Development of an automated As-planned schedule system for efficient scheduling

2015 ◽  
Vol 20 (4) ◽  
pp. 1131-1137 ◽  
Author(s):  
Kyong Ju Kim ◽  
Jin-Young Cho ◽  
Dong-Youl Lee ◽  
Min-Jae Lee
Keyword(s):  
1993 ◽  
Vol 26 (2) ◽  
pp. 589-592
Author(s):  
K. Higashi ◽  
K. Hirata ◽  
S. Shimada ◽  
Y. Ohbanya ◽  
K. Nose ◽  
...  

Author(s):  
Hiroshi Nakano ◽  
Kenichi Sugitani ◽  
Takayuki Nagai ◽  
Shinichiro Kubota ◽  
Masahiro Migita ◽  
...  

2018 ◽  
Vol 2018 ◽  
pp. 1-17 ◽  
Author(s):  
Edmanuel Cruz ◽  
Félix Escalona ◽  
Zuria Bauer ◽  
Miguel Cazorla ◽  
José García-Rodríguez ◽  
...  

The accelerated growth of the percentage of elder people and persons with brain injury-related conditions and who are intellectually challenged are some of the main concerns of the developed countries. These persons often require special cares and even almost permanent overseers that help them to carry out diary tasks. With this issue in mind, we propose an automated schedule system which is deployed on a social robot. The robot keeps track of the tasks that the patient has to fulfill in a diary basis. When a task is triggered, the robot guides the patient through its completion. The system is also able to detect if the steps are being properly carried out or not, issuing alerts in that case. To do so, an ensemble of deep learning techniques is used. The schedule is customizable by the carers and authorized relatives. Our system could enhance the quality of life of the patients and improve their self-autonomy. The experimentation, which was supervised by the ADACEA foundation, validates the achievement of these goals.


2014 ◽  
Vol 530-531 ◽  
pp. 781-784
Author(s):  
Xue Cheng Tang ◽  
Jian Zhou

In this paper,we talk about the design and realization of the command and schedule system for radio and TV transmit stations.We first describe the whole system structure.Then,the paper gives a detailed description about the system function.Finally,we describe the simply implementation of this system and a design scheme is recommended.


2012 ◽  
Vol 252 ◽  
pp. 349-353
Author(s):  
Xiao Hong Lu ◽  
Wen Yi Wu ◽  
Peng Zhuo Han ◽  
Guang Jun Li ◽  
Jie Wei

According to the existing problems in production planning management mode and management processes of Chinese medium and small manufacture enterprise, referring to the advanced management concept of MRPII/ERP, a master production schedule system which is suitable for management state of Chinese medium and small manufacture enterprise is researched and developed. The operation process, data flow and ER model of the master production schedule system are discussed and researched. Finally, Microsoft vb.net is selected as the development tool of the master production schedule system and Microsoft SQL Server 2000 is used as the database management system, a master production schedule prototype system is designed and implemented.


2014 ◽  
Vol 6 ◽  
pp. 754835
Author(s):  
Li Tian ◽  
Cai Meng ◽  
Fugen Zhou

This paper addresses the problem that multiple DSP system does not support OpenCL programming. With the compiler, runtime, and the kernel scheduler proposed, an OpenCL application becomes portable not only between multiple CPU and GPU, but also between embedded multiple DSP systems. Firstly, the LLVM compiler was imported for source-to-source translation in which the translated source was supported by CCS. Secondly, two-level schedulers were proposed to support efficient OpenCL kernel execution. The DSP/BIOS is used to schedule system level tasks such as interrupts and drivers; however, the synchronization mechanism resulted in heavy overhead during task switching. So we designed an efficient second level scheduler especially for OpenCL kernel work-item scheduling. The context switch process utilizes the 8 functional units and cross path links which was superior to DSP/BIOS in the aspect of task switching. Finally, dynamic loading and software managed CACHE were redesigned for OpenCL running on multiple DSP system. We evaluated the performance using some common OpenCL kernels from NVIDIA, AMD, NAS, and Parboil benchmarks. Experimental results show that the DSP OpenCL can efficiently exploit the computing resource of multiple cores.


2010 ◽  
Vol 10 (1) ◽  
pp. 52
Author(s):  
Muhammad Nasri

The existence of travel agency in Malang is viewed as strategic business because it could replace the personal vehicle for heading toward Juanda Airport in Surabaya since Malang itself didn't have any international standard airport so the member of the society who wants to get in or out from Malang using aeroplane should go to Juanda Airport in Surabaya. This would cause the competition among travel services in Malang become more competitive by the emerging of new travel agencies. In case the Kirana Travel Agency would maintain its existence, they need to make efforts to improve its service quality. Therefore, it require an experiment to found out what kind of service attributes that wanted by the customer and how does the gap between the perception and consumer expectancy toward the ongoing service quality. One of the planning method that can be use to translate the need of the consumer into action plan for the company is QFD. This step would be use as evaluation tool and planning on service quality improvement. To sharpened identification of the service quality attributes then the QFD approach integrated with Servqual approach. During the Servqual review, it is found eight service attributes that need to be fixed which is: information accuracy given by the employees, the precise time on pick-up, good reaction of the employees in handling consumer complaints, the availability of health and safety facility (First aid box, fire extinguisher, etc), travel order confirmation, driver that should consistently being polite toward the consumer, easy access to be called and gain information from the operator and travel prices. While the technical response prioritized to be fix and to be use for fulfilling the consumer satisfaction in Kirana Travel from the HOQ analysis includes: employees training (contributed 23.43%), providing special number for complain support (contribution 13.71%), fixing the communication inter-department inside the company (contribution 11.84%), fixing the pick-up schedule system (contribution 8.83%). The improvement proposal given by the researcher is to improve the new and old employee training so it could bring better performance in order to fulfilling the consumer satisfaction.


2020 ◽  
Vol 18 (2) ◽  
pp. 252
Author(s):  
Ridho Dedy Arief Budiman ◽  
Dochi Ramadhani ◽  
Umi Liwayanti ◽  
Ulil Albab

<p><strong>Abstrak </strong></p><p>Tujuan penelitian adalah menganalisis sistem informasi jadwal terpadu di Program Studi Pendidikan Teknologi Informasi dan Komputer (PTIK) IKIP PGRI Pontianak. Metode penelitian adalah deskriptif kualitatif. Subjek penelitian berjumlah 15 orang yang terdiri dari 10 mahasiswa, 4 dosen, dan 1 staf Program Studi PTIK. Alat pengumpulan data menggunakan wawancara dengan teknik pengumpul data menggunakan panduan wawancara. Teknik analisis data menggunakan analisis deskriptif kualitatif. Analisis Sistem Jadwal Terpadu Program Studi PTIK yang dilakukan meliputi jadwal perkuliahan, jadwal dosen pembimbing skripsi, serta jadwal seminar dan skripsi. Hasil penelitian menunjukkan: (1) sistem berjalan yang digunakan tidak memiliki karakteristik usability, functionality, dan visual communication; dan (2) usulan sistem yang baru berbentuk alur program dengan memperhatikan karakteristik usability, functionality, dan visual communication.</p><p><em><strong>Abstract</strong> </em></p><p><em>The purpose of the research was to analyze the integrated schedule information system in the Computer and Information Technology Education Study Program (PTIK) IKIP PGRI Pontianak. The research method used descriptive qualitative. The research subjects were 15 people consisting of 10 students, 4 lecturers, and 1 staff of the PTIK Study Program. Data collection tools used interviews with data collection techniques used interview guides. The data analysis technique used a qualitative descriptive analysis. Analysis of the integrated schedule system of the PTIK Study Program which is carried out includes lecture schedules, thesis supervisor schedules, and seminars or thesis schedules. The results of the research were: (1) the running system used did not have the characteristics of usability, functionality, and visual communication; and (2) the proposed new system is in the form of a program flow by taking into account the characteristics of usability, functionality, and visual communication.</em></p>


Sign in / Sign up

Export Citation Format

Share Document