scholarly journals Study on the Establishment of Large Building Airtightness Measurement Standards

2014 ◽  
Vol 34 (1) ◽  
pp. 117-124
Author(s):  
Dong-Seok Lee ◽  
Kyung-Hwan Ji ◽  
Jae-Hun Jo
2020 ◽  
pp. 3-14
Author(s):  
O. M. Samoylenko ◽  
O. V. Adamenko ◽  
B. P. Kukareka

Reference method for simultaneous calibration of the three and more measurement standards for vertical angle measurement is developed. This method can to use for obtaining the systematic biases of the vertical angles measurements for each of the measuring standards relative of the horizontal plain was averaged from measurement results in time their calibration or comparison. For realization of the reference method was developed the autocollimationel electronic measurement standard for the automatization measurement of the vertical angles SeaLineZero_Standard™ (SLZ_S™). Summary standard deviation (k=1) of the vertical angle measurement relative the horizontal plane, from the results of their calibration by reference method, is not more 0,07ʺ…0,15ʺ. This result was obtained without the use the systematic biases, for each measurement standards, as measurements corrections (with opposite sign). The measuring standards, that were developed and researched, are necessary for obtaining the systematic biases of the vertical angle measurement for total stations and theodolites, that have the normed standard error 0,5ʺ and 1ʺ, when these instruments are calibrating.


2021 ◽  
Vol 11 (14) ◽  
pp. 6537
Author(s):  
Marian Łupieżowiec

The article presents the concept of monitoring buildings and infrastructure elements located near large construction investments (the construction of high-rise buildings of the Oak Terraces housing estate in Katowice and the construction of a tunnel under the roundabout in Katowice along the intercity express road DTŚ). The impacts include deep excavation, lowering of the groundwater level over a large area, and dynamic influences related to the use of impact methods of soil improvement. The presented monitoring includes observation of the groundwater level with the use of piezometers, geodetic measurements of settlement and inclinations, as well as the measurement of vibration amplitudes generated during the works involving shocks and vibrations. It was also important to observe the development of cracks on the basis of a previously made inventory of damage. The results of the monitoring allow corrections to be made in the technology of works (e.g., reduction of vibration amplitudes, application of additional protections at excavations, etc.) or the use additional safety measures. Currently, there are also monitoring systems used during the operation of completed facilities.


2007 ◽  
Vol 48 ◽  
pp. 1361-1366
Author(s):  
Li Xiaogai ◽  
Liu Xiaojun ◽  
Jiang Xiangqian ◽  
Xu Zhengao

Sign in / Sign up

Export Citation Format

Share Document