The Guidelines of Modeling – An Approach to Enhance the Quality in Information Models

Author(s):  
Reinhard Schuette ◽  
Thomas Rotthowe
Keyword(s):  

The variants of the division of the life cycle of a construction object at the stages adopted in the territory of the Russian Federation, as well as in other countries are considered. Particular attention is paid to the exemplary work plan – "RIBA plan of work", used in England. A feature of this document is its applicability in the information modeling of construction projects (Building information Modeling – BIM). The article presents a structural and logical scheme of the life cycle of a building object and a list of works that are performed using information modeling technology at various stages of the life cycle of the building. The place of information models in the process of determining the service life of the building is shown. On the basis of the considered sources of information, promising directions for the development of the life cycle management system of the construction object (Life Cycle Management) and the development of the regulatory framework in order to improve the use of information modeling in construction are given.


Author(s):  
T.B. Aldongar ◽  
◽  
F.U. Malikova ◽  
G.B. Issayeva ◽  
B.R. Absatarova ◽  
...  

The creation of information models requires the use of known methods and the development of new methods of formalizing the pre-design research process. The modeling process consists of four stages: data collection on the object of management - pre-project research; creation of a graphical model of business processes taking place in the enterprise; development of a formal model of business processes; business research by optimizing the formal model. To support the creation of workflow management services and systems, the complex offers methodologies, standards and specialized software that make up the developer's tools. This can be ensured only by modern automated methods based on information systems. It is important that the information collected is structured to meet the needs of potential users and stored in a form that allows the use of modern access technologies. Before discussing the effectiveness of FIM, it should be noted that the basic concept of information itself is still not the same. In a pragmatic way, it is a set of messages in the form of an important document for the system. Information can be evaluated not only by volume, but also by various parameters, the most important of which are: timeliness, relevance, value, aging, accuracy, etc. in addition, the information may be clear, probable and accurate. The methods of its reception and processing are different in each case.


Author(s):  
Behnam Atazadeh ◽  
Leila Halalkhor Mirkalaei ◽  
Hamed Olfat ◽  
Abbas Rajabifard ◽  
Davood Shojaei

Land ◽  
2021 ◽  
Vol 10 (8) ◽  
pp. 822
Author(s):  
Ali Asghari ◽  
Mohsen Kalantari ◽  
Abbas Rajabifard

Among 3D models, Building Information Models (BIM) can potentially support the integrated management of buildings’ physical and legal aspects in cadastres. However, there is not a systematic approach to author the cadastral information into the BIM models. Moreover, the common approaches for data validation only check the final cadastral output, and they ignore the data generation steps as potential avenues for validation. Therefore, this study aims to develop the criteria and standards to check the spatial consistency and integrity of BIM-based cadastral data in the process of generating the data. The paper utilises a case study approach as its methodology to investigate the requirements of generating a BIM-based cadastral model and identify the issues within the process. The results include a formative assessment (i.e., multistep validation approach during the data generation) alongside a summative assessment (i.e., one-step validation approach at the end of data generation). This study found the summative assessment alone insufficient for 3D cadastral data validation. The paper concludes that a formative and summative assessment together can improve the validity of the data. The results will potentially bring more efficiency to modern land administration processes by avoiding the accumulation of errors in 3D cadastral data generation.


2021 ◽  
Vol 13 (7) ◽  
pp. 1367
Author(s):  
Yuanzhi Cai ◽  
Hong Huang ◽  
Kaiyang Wang ◽  
Cheng Zhang ◽  
Lei Fan ◽  
...  

Over the last decade, a 3D reconstruction technique has been developed to present the latest as-is information for various objects and build the city information models. Meanwhile, deep learning based approaches are employed to add semantic information to the models. Studies have proved that the accuracy of the model could be improved by combining multiple data channels (e.g., XYZ, Intensity, D, and RGB). Nevertheless, the redundant data channels in large-scale datasets may cause high computation cost and time during data processing. Few researchers have addressed the question of which combination of channels is optimal in terms of overall accuracy (OA) and mean intersection over union (mIoU). Therefore, a framework is proposed to explore an efficient data fusion approach for semantic segmentation by selecting an optimal combination of data channels. In the framework, a total of 13 channel combinations are investigated to pre-process data and the encoder-to-decoder structure is utilized for network permutations. A case study is carried out to investigate the efficiency of the proposed approach by adopting a city-level benchmark dataset and applying nine networks. It is found that the combination of IRGB channels provide the best OA performance, while IRGBD channels provide the best mIoU performance.


Sign in / Sign up

Export Citation Format

Share Document