Optimal coordination strategies for flood control and hydropower generation of reservoir

Author(s):  
Lin Zhang ◽  
Wei Ding ◽  
Guoli Wang

<p>During flood seasons, the water head of the reservoir is kept in flood limited water level (FLWL) to satisfy the flood control objective, but this runs counter to the need for hydropower generation to maintain a high water-head. This paper focuses on the optimal hedging rules by setting an appropriate FLWL to maximize the benefit of hydropower without increasing the flood damage and raise the water level at the end of flood for non-flood season/future use. Two-stage hydropower functions considering the constraint conditions which include the downstream environmental flow and installed capacity are built. On the basis of studying the marginal utilities of the two-stage hydropower functions, the competitive and collaborative relationships between flood damage and hydropower benefit were analyzed qualitatively. A two-stage reservoir operation model with two objectives that are minimum flood damage and maximum hydropower generation is developed, which considers streamflow forecast uncertainty and acceptable flood risk. The derived OHR from the model can be used to make trade-offs between flood damage and hydropower benefit under different levels of streamflow forecast uncertainty or acceptable risk. Finally, the analysis is applied to the Nierji Reservoir in the north of China. The results indicate that the OHR can increase hydropower generation 1.57x106kw·h and decrease the volume of abandoned water30.04x106m3 average annual.</p>

2012 ◽  
Vol 7 (5) ◽  
pp. 540-546 ◽  
Author(s):  
Takayoshi Matsumura ◽  
◽  
Hiroshi Kamiya ◽  
Naohiro Yoshida ◽  

Heavy rain with Typhoon 18 threatened the Nabari River Basin, Kansai region, with inundation early on the morning of October 8, 2009. The Nabari River is a tributary of the Yodo river basin that contains Osaka and Kyoto and runs through Nabari City, which is a residential zone a commutable distance from Osaka city. In the upper reaches of the Nabari, there are three multipurpose dams – Shorenji Dam, Hinachi Dam, and Murou Dam – that are operated by the Kizugawa Integrated Dam Control and Management Office (KIDCMO), a branch office of the Japan Water Agency (JWA). Since it rained heavily downstream from the three dams, regular operation of the dams complying with given flood control regulations appeared unable to save Nabari City from inundation. The JWA and Ministry of Land, Infrastructure, Transport and Tourism (MLIT) therefore conducted collaborative operation of the three dams to avoid inundating the city. In this case, flood control operation of the three dams commenced at an early stage before inflow reached defined flood discharge in consideration of the water level of the Nabari River, rainfall conditions, and the capacity of reservoirs. During operation, discharge from dams was changed in a timely manner and appropriately through collaborative operation of the three dams in order to maximize the effectiveness of all flood control capacities of reservoirs based on the latest rainfall forecast technology and runoff analysis. The use of improved rainfall forecast technology and runoff analysis models enabled effective application of flexible operation protocols. It is estimated that this operation has resulted in a 1.5 m decrease in the water level at the Nabari design control point and saved approximately 1,200 households from inundation. Considering recent climate change, it is possible to have extreme rainfall more often. The proof of the adaptability of this flexible operation is quite meaningful not only for flood damage mitigation in the downstream but also for future prospects of flood control by dams.


2007 ◽  
Vol 56 (4) ◽  
pp. 87-95 ◽  
Author(s):  
A. Winterscheid

It is now commonly accepted that the management of flood risks has to be fulfilled within an integrated framework. About two decades ago flood risk was managed from a limited perspective predominantly by means of structural measures aimed at flood control. In contrast integrated flood risk management incorporates the complete management cycle consisting of the phases prevention, protection and preparedness. In theory it is a well described concept. In the stage of implementation, however, there is often a lack of support although a consistent policy framework exists. Consequently, the degree of implementation must be rated as inadequate in many cases. In particular this refers to the elements which focus on preparedness and prevention. The study to which this paper refers emphasises the means and potentials of scenario technique to foster the implementation of potentially appropriate measures and new societal arrangements when applied in the framework of integrated flood risk management. A literature review is carried out to reveal the state-of-the-art and the specific problem framework within which scenario technique is generally being applied. Subsequently, it is demonstrated that scenario technique is transferable to a policy making process in flood risk management that is integrated, sustainable and interactive. The study concludes with a recommendation for three applications in which the implementation of measures of flood damage prevention and preparedness is supported by scenario technique.


2021 ◽  
Vol 13 (9) ◽  
pp. 4857
Author(s):  
Zitong Yang ◽  
Xianfeng Huang ◽  
Jiao Liu ◽  
Guohua Fang

In order to meet the demand of emergency water supply in the northern region without affecting normal water transfer, considering the use of the existing South-to-North Water Transfer eastern route project to explore the potential of floodwater resource utilization in the flood season of Hongze Lake and Luoma Lake in Jiangsu Province, this paper carried out relevant optimal operating research. First, the hydraulic linkages between the lakes were generalized, then the water resources allocation mode and the scale of existing projects were clarified. After that, the actual available amount of flood resources in the lakes was evaluated. The average annual available floodwater resources in 2003–2017 was 1.49 billion m3, and the maximum available capacity was 30.84 billion m3. Then, using the floodwater resource utilization method of multi period flood limited water levels, the research period was divided into the main flood season (15 July to 15 August) and the later flood season (16 August to 10 September, 11 September to 30 September) by the Systematic Clustering Analysis method. After the flood control calculation, the limited water level of Hongze Lake in the later flood season can be raised from 12.5 m to 13.0 m, and the capacity of reservoir storage can increase to 696 million m3. The limited water level of Luoma Lake can be raised from 22.5 m to 23.0 m (16 August to 10 September), 23.5 m (11 September to 30 September), and the capacity of reservoir storage can increase from 150 to 300 million m3. Finally, establishing the floodwater resource optimization model of the lake group with the goals of maximizing the floodwater transfer amount and minimizing the flood control risk rate, the optimal water allocation scheme is obtained through the optimization algorithm.


Proceedings ◽  
2019 ◽  
Vol 48 (1) ◽  
pp. 30
Author(s):  
Luis Hamilton Pospissil Garbossa ◽  
Argeu Vanz ◽  
Matias Guilherme Boll ◽  
Hamilton Justino Vieira

The increasing frequency of extreme storm events has implications for the operation of sewer systems, storm water, flood control monitoring and tide level variations. Accurate and continuous monitor water level monitoring is demanded in different environments. Piezoelectric sensors are widely used for water level monitoring and work submerged in waters subject to the presence of solid particles, biological fouling and saltwater oxidation. This work aimed to develop a simple, low-cost methodology to protect sensors over long-term deployment. The results show that simple actions, costing less than 2 EUR, can protect and extend the lifecycle of equipment worth over 2000 EUR, ensuring continuous monitoring and maintaining quality measurements.


Author(s):  
Chen Wu ◽  
Yibo Wang ◽  
Jing Ji ◽  
Pan Liu ◽  
Liping Li ◽  
...  

Reservoirs play important roles in hydropower generation, flood control, water supply, and navigation. However, the regulation of reservoirs is challenged due to their adverse influences on river ecosystems. This study uses ecoflow as an ecological indicator for reservoir operation to indicate the extent of natural flow alteration. Three reservoir optimization models are established to derive ecological operating rule curves. Model 1 only considers the maximization of average annual hydropower generation and the assurance rate of hydropower generation. Model 2 incorporates ecological objectives and constraints. Model 3 not only considers the hydropower objectives but also simulates the runoff and calculates the ecological indicator values of multiple downstream stations. The three models are optimized by a simulation-optimization framework. The reservoir ecological operating rule curves are derived for the case study of China's Three Gorges Reservoir. The results represent feasible schemes for reservoir operation by considering both hydropower and ecological demands. The average annual power generation and assurance rate of a preferred optimized scheme for Model 3 are increased by 1.06% and 2.50%, respectively. Furthermore, ecological benefits of the three hydrologic stations are also improved. In summary, the ecological indicator ecoflow and optimization models could be helpful for reservoir ecological operations.


Author(s):  
Weiwei Song ◽  
Xingqian Fu ◽  
Yong Pang ◽  
Dahao Song ◽  
Qing Xu ◽  
...  

With the rapid development of China, water pollution is still a serious problem despite implementation of control measures. Reasonable water environment management measures are very important for improving water quality and controlling eutrophication. In this study, the coupled models of hydrodynamics, water quality, and eutrophication were used to predict artificial Playground Lake water quality in the Zhenjiang, China. Recommended “unilateral” and “bilateral” river numerical models were constructed to simulate the water quality in the Playground Lake without or with water diversion by pump, sluice and push pump. Under “unilateral” and “bilateral” river layouts, total nitrogen and total phosphorus meet the landscape water requirement through water diversion. Tourist season in spring and summer and its suitable temperature result in heavier eutrophication, while winter is lighter. Under pumping condition, water quality and eutrophication of “unilateral” river is better than “bilateral” rivers. Under sluice diversion, the central landscape lake of “unilateral river” is not smooth, and water quality and eutrophication is inferior to the “bilateral”. When the water level exceeds the flood control level (4.1 m), priority 1 is launched to discharge water from the Playground Lake. During operation of playground, when water level is less than the minimum level (3.3 m), priority 2 is turned on for pumping diversion or sluice diversion to Playground Lake. After opening the Yangtze river diversion channel sluice, priority 3 is launched for sluice diversion to the Playground Lake. When the temperature is less than 15 °C, from 15 °C to 25 °C and higher than 25 °C, the water quality can be maintained for 15 days, 10 days and 7 days, respectively. Corresponding to the conditions of different priority levels, reasonable choices of scheduling measures under different conditions to improve the water quality and control eutrophication of the Playground Lake. This article is relevant for the environmental management of the artificial Playground Lake, and similar lakes elsewhere.


The correct assessment of amount of sediment during design, management and operation of water resources projects is very important. Efficiency of dam has been reduced due to sedimentation which is built for flood control, irrigation, power generation etc. There are traditional methods for the estimation of sediment are available but these cannot provide the accurate results because of involvement of very complex variables and processes. One of the best suitable artificial intelligence technique for modeling this phenomenon is artificial neural network (ANN). In the current study ANN techniques used for simulation monthly suspended sediment load at Vijayawada gauging station in Krishna river basin, Andhra Pradesh, India. Trial & error method were used during the optimization of parameters that are involved in this model. Estimation of suspended sediment load (SSL) is done using water discharge and water level data as inputs. The water discharge, water level and sediment load is collected from January 1966 to December 2005. This approach is used for modelled the SSL. By considering the results, ANN has the satisfactory performance and more accurate results in the simulation of monthly SSL for the study location.


1976 ◽  
Vol 64 (1) ◽  
pp. 25-38
Author(s):  
N. H. West ◽  
D. R. Jones

1. Diving apnoea in Rana pipiens was initiated by submerging the external nares. As the water level was raised above the frog, both buccal and lung pressure increased by an amount corresponding to the water head. During submergence the external nares remained closed, although the apnoeic period was punctuated by ventilation movements which moved gas between the lungs and buccal cavity. 2. Bilateral section of the ophthalmic nerves did not alter the normal pattern of ventilation in air, although it often resulted in the intake of water into the buccal cavity on submergence. Introduction of water into the buccal cavity, either naturally as in denervates or by injection through a catheter in intact frogs, triggered sustained electromyographical activity in some respiratory muscles. 3. Electroneurograms recorded from the cut peripheral end of an ophthalmic nerve showed that receptors in the external narial region were stimulated by movement of a water meniscus across them. Activity could also be recorded in the ophthalmic nerve in response to water flow past the submerged nares. Punctate stimulation of the narial region confirmed that these receptors were mechanosensitive. 4. Bilateral electrical stimulation of the central ends of cut ophthalmic nerves in lightly anaesthetized frogs caused apnoea with a latency of less than 200 ms. The external nares remained closed throughout the period of stimulation although buccal pressure events, resembling underwater ventilation movements, occurred when stimulation was prolonged.