scholarly journals Bolts Connection Technique Of Bamboo In Construction Work

2017 ◽  
Vol 14 (04) ◽  
pp. 54-60
Author(s):  
Salman Salim ◽  
Ahmad Hakimi Mat Nor ◽  
MohdErwan Sanik ◽  
Mohammad Hairi Osman ◽  
MohdSufyan Abdullah ◽  
...  
Keyword(s):  
REVITALISASI ◽  
2020 ◽  
Vol 8 (1) ◽  
pp. 56
Author(s):  
Dessy Kusuma Wardani ◽  
Edy Swasono

This study aims to identify the dominant factors of the successful implementation of benchmarking on the performance of contracting companies and test the significance of the application of benchmarking on the performance of contracting companies. The research sample was saturated samples of 65 qualified contractor companies. The method and type of research used were correlational methods of multiple regression analysis using SPPS. The results of the study concluded that 1.Benchmarking significantly influences the performance of contracting companies in the Blitar City DPUPR; 1. The ranking of success factors for the Blitar City contractor companies in the process of implementing benchmarking (1) planning, (2) data collection, (3) acception and action and (4) analysis; 2.Benchmarking has proven to significantly improve company performance as measured by increasing (1) Corporate Finance (2) Company productivity, (3) DPUPR Consumer Satisfaction, (4) Community Satisfaction, (5) Quality of the company's construction technical personnel, (6) Satisfaction employee work, (7) Project acquisition rate in one year, (8) Effective completion of construction work, (9) Construction product quality.


2009 ◽  
Vol 12 (-1) ◽  
pp. 95-103
Author(s):  
Jacek Zabielski ◽  
Piotr Bogacz

2020 ◽  
pp. 469-496
Author(s):  
Grzegorz Majcherek

The report offers an account of archaeological and conservation work carried out at the site. Excavations in the central part of the site (Sector F) were continued for the fourth season in a row. Exploration of remains of early Roman houses led to the discovery of a well preserved multicolored triclinium mosaic floor with a floral and geometric design. A large assemblage of fragments of polychrome marble floor tiles, recorded in the house collapse, showed the scale of importation of decorative stone material from various regions of the Mediterranean. Overlying the early Roman strata was direct evidence of intensive construction work carried out in the vicinity in the form of large-scale kilnworks, supplying lime most probably for the building of the late Roman bath and cistern. Included in the presentation is a brief review of the limited conservation work that was conducted in the complex of late antique auditoria.


2016 ◽  
Vol 824 ◽  
pp. 676-683
Author(s):  
Michaela Hlásková ◽  
Lenka Gábrová ◽  
František Vajkay

Lighting conditions in buildings are verified by experts on a daily basis. Such verifications may be done at several phases in various ways. In the field of daylighting, it is common to make an assessment within the pre-design and in-design phases of a construction work throughout calculations, only rarely by measurements. This approach is the opposite of artificial lighting design, which is done within the in-design phase by calculations and is verified by measurements in post-realization phase. The verification of artificial lighting design is required by the building and public health authority otherwise buildings cannot be approved to use. In the field of daylighting, measurements could be performed as well, nevertheless those are often problematic because regulations usually require fulfilments of the daylight factor which can be determined only under CIE overcast sky. Howbeit, both artificial lighting and daylighting measurements are influenced by many errors, e.g. errors of light measurement instruments, measurement conditions, measurement methods and human factor. The paper is focused on this aspect of lighting design, more specifically on the daylighting measurement errors.


Sign in / Sign up

Export Citation Format

Share Document