clearance concept
Recently Published Documents


TOTAL DOCUMENTS

16
(FIVE YEARS 2)

H-INDEX

7
(FIVE YEARS 0)

Author(s):  
Larissa Klaß ◽  
Philipp Ritz ◽  
Marius Hirsch ◽  
John Kettler ◽  
Andreas Havenith ◽  
...  

AbstractRadioactive mercury waste constitutes a significant challenge, as no approved disposal concept yet exists for such waste in Germany. This work describes a decontamination and measurement procedure for a possible clearance of mercury from nuclear facilities and release into reuse or conventional hazardous waste disposal to reduce the amount of mercury in a nuclear repository. The measurement setup and procedure were developed and evaluated including Monte-Carlo N-Particle® Transport Code (MCNP® and Monte Carlo N-Particle® are registered trademarks owned by Los Alamos National Security, LLC, manager and operator of Los Alamos National Laboratory, (Werner 2018, Werner 2017)), simulations to ensure conservative assumptions during the measurements. Results from decontaminated mercury samples show that a clearance pursuant to the German regulations would be feasible.


2018 ◽  
Vol 35 (12) ◽  
Author(s):  
Leslie Z. Benet ◽  
Christine M. Bowman ◽  
Shufang Liu ◽  
Jasleen K. Sodhi

2016 ◽  
Vol 110 ◽  
pp. S81-S87
Author(s):  
Yasuhiro Yumoto ◽  
Shigeru Okada ◽  
Ikuo Kinno ◽  
Tomohiro Nagamatsu ◽  
Kazuhiro Nouso ◽  
...  

Author(s):  
Annett Kunze ◽  
Birk Poller ◽  
Jörg Huwyler ◽  
Gian Camenisch

AbstractDuring drug development, it is an important safety factor to identify the potential of new molecular entities to become a victim of drug-drug interactions (DDIs). In preclinical development, however, anticipation of clinical DDIs remains challenging due to the lack ofWe applied a recently developedHepatic statin clearances were well-predicted by the ECCCS with six out of eight clearances projected within a two-fold deviation to reported values. In addition, worst-case DDI predictions were projected for each statin. Based on the ECCCS class assignment (4 classes), the mechanistic interplay of metabolic and transport processes, resulting in different DDI risks, was well-reflected by our model. Furthermore, predictions of clinically observed statins DDIs in combination with relevant perpetrator drugs showed good quantitative correlations with clinical observations.The ECCCS represents a powerful tool to anticipate the DDI potential of victim drugs based on


Author(s):  
Stefan Wo¨rlen ◽  
Marco Steinbusch ◽  
Alexander Kummer ◽  
Stefan Thierfeldt ◽  
Frank Schartmann

The nuclear power plant Wu¨rgassen in Germany entered into decommissioning in 1995. The project has currently advanced to the clearance of the buildings. Clearance of buildings has commenced in 2007 with establishing the clearance procedure in pilot rooms. It has entered the “productive” phase in 2010 and will last until about 2014. In 2007, Brenk Systemplanung has been commissioned by E.ON / NPP Wu¨rgassen to perform clearance of the pilot rooms in the turbine building. It has been one of the goals of this work to establish an innovative clearance procedure which would not rely on 100% surface measurements but which should be based on the use of in situ gamma spectrometry and the application of approaches to minimise the number of clearance measurements. In 2010 and 2011 Brenk Systemplanung has been commissioned by E.ON / NPP Wu¨rgassen to perform clearance of rooms with partly considerably higher contamination levels in other buildings. Central points of the concept for clearance of buildings which is presented in this paper were the establishment of averaging areas of up to 10 m2, which is an ideal size for the use of in situ gamma spectrometry, and the application of statistical methods, which allow an efficient performance of the clearance measurements. As a first step the measurement instrumentation necessary for the performance of clearance measurements had to be qualified. The innovative concept was first tested and implemented in the pilot rooms and has now been used also in various other parts of the NPP Wu¨rgassen. The procedure which has been established by Brenk Systemplanung for NPP Wu¨rgassen allows rapid measurements making best use of the averaging area and measurement area of collimated in situ gamma spectrometry and minimising the number of single measurements in comparison to other clearance procedures for nuclear installations of similar size. The paper highlights the relevant approaches and the conceptual differences and innovations.


Sign in / Sign up

Export Citation Format

Share Document