scholarly journals Modelling hydrodynamics of horizontal flow steel slag filters designed to upgrade phosphorus removal in small wastewater treatment plants

2018 ◽  
Vol 206 ◽  
pp. 349-356 ◽  
Author(s):  
Cristian Barca ◽  
Nicolas Roche ◽  
Stéphane Troesch ◽  
Yves Andrès ◽  
Florent Chazarenc
2014 ◽  
Vol 68 ◽  
pp. 214-222 ◽  
Author(s):  
Cristian Barca ◽  
Daniel Meyer ◽  
Martin Liira ◽  
Peter Drissen ◽  
Yves Comeau ◽  
...  

1990 ◽  
Vol 22 (3-4) ◽  
pp. 211-216
Author(s):  
Niels Skov Olesen

In some areas of Denmark nutrient removal is required even for very small wastewater plants, that is down to 500 pe (pe = person equivalents). The goal for the removal is 80% removal of nitrogen and 90% removal of phosphorus, or in terms of concentrations: 8 mg nitrogen/l and 1.2 mg phosphorus/l. The inlet concentrations are typically 40 mg N/l and 10 mg P/l. The paper presents the results from two such plants with a capacity of 800 pe. Phosphorus removal is made by simultaneous precipitation with ferrous sulphate. Nitrogen removal is carried out using the recirculation method. Both plants were originally rotor aerated oxidation ditches. They have been extended with a denitrification reactor and a recirculation pumping station. At present both plants have been in activity for about 3 years and with satisfactory results. Average concentrations of nitrogen (summer) and phosphorus is 7 mg/l and 0.9 mg/l respectively. Nitrogen removal seems to be a practical solution on these small plants. It is,though, sensitive to temperature and highly oxidized rain water. Phosphorus removal seems to be an easily run and relatively non-sensitive technique at least when using simultaneous precipitation.


2018 ◽  
Vol 78 (6) ◽  
pp. 1304-1311 ◽  
Author(s):  
I. Mishima ◽  
M. Hama ◽  
Y. Tabata ◽  
J. Nakajima

Abstract Small-scale wastewater treatment plants (SWTPs), called Johkasou, are widely used as decentralized and individual wastewater treatment systems in sparsely populated areas in Japan. Even in SWTPs, nutrients should be removed to control eutrophication. An iron electrolysis method is effective to remove phosphorus chemically in SWTPs. However, it is necessary to determine the precise conditions under which phosphorus can be effectively and stably removed in full scale SWTPs for a long period. Therefore, long-term phosphorus removal from SWTPs was investigated and optimum operational conditions for phosphorus removal by iron electrolysis were analyzed in this study. Efficient phosphorus removal can be achieved for a long time by adjusting the amount of iron against the actual population equivalent. The change of the recirculation ratio had no negative effect on overall phosphorus removal. Phosphorus release to the bulk phase was prevented by the accumulated iron, which was supplied by iron electrolysis, resulting in stable phosphorus removal. The effect of environmental load reduction due to phosphorus removal by iron electrolysis was greater than the cost of power consumption for iron electrolysis.


Water ◽  
2020 ◽  
Vol 12 (8) ◽  
pp. 2245
Author(s):  
Kateřina Sukačová ◽  
Daniel Vícha ◽  
Jiří Dušek

Phosphorus is one of the non-renewable natural resources. High concentration of phosphorus in surface water leads to undesirable eutrophication of the water ecosystem. It is therefore necessary to develop new technologies not only for capturing phosphorus from wastewater but also for phosphorus recovery. The aim of the study was to propose three different integration scenarios for a microalgal biofilm system for phosphorus removal in medium and small wastewater treatment plants, including a comparison of area requirements, a crucial factor in practical application of microalgal biofilm systems. The area requirements of a microalgal biofilm system range from 2.3 to 3.2 m2 per person equivalent. The total phosphorus uptake seems to be feasible for construction and integration of microalgal biofilm systems into small wastewater treatment plants. Application of a microalgal biofilm for phosphorus recovery can be considered one of the more promising technologies related to capturing CO2 and releasing of O2 into the atmosphere.


2002 ◽  
Vol 46 (1-2) ◽  
pp. 123-128 ◽  
Author(s):  
J.L. Zilles ◽  
C.-H. Hung ◽  
D.R. Noguera

The objective of this research was to assess the relevance of organisms related to Rhodocyclus in enhanced biological phosphorus removal in full-scale wastewater treatment plants. The presence of these organisms in full-scale plants was first confirmed by fluorescent in situ hybridization. To address which organisms were involved in phosphorus removal, a method was developed which selected polyphosphate-accumulating organisms from activated sludge samples by DAPI staining and flow cytometry. Sorted samples were characterized using fluorescent in situ hybridization. The results of these analyses confirmed the presence of organisms related to Rhodocyclus in full-scale wastewater treatment plants and supported the involvement of these organisms in enhanced biological phosphorus removal. However, a significant fraction of the polyphosphate-accumulating organisms were not related to Rhodocyclus.


2001 ◽  
Vol 44 (1) ◽  
pp. 49-56 ◽  
Author(s):  
M. Wichern ◽  
F. Obenaus ◽  
P. Wulf ◽  
K.-H. Rosenwinkel

In 1999 the Activated Sludge Model no. 3 (ASM 3) by the IWA task Group on Mathematical Modeling for Design and Operation of Biological Wastewater Treatment was presented. The model is used for simulation of nitrogen removal. On the basis of a new calibration of the ASM 3 with the easy degradable COD measured by respiration simulation runs of this paper have been done. In 2000 a biological phosphorus removal module by the EAWAG was added to the calibrated version of ASM 3 and is now serving the current requirements for modelling the enhanced biological P-removal. Only little experiences with different load situations of large-scale wastewater treatment plants were made with both new models so far. This article reports the experiences with the simulation and calibration of the biological parameters using ASM 3 and the EAWAG BioP Module. Three different large-scale wastewater treatment plants in Germany with different treatment systems will be discussed (Koblenz: pre-denitrification; Hildesheim: simultaneous denitrification with EBPR; Duderstadt: intermediate denitrification with EBPR). Informations regarding the choice of kinetic and stoichiometric parameters will be given.


Sign in / Sign up

Export Citation Format

Share Document