Steel slag filters to upgrade phosphorus removal in small wastewater treatment plants: Removal mechanisms and performance

2014 ◽  
Vol 68 ◽  
pp. 214-222 ◽  
Author(s):  
Cristian Barca ◽  
Daniel Meyer ◽  
Martin Liira ◽  
Peter Drissen ◽  
Yves Comeau ◽  
...  
2017 ◽  
Vol 12 (3) ◽  
pp. 520-533
Author(s):  
E. Gavalakis ◽  
P. Poulou ◽  
A. Tzimas

Wastewater management in Greece is being regulated by the Urban Waste Water Treatment Directive (UWWTD) and as a result many wastewater treatment plants (WWTPs) have been constructed during the last 30 years and are in operation. The present work aims to outline the progress regarding the implementation of the specific environmental policy, present deficiencies and future challenges, while an evaluation of the performance is conducted for small-medium and large WWTPs focusing on the influent and effluent quality characteristics. In Greece the existing level of treatment provided is related to secondary treatment for the removal of organic load, which in most cases is supplemented by nitrogen removal (for more than 85% of the WWTPs) and phosphorus removal. With respect to the characteristics of the raw municipal wastewater these correspond to typical low to medium strength sewage. Compliance to the UWWTD effluent standards for BOD5, COD and SS is achieved in more than 90% of the WWTPs, while in terms of nutrients, 80% of the WWTPs efficiently remove nitrogen and approximately 45% of the WWTPs remove phosphorus.


1990 ◽  
Vol 22 (7-8) ◽  
pp. 35-43
Author(s):  
K. D. Tracy ◽  
S. N. Hong

The anaerobic selector of the A/0™ process offers many advantages over conventional activated sludge processes with respect to process performance and operational stability. This high-rate, single-sludge process has been successfully demonstrated in full-scale operations for biological phosphorus removal and total nitrogen control in addition to BOD and TSS removal. This process can be easily utilized in upgrading existing treatment plants to meet stringent discharge limitations and to provide capacity expansion. Upgrades of two full-scale installations are described and performance data from the two facilities are presented.


1990 ◽  
Vol 22 (3-4) ◽  
pp. 211-216
Author(s):  
Niels Skov Olesen

In some areas of Denmark nutrient removal is required even for very small wastewater plants, that is down to 500 pe (pe = person equivalents). The goal for the removal is 80% removal of nitrogen and 90% removal of phosphorus, or in terms of concentrations: 8 mg nitrogen/l and 1.2 mg phosphorus/l. The inlet concentrations are typically 40 mg N/l and 10 mg P/l. The paper presents the results from two such plants with a capacity of 800 pe. Phosphorus removal is made by simultaneous precipitation with ferrous sulphate. Nitrogen removal is carried out using the recirculation method. Both plants were originally rotor aerated oxidation ditches. They have been extended with a denitrification reactor and a recirculation pumping station. At present both plants have been in activity for about 3 years and with satisfactory results. Average concentrations of nitrogen (summer) and phosphorus is 7 mg/l and 0.9 mg/l respectively. Nitrogen removal seems to be a practical solution on these small plants. It is,though, sensitive to temperature and highly oxidized rain water. Phosphorus removal seems to be an easily run and relatively non-sensitive technique at least when using simultaneous precipitation.


2018 ◽  
Vol 78 (6) ◽  
pp. 1304-1311 ◽  
Author(s):  
I. Mishima ◽  
M. Hama ◽  
Y. Tabata ◽  
J. Nakajima

Abstract Small-scale wastewater treatment plants (SWTPs), called Johkasou, are widely used as decentralized and individual wastewater treatment systems in sparsely populated areas in Japan. Even in SWTPs, nutrients should be removed to control eutrophication. An iron electrolysis method is effective to remove phosphorus chemically in SWTPs. However, it is necessary to determine the precise conditions under which phosphorus can be effectively and stably removed in full scale SWTPs for a long period. Therefore, long-term phosphorus removal from SWTPs was investigated and optimum operational conditions for phosphorus removal by iron electrolysis were analyzed in this study. Efficient phosphorus removal can be achieved for a long time by adjusting the amount of iron against the actual population equivalent. The change of the recirculation ratio had no negative effect on overall phosphorus removal. Phosphorus release to the bulk phase was prevented by the accumulated iron, which was supplied by iron electrolysis, resulting in stable phosphorus removal. The effect of environmental load reduction due to phosphorus removal by iron electrolysis was greater than the cost of power consumption for iron electrolysis.


2015 ◽  
Vol 809-810 ◽  
pp. 1573-1578
Author(s):  
Casen Panaitescu ◽  
Monica Emanuela Stoica ◽  
Ciner Fehiman

Manufacture of wastewater treatment technologies is an important issue due to the complexity of design parameters and performance. Biological wastewater treatment is a process in which the intensity of oxygen transfer into water is an issue that has been extensively studied but yet insufficiently resolved. The present paper aims to describe an aeration system developed by the author in the laboratory by means of non-conventional technologies, and subsequently implemented in refinery wastewater treatment plants. The aeration system takes the form of modules, which are equipped with a new type of membrane. The analysis of the system performance revealed that oxygen transfer was 62%, specific adsorption of oxygen was 37 % and the specific oxygen transfer was 7%/m. The advantages of this new system are as follows: compared to existing technologies there is a higher rate of oxygen transfer into water; longer life; there are no dead zones in the basin as a result of their location; possibility of operating on separate sections.


Water ◽  
2020 ◽  
Vol 12 (8) ◽  
pp. 2245
Author(s):  
Kateřina Sukačová ◽  
Daniel Vícha ◽  
Jiří Dušek

Phosphorus is one of the non-renewable natural resources. High concentration of phosphorus in surface water leads to undesirable eutrophication of the water ecosystem. It is therefore necessary to develop new technologies not only for capturing phosphorus from wastewater but also for phosphorus recovery. The aim of the study was to propose three different integration scenarios for a microalgal biofilm system for phosphorus removal in medium and small wastewater treatment plants, including a comparison of area requirements, a crucial factor in practical application of microalgal biofilm systems. The area requirements of a microalgal biofilm system range from 2.3 to 3.2 m2 per person equivalent. The total phosphorus uptake seems to be feasible for construction and integration of microalgal biofilm systems into small wastewater treatment plants. Application of a microalgal biofilm for phosphorus recovery can be considered one of the more promising technologies related to capturing CO2 and releasing of O2 into the atmosphere.


Sign in / Sign up

Export Citation Format

Share Document