High-Speed Railway Transportation Organization Status

Author(s):  
Limin Jia ◽  
Li Wang ◽  
Yong Qin
2010 ◽  
Vol 44-47 ◽  
pp. 3771-3775
Author(s):  
Chao Long Jia ◽  
Wei Xiang Xu ◽  
Han Ning Wang

Data platform of data sharing and service provide technical support for high-speed railway transportation organization, it provide data parameter and data support for high-speed railway operation management, and it plays an important role in promoting national economic development. In this paper, the metadata theory is used for data storage, data cataloging, data retrieval and data discovery in the management of the Beijing-Shanghai high-speed railway transportation equipment, analyze and propose key technologies of the establishment of data sharing platform based on metadata management of high-speed railway transportation equipment, correlation analysis is made and the result of analysis indicates that data platform can greatly improve the utilization and ability to obtain high-speed railway transportation equipment data. It can also improve the ability to support organizational decision-making of high-speed railway transportation.


Author(s):  
Diana Khairallah ◽  
Olivier Chupin ◽  
Juliette Blanc ◽  
Pierre Hornych ◽  
Jean-Michel Piau ◽  
...  

The design and durability of high-speed railway lines is a major challenge in the field of railway transportation. In France, 40 years of feedback on the field behavior of ballasted tracks led to improvements in the design rules. However, the settlement and wear of ballast, caused by dynamic stresses at high frequencies, remains a major problem on high-speed tracks leading to high maintenance costs. Studies have shown that this settlement is linked to the high acceleration produced in the ballast layer by high-speed trains traveling on the track, disrupting the granular assembly. The “Bretagne–Pays de la Loire” high-speed line (BPL HSL), with its varied subgrade conditions, represents the first large-scale application of asphalt concrete (GB) as the ballast sublayer. This line includes 77 km of conventional track with a granular sublayer of unbound granular material (UGM) and 105 km of track with an asphalt concrete sublayer under the ballast. During construction, instruments such as accelerometers, anchored deflection sensors, and strain gages, among others, were installed on four sections of the track. This paper examines the instrumentation as well as the acquisition system installed on the track. The data processing is explained first, followed by a presentation of the ViscoRail software, developed for modeling railway tracks. The bituminous section’s behavior and response is modeled using a multilayer dynamic response model, implemented in the ViscoRail software. A good match between experimental and calculated results is highlighted.


2019 ◽  
Vol 2019 ◽  
pp. 1-12 ◽  
Author(s):  
Yun Wang ◽  
Yu Zhou ◽  
Xuedong Yan

As a sustainable transportation mode, high-speed railway (HSR) has been developing rapidly during the past decade in China. With the formation of dense HSR network, how to improve the utilization efficiency of train-sets (the carrying tools of HSR) has been a new research hotspot. Moreover, the emergence of railway transportation hubs has brought great challenges to the traditional train-sets’ utilization mode. Thus, in this paper, we address the issue of train-sets’ utilization problem with the consideration of railway transportation hubs, which consists of finding an optimal Train-set Circulation Plan (TCP) to complete trip tasks in a given Train Diagram (TD). An integer programming TCP model is established to optimize the train-set utilization scheme, aiming to obtain the one-to-one correspondence relationship among sets of train-sets, trip tasks, and maintenances. A genetic algorithm (GA) is designed to solve the model. A case study based on Nanjing and Shanghai HSR transportation hubs is made to demonstrate the practical significance of the proposed method. The results show that a more efficient TCP can be formulated by introducing train-sets being dispatched among different stations in the same hub.


2019 ◽  
Vol 11 (7) ◽  
pp. 2141
Author(s):  
Xueqiao Yu ◽  
Maoxiang Lang ◽  
Wenhui Zhang ◽  
Shiqi Li ◽  
Mingyue Zhang ◽  
...  

The rapid and stable development of China’s economy has driven the increasing demand for express transportation. Based on network operation, China Railway Corporation of High-speed Railway launched high-speed rail products, which have attracted wide attention from all walks of life. With the application of high-speed express trains, the market structure of express transportation in China will change dramatically, from highways as the main mode of transportation to high-speed railway transportation relying on a high-speed railway network, which will effectively reduce the environmental pollution caused by express transportation and further improve the sustainable development of the economy and the logistics industry. At present, the freight Electric Multiple Units (EMU) has been successfully developed and has entered the final test stage. In the last paper, we have introduced the theory and method of the high-speed rail express train operation plan. In addition, a train diagram is an important foundation of railway transportation organization. In order to ensure the sustainable development of high-speed rail express trains after they are put into use, based on the operation plan of high-speed rail express trains, this paper establishes a comprehensive compilation model of a high-speed rail express train diagram, considering train running time, freight flow distribution scheme, and the operation plan of freight multiple units, and an exact solution algorithm based on the Lagrange relaxation algorithm is designed. The computational results are encouraging and demonstrate the effectiveness of the model and solution method.


2006 ◽  
Vol 22 (1_suppl) ◽  
pp. 111-132 ◽  
Author(s):  
Scott A. Ashford ◽  
Yohsuke Kawamata

With the possible exception of the Shinkansen railway, transportation structures for the most part performed well in the Niigata Ken Chuetsu earthquake. There were no collapses. The damage appeared limited and repairable, indicating generally good performance despite the severe ground motions in the epicentral region. The reconnaissance team visited every bridge structure crossing the Uono and Shinano rivers in the epicentral region. All but two of the highway bridges inspected were open for at least limited traffic, and those two appeared to be open for emergency vehicles. Significant damage was observed on the Shinkansen high-speed railway, as well as on some local railway lines, but all appeared repairable. A historic first was the earthquake's derailment of a high-speed Shinkansen train.


2013 ◽  
Vol 831 ◽  
pp. 348-353
Author(s):  
Ya Ping Li ◽  
Meng Yang

With the development of railway transportation, the traffic load increased continuously and it had the adverse effect on the system of pier-foundation. The quantitative analysis of the load supplied on the top pier is necessary for analyzing the dynamic response of pier-foundation system. Based on the theory of vibration inverse analysis and finite element method, the paper identified the dynamical load supplied on the top pier in vertical and the transverse direction. Combined with the vibration and acceleration history measured by the field test in Xiaolinhe Bridge, the vertical and transverse direction vibration-load history curves were calculated when the train speeds were 153 km/h and 206 km/h respectively. The results indicated that the amplitude of dynamic load increased with the higher speed of train.


2017 ◽  
Vol 1 (1) ◽  
pp. 26
Author(s):  
Tianrui Kou

In recent ten years, the rapid development of China high-speed railway is called "China miracle", and it not only provides great convenience for people's daily life trip, but also greatly promotes the economic development. However, the annual spring transportation in the special period is still a great challenge to high-speed railway transportation, and this paper analyzes the high-speed railway ticket for spring transportation from the perspective of microeconomics, and then thinks for the solution.This paper specifically analyzes the problem that demand exceeds supply for high-speed railway ticket by using the theories of the demand elasticity of supply and demand and the influence of price on supply and demand, monopoly markets. In addition, opportunity cost, incomplete information and other economic principles are used to think about the theoretical reasons for the difficulty of buying tickets during the spring transportation. I have given my understanding for the two problems owned by China spring transportation, and the corresponding countermeasures and suggestions. For example, speed up the development of substitutes and carry out the mechanism of price fluctuation; In the ticket refunding mechanism, this paper boldly conceives the method to relieve the pressure through a reasonable and scientific ticket refunding mechanism. Finally, this paper starts from the source and find the key point to solve the problem of spring transportation in China by breaking the urban-rural dual structure.Hereafter the final conclusion was drawn: Although there are some problems to cope with the spring transport for the current China high-speed railway, it is believed that in the near future, the difficulty of buying a ticket in spring transportation will no longer hinder the homecoming of wanderers.


Sign in / Sign up

Export Citation Format

Share Document