Corda (a proposed coal research and development agency)

1978 ◽  
Author(s):  
J C Botham
2021 ◽  
Vol 3 (2) ◽  
pp. 135-143
Author(s):  
Tomi Satria Maggara ◽  
Aldri Frinaldi

This study describes the impact of work culture in implementing the e-planning application to realize good governanc e studies in the Planning ,Research and Development Agency of 50 Kota. There search method used is descriptive qualitative, because the problems are complex so that it requires interviews and observations to get valid data. The selection of informants was carried out by using purposive sampling technique. Based on the results of the research that has been done, it can be concluded that the impact of work culture in implementing E-Planning applications to achieve Good Governance at Bapelitbang Kabupaten 50 Kota it has had a good impact but there are still some problems that the authors haveen countered, among others: there are still delays in the preparation and inp t of planning documents, there are no awards given to employees, accommodation of RPJPD programs in application E-Planning and there are still employees who don't understand how to use the E-Planning application.


Author(s):  
Oľga Holá

Abstract The lecture-experimental tours at secondary schools of Slovakia have been realized within the scope of the APVV (The Slovak Research and Development Agency) project solving: “Physics and Chemistry in our Life Today and Tomorrow”. These lectures consist of lectures supported by power-point presentations, illustrative demos of lectured problems, as well as simple experiments. In the lecture part various information and communication means are used - e.g. the Internet connection, various CDs, DVDs and our own video film library. In our paper we inform of these courses and of their objectives and responses.


2020 ◽  
Vol 9 (2) ◽  
pp. 501
Author(s):  
Novi Arteti ◽  
Syafwandi . ◽  
Budi Susetyo

The application of new technology as a result of research and development carried out by the Research and Development Agency of the Ministry of Public Works and Public Housing is one of the efforts for technological needs in infrastructure development. The implementation of technology implementation activities still faces many obstacles, one of which is the tender process. Project Characteristics Factors, Capability of Contractors and Application of New Technology can influence whether the contractor will continue or stop the tender process. This research is based on a sample of respondents from related parties including goods / service providers (contractors), work owners and groups of goods / services procurement units. The results of the data obtained were analyzed with the partial least-squares structural equation model (PLS-SEM). The analysis shows that the ability of the Contractor has the greatest influence on the Tender Process. This means that the contractor's resources are the main force to carry out the project so that it is not too dependent on other parties. Thus, it can be concluded that the consideration of ownership of the contractor's resources becomes a factor for the contractor to continue the tender process that he follows by making an offer. Because with its capital and equipment, the contractor will be able to offer more efficiently. 


Sign in / Sign up

Export Citation Format

Share Document