scholarly journals Perspectives on Microalgal Biofilm Systems with Respect to Integration into Wastewater Treatment Technologies and Phosphorus Scarcity

Water ◽  
2020 ◽  
Vol 12 (8) ◽  
pp. 2245
Author(s):  
Kateřina Sukačová ◽  
Daniel Vícha ◽  
Jiří Dušek

Phosphorus is one of the non-renewable natural resources. High concentration of phosphorus in surface water leads to undesirable eutrophication of the water ecosystem. It is therefore necessary to develop new technologies not only for capturing phosphorus from wastewater but also for phosphorus recovery. The aim of the study was to propose three different integration scenarios for a microalgal biofilm system for phosphorus removal in medium and small wastewater treatment plants, including a comparison of area requirements, a crucial factor in practical application of microalgal biofilm systems. The area requirements of a microalgal biofilm system range from 2.3 to 3.2 m2 per person equivalent. The total phosphorus uptake seems to be feasible for construction and integration of microalgal biofilm systems into small wastewater treatment plants. Application of a microalgal biofilm for phosphorus recovery can be considered one of the more promising technologies related to capturing CO2 and releasing of O2 into the atmosphere.

2020 ◽  
Vol 15 (2) ◽  
pp. 142-151
Author(s):  
Peter Lukac ◽  
Lubos Jurik

Abstract:Phosphorus is a major substance that is needed especially for agricultural production or for the industry. At the same time it is an important component of wastewater. At present, the waste management priority is recycling and this requirement is also transferred to wastewater treatment plants. Substances in wastewater can be recovered and utilized. In Europe (in Germany and Austria already legally binding), access to phosphorus-containing sewage treatment is changing. This paper dealt with the issue of phosphorus on the sewage treatment plant in Nitra. There are several industrial areas in Nitra where record major producers in phosphorus production in sewage. The new wastewater treatment plant is built as a mechanicalbiological wastewater treatment plant with simultaneous nitrification and denitrification, sludge regeneration, an anaerobic zone for biological phosphorus removal at the beginning of the process and chemical phosphorus precipitation. The sludge management is anaerobic sludge stabilization with heating and mechanical dewatering of stabilized sludge and gas management. The aim of the work was to document the phosphorus balance in all parts of the wastewater treatment plant - from the inflow of raw water to the outflow of purified water and the production of excess sludge. Balancing quantities in the wastewater treatment plant treatment processes provide information where efficient phosphorus recovery could be possible. The mean daily value of P tot is approximately 122.3 kg/day of these two sources. The mean daily value of P tot is approximately 122.3 kg/day of these two sources. There are also two outflows - drainage of cleaned water to the recipient - the river Nitra - 9.9 kg Ptot/day and Ptot content in sewage sludge - about 120.3 kg Ptot/day - total 130.2 kg Ptot/day.


2008 ◽  
Vol 3 (1) ◽  
Author(s):  
Luchien Luning ◽  
Paul Roeleveld ◽  
Victor W.M. Claessen

In recent years new technologies have been developed to improve the biological degradation of sewage sludge by anaerobic digestion. The paper describes the results of a demonstration of ultrasonic disintegration on the Dutch Wastewater Treatment Plant (WWTP) Land van Cuijk. The effect on the degradation of organic matter is presented, together with the effect on the dewatering characteristics. Recommendations are presented for establishing research conditions in which the effect of sludge disintegration can be determined in a more direct way that is less sensitive to changing conditions in the operation of the WWTP. These recommendations have been implemented in the ongoing research in the Netherlands supported by the National Institute for wastewater research (STOWA).


1990 ◽  
Vol 22 (3-4) ◽  
pp. 211-216
Author(s):  
Niels Skov Olesen

In some areas of Denmark nutrient removal is required even for very small wastewater plants, that is down to 500 pe (pe = person equivalents). The goal for the removal is 80% removal of nitrogen and 90% removal of phosphorus, or in terms of concentrations: 8 mg nitrogen/l and 1.2 mg phosphorus/l. The inlet concentrations are typically 40 mg N/l and 10 mg P/l. The paper presents the results from two such plants with a capacity of 800 pe. Phosphorus removal is made by simultaneous precipitation with ferrous sulphate. Nitrogen removal is carried out using the recirculation method. Both plants were originally rotor aerated oxidation ditches. They have been extended with a denitrification reactor and a recirculation pumping station. At present both plants have been in activity for about 3 years and with satisfactory results. Average concentrations of nitrogen (summer) and phosphorus is 7 mg/l and 0.9 mg/l respectively. Nitrogen removal seems to be a practical solution on these small plants. It is,though, sensitive to temperature and highly oxidized rain water. Phosphorus removal seems to be an easily run and relatively non-sensitive technique at least when using simultaneous precipitation.


2011 ◽  
Vol 1 (1) ◽  
pp. 37-56 ◽  
Author(s):  
Sílvia C. Oliveira ◽  
Marcos von Sperling

This article analyses the performance of 166 wastewater treatment plants operating in Brazil, comprising six different treatment processes: septic tank + anaerobic filter, facultative pond, anaerobic pond + facultative pond, activated sludge, UASB reactors alone, UASB reactors followed by post-treatment. The study evaluates and compares the observed effluent quality and the removal efficiencies in terms of BOD, COD, TSS, TN, TP and FC with typical values reported in the technical literature. In view of the large performance variability observed, the existence of a relationship between design/operational parameters and treatment performance was investigated. From the results obtained, no consistent relationship between loading rates and effluent quality was found. The influence of loading rates differed from plant to plant, and the effluent quality was dictated by several combined factors related to design and operation.


2018 ◽  
Vol 78 (6) ◽  
pp. 1304-1311 ◽  
Author(s):  
I. Mishima ◽  
M. Hama ◽  
Y. Tabata ◽  
J. Nakajima

Abstract Small-scale wastewater treatment plants (SWTPs), called Johkasou, are widely used as decentralized and individual wastewater treatment systems in sparsely populated areas in Japan. Even in SWTPs, nutrients should be removed to control eutrophication. An iron electrolysis method is effective to remove phosphorus chemically in SWTPs. However, it is necessary to determine the precise conditions under which phosphorus can be effectively and stably removed in full scale SWTPs for a long period. Therefore, long-term phosphorus removal from SWTPs was investigated and optimum operational conditions for phosphorus removal by iron electrolysis were analyzed in this study. Efficient phosphorus removal can be achieved for a long time by adjusting the amount of iron against the actual population equivalent. The change of the recirculation ratio had no negative effect on overall phosphorus removal. Phosphorus release to the bulk phase was prevented by the accumulated iron, which was supplied by iron electrolysis, resulting in stable phosphorus removal. The effect of environmental load reduction due to phosphorus removal by iron electrolysis was greater than the cost of power consumption for iron electrolysis.


1995 ◽  
Vol 32 (11) ◽  
pp. 85-95 ◽  
Author(s):  
Hassaan A. Abd El Gawad ◽  
J. H. C. Butter

In 1993 the Governorate of Fayoum completed its master plan for wastewater management. The master plan presents a staged implementation schedule for the development of wastewater facilities for the Governorate, covering needs up to the year 2020. The targets are ambitious: in order to meet sanitary health standards, nearly two million people (or 60% of the total population) living in 70 towns and villages would need to be served with sewerage systems. Providing all these areas with separate wastewater treatment plants would be impractical. The centralization of treatment at a limited number of treatment plants for clusters of towns and villages has advantages in terms of manageability, cost and environmental protection. In the master plan the configuration of these clusters is presented. For that purpose a stepped approach has been developed: an approach in which aspects such as construction and operation costs of the facilities, existing infrastructure, the geography of the governorate, environmental impact, alternative treatment technologies and phasing of implementation have been considered. An important element of the stepped approach is an analytical model with which - from financial point of view - the optimum size of a cluster can be estimated. Variables of the model are sizes of towns and villages, distances and treatment technologies. The output of the model is a set of general design criteria which has been applied to the specific situation in the governorate. The model has contributed to the establishment of the Master Plan for Wastewater: a plan now used by the Fayoum Sanitation Department as a framework to initiate new projects and to direct the activities of other agencies working in the sanitation sector in the governorate.


2015 ◽  
Vol 809-810 ◽  
pp. 1573-1578
Author(s):  
Casen Panaitescu ◽  
Monica Emanuela Stoica ◽  
Ciner Fehiman

Manufacture of wastewater treatment technologies is an important issue due to the complexity of design parameters and performance. Biological wastewater treatment is a process in which the intensity of oxygen transfer into water is an issue that has been extensively studied but yet insufficiently resolved. The present paper aims to describe an aeration system developed by the author in the laboratory by means of non-conventional technologies, and subsequently implemented in refinery wastewater treatment plants. The aeration system takes the form of modules, which are equipped with a new type of membrane. The analysis of the system performance revealed that oxygen transfer was 62%, specific adsorption of oxygen was 37 % and the specific oxygen transfer was 7%/m. The advantages of this new system are as follows: compared to existing technologies there is a higher rate of oxygen transfer into water; longer life; there are no dead zones in the basin as a result of their location; possibility of operating on separate sections.


Sign in / Sign up

Export Citation Format

Share Document