efficient computerize value stream system to improve operation value of the manufacturing company. This paper reviews the design of package that will replace the manual method of doing VSM. This package will be applied in a real shop floor environment.


Author(s):  
Nugraha Nugraha

Inability to fulfill the demand of consumers is becoming the major issues on citronella oil refinery in the village of Cimungkal Sumedang. This study was conducted to formulate alternative measures in order to increase the production of citronella oil distillates in the Cimungkal village. Mapping of the production process is done with Value Stream Mapping (VSM) as a first step to determine the processing time (lead time of production) and identify the waste that occurs, analyze the causes of the problems at the manufacturing level, and formulate remedial measures to increase the production of oil of citronella. The results show some activity in the production process of citronella oil which is a waste and should be minimized. By mapping, it can be seen that the lead time citronella oil refining initial amounted to 647 minutes or 10.78 hours. After repairs (Future State) improvements Total lead time to 274 minutes. Value-added activity increased by 38.93%, non-value added decreased by 3.63%, and necessary but non-value added fell by 35.3%. The study also resulted in the formulation of strategies that can be done to increase the production of oil of citronella. 


2017 ◽  
Vol 3 (2) ◽  
Author(s):  
Dion Avellino Suyanto ◽  
Sunday Noya

Fierce competition encourages companies to make continuous improvements to achieve better working efficiency. One method to improve the working efficiency is using the concept of lean manufacturing. The efficiency of the existing work in PT. Rimba Kencana is still not good because there are many processes that are not uniform and because of that, production lead time is increased. By using value stream mapping and value stream analysis tools (VALSAT), the production processes in the company are mapped into the current state mapping and future state mapping. In the current state mapping, the total value of production lead time is 59.49 days and the value of process cycle efficiency (PCE) is 0.013%. After doing improvement on welding department, the total value of production lead time decreased to 48.22 days and the value of process cycle efficiency becomes 0.016%. Keywords: Efficiency, Value Stream Mapping, Value Stream Analysis Tools


Author(s):  
Agustian Suseno ◽  
Hengky Hengky

PT. Trijaya Teknik Karawang is a manufacturing company that produces spare parts, namely the piece pivot. The increased demand make the company parties need to analyze the ability to do the production to make it more effective and efficient in order to win the competition. Preliminary observations on the production floor they still present problems that are categorized as waste. Based on it, lean manufacturing Approach used to solve these problems. First of all the waste identified by mapping the flow of production using Value Stream Mapping (VSM). Then determined the dominant waste going through weighting waste using Waste Assesment Model (WAM) with the result that the inventory is the dominant waste. Next choose a detail mapping tools with Value Stream Analyze Tools (VALSAT) and determine the cause of waste inventory with fishbone diagrams that result, the causes of waste inventory is the breakdown of the machine, the operator of conduct material handling and less nimble, the distance between the machine and the system far, the production batch manufacture. Recommendations for improvements are the application of the system production of one-piece flow with investing buying transfer dies and adds to the human resources division maintenance. The identification of the problem causing factors of the dominant waste activity, namely waste inventory using Fishbone diagrams is lack of engine maintenance because it does not have a maintenance division and the production system used is batch manufacture that produces goods in lot size so that there are WIP parts in each production process.


2019 ◽  
Vol 5 (1) ◽  
pp. 1-7
Author(s):  
Catur Kusbiantoro ◽  
Ellysa Nursanti

CV. Tanara Textile merupakan salah satu perusahaan tekstil yang termasuk dalam kelompok industri penyempurnaan kain berupa kain kaos. Pada proses produksi di perusahaan masih ditemukan beberapa waste. Penelitian ini bertujuan untuk mengidentifikasi dan menurunkan waste yang terjadi pada proses produksi maka digunakan pendekatan lean manufacturing. Metode Value Stream Mapping (VSM) digunakan untuk pemetaan aliran produksi dan aliran informasi terhadap suatu produk pada tingkat produksi total, melakukan wawancara untuk pembobotan penyebab 7 waste yang sering terjadi pada proses produksi, VALSAT untuk menganalisa pemborosan dari hasil pembobotan yang selanjutnya melakukan detailed mapping tools, serta analisis FMEA untuk mengetahui penyebab kegagalan prosesyang terjadi di lini produksi lalu menghitung nilai RPN tertinggi. Selanjutnya melakukan usulan perbaikan untuk menurunkan waste unnecessary inventory serta menganalisis perbaikan secara berkelanjutan dengan PDCA. Waste terbesar ada pada Unncessary Inventory sebesar 28,571% faktor penyebabnya adalah penumpukan bahan baku, work in process (WIP), sparepart yang tidak terpakai dan penimbunan pada finished goods Sebelum perbaikan proses produksi 16 hari 9 jam dimana Value Added 6 hari 4 jam dan Lead Time 10 hari 4 jam, setelah perbaikan proses produksi menjadi 14 hari 5 jam dimana Value Added 6 hari 4 jam dan Lead Time 8 hari 1 jam, dengan demikian dapat meningkatkan process cycle efficiency sebesar 17,19% dan menghemat lead time sebesar 2,546% dengan penurunan waste sebesar 8,31%


2011 ◽  
Vol 110-116 ◽  
pp. 2062-2066 ◽  
Author(s):  
Paramdeep Singh ◽  
Harpuneet Singh

Lean manufacturing has been proved to be an effective management philosophy for improving businesses in a competitive market by eliminating non-value added waste and improving in process operations. Value stream mapping is an important tool used to identify the opportunities for various lean techniques. The present research mainly focuses on the description of a model that is developed to contrast the “before” and “after” scenarios in detail in order to obtain the various benefits such as reduced production lead time, lower work in process inventory [1] and proper utilisation of the workforce. The current manufacturing system has been compared with the proposed pull (Kanban) system which shows the benefits of the proposed lean manufacturing system over the existing traditional manufacturing system. The present research work has been carried out at typical tractor industry which shows 50.5% reduction in total lead time in the future state value mapping of the crank case and the number of operators involved in processing of crank case has also been reduced from 22 to 18.


Sign in / Sign up

Export Citation Format

Share Document