scholarly journals An approach for evaluation the safety and quality of transport at the open pit mines, based on the EDAS method

2017 ◽  
pp. 139-144
Author(s):  
Mlađan Maksimović ◽  
Miodrag Brzaković ◽  
Miloš Grahovac ◽  
Ivana Jovanović
Keyword(s):  
Open Pit ◽  
2019 ◽  
Vol 105 ◽  
pp. 01047
Author(s):  
Alexei Selyukov ◽  
Andrey Gerasimov ◽  
Kirill Byrdin

Today, up to two-thirds of the world’s minerals are mined in an open, more economical way. However, at the same time, billions of tons of overburden are extracted, which are piled in the dumps, where they are polluted, lose their value and, in addition, reduce the quality of the environment. The possibility of industrial use of various rocks of from quarry field characterizes the complexity of minerals extracted by surface mining. Currently, there are no clear criteria for determining the size of blocks when designing enterprises for open pit mining. In most cases, when designing open pit mines, a quarry field is conventionally divided into several blocks, which does not always ensure the optimal production capacity of the mining enterprise due to the uneven distribution of reserves in the block contours. Because of that, during the transition from one block to another, a decrease in the production capacity of the enterprise can be noted. To avoid productivity decreasing, the precise analysis of the block parameters must be performed.


2021 ◽  
Vol 303 ◽  
pp. 01007
Author(s):  
Anton Voronov ◽  
Alexey Khoreshok ◽  
Yuri Voronov ◽  
Artyom Voronov

Assessment of the shovel-truck system (STS) operation quality is based on the well-known method of non-expert assessment of the quality of mining machines. The methodology is based on the fundamental principles of qualimetry and allows making the assessment of functionally homogeneous machines of different sizes, types and designs based on the functional criterion of the machine, which determines its main purpose. In this work, the quality assessment is made not for a single machine, but for a set of machines, taking into account their interaction. Assessment of the STS operation quality allows us to create a basis for the selection of priority areas for its improvement. The work uses methods of mathematical modeling, data collection and processing, statistics, analysis and synthesis. A comprehensive quality assessment makes it possible to predict the level and select priority areas for improving existing STSs or STSs being projected.


2020 ◽  
Vol 1 (2) ◽  
Author(s):  
Xuan Cuong Ngo ◽  
Do NHU Y ◽  
Tran QUANG HIEU

At present, in open-pit mining, the main and most important electrical load is the electric excavator, and currently using a variety of EKG excavators. 6kV electrical network in open pit mining has the characteristics such as long outgoing lines, use high-powered equipment, multiple branches, and increasing use of power electronics on the grid, this reduces the quality of the power supplied to the excavators EKG, resulting in an increase in power losses thereby greatly affecting the performance of the excavators. Previous studies on the quality of the power supplied to the excavator often only mentioned voltage deviations, in addition to this factor, the performance of the excavator is also greatly affected by nonsinusoidal voltage waveforms of the excavator power supply. This paper analyzes the influence of the nonsinusoidal of voltage on the power loss of electric motors used in EKG electric excavators in open pit mining based on the method of electromagnetic analysis and verification on simulation software.


Author(s):  
V. V. Agafonov ◽  
V. Yu. Zalyadinov ◽  
M. E. Yusupov ◽  
N. S. Bikteeva

Sustainability of mining companies is of of high concern. The problem is specifically acute at companies that are monotownor monosettlement-forming. Sustainability of a mine depends in many ways on product quality and production resource-intensity. This article discusses formation of mineral quality indexes in terms of an open pit chrysotile mine. The studies took into account specific features of operation procedures implemented by each structural division of the mine. The analysis has found managerial and technological inconsistencies which affect quality and marketable product output, as well as efficiency of the mine in whole. The background for efficiency enhancement at a company is, by the authors’ opinion, consolidation of personnel subject to the single development strategy, namely: improvement of production and control efficiency, as well as use of available reserves and resources by means of better setup for production. The proposed approaches to planning mining operations and forming mineral quality allow higher quality of processing stock. In addition, a new model proposed for interaction between structural divisions of a mining company ensures improvement of general production indexes.


Author(s):  
G. N. Shapovalenko ◽  
S. N. Radionov ◽  
V. V. Gorbunov ◽  
V. A. Khazhiev ◽  
V. Yu. Zalyadnov ◽  
...  

Chernogosky open pit mine integrates truck-and-shovel system of mining with overburden rehandling to internal dump with a set of walking excavators for rehandling of overburden to mined-out area of the pit. It is possible to improve efficiency of stripping in the conditions of Chernogorsky OPM by reducing percentage of stripping with more expensive handling system. The relevant research and solutions to this effect are presented in this article. Comparative characterization of mining conditions and parameters of mining systems applied is given for open pit mines Chernogorsky, Turnui, Nazarovsky, Vostochno-Beisky and Izykh. The comparative analysis points at the need to account for difficulty of mining and process sites in comparison of equipment productivity. High concentration of mining machines, which is conditioned by narrow mining front and simultaneous operation of five faces, as well as blasting operation implemented every 1-2 days, are recognized as the main constraints of excavator capacity in mining with direct dumping in Chernogorsky open pit mine. The management and engineering solutions implemented in the mine and resulted in higher efficiency of draglines are described.


Author(s):  
E. A. Vakulin ◽  
A. I. Zayats ◽  
V. A. Beklemeshev ◽  
V. A. Ivashkevich ◽  
V. A. Khazhiev ◽  
...  

Investigation of failures is one of the critical activities of mining and haulage equipment operability assurance in mining. Maintaining failure investigation at the required quality level, it is possible to identify provisions, rules and procedures that should be revised or changed, operation conditions that should be improved, additional personnel training, if required, etc. Investigation of failures in mines is under responsibility of machine men and electricians of maintenance and operation services. In reality, factory management and setup for production condition weak concernment of these workers in quality investigation aimed at finding of sources of equipment failures. This article describes real-life results achieved in development and use of maintenance service operation, technology and management monitoring. The requirements are substantiated for quality improvement in failure cause finding and removal in mining and haulage equipment at Chernogorsky open pit mine, SUEK-Khakassia. Causes of the present quality of failure investigation by machine men of Chernogorsky Repair and Engineering Works and Chernogorsky open pit mine are revealed. The proposed recommended practices will improve quality of mining and haulage equipment failure investigation.


2018 ◽  
Vol 5 ◽  
pp. 59-64
Author(s):  
P.A. Prokhorov ◽  
◽  
Val.V. Sencus ◽  
A.L. Mansurov ◽  
◽  
...  