Comparison of phosphorus removal characteristics between various biological nutrient removal processes

1997 ◽  
Vol 36 (12) ◽  
1997 ◽  
Vol 36 (12) ◽  
pp. 61-68 ◽  
Author(s):  
Eun Lee Sang ◽  
Soo Kim Kwang ◽  
Hwan Ahn Jae ◽  
Whoe Kim Chang

Bench scale experiments were carried out with four biological nutrient removal(BNR) units, A/O, A2/O, Phostrip and P/L units, to investigate the behavior of phosphorus in the system and to compare the characteristics of phosphorus removal in four experimental BNR units. The influent COD/T-P ratio was varied from 22 to 64 by changing COD concentration while maintaining phosphorus concentration constant. In general sidestream BNR units such as Phostrip and P/L units outperformed mainstream BNR units such as A/O and A2/O units in terms of phosphorus removal. While phosphorus release and uptake in A/O and A2/O units became less significant at low influent COD/T-P, the phosphorus release in A2/O unit was further influenced by nitrate in return sludge and thus A2/O unit required even higher influent COD/T-P ratio for luxury uptake of phosphorus. The luxury uptake of phosphorus in Phostrip and P/L units were not affected by influent COD/T-P ratio and the adverse effect of nitrate in return sludge on anaerobic phosphorus release in P/L process was not significant due to the sludge blanket in P-stripper.


2007 ◽  
Vol 56 (2) ◽  
pp. 95-102 ◽  
Author(s):  
L. Rodríguez ◽  
J. Villaseñor ◽  
I.M. Buendía ◽  
F.J. Fernández

The aim of this study was to evaluate the feasibility of the re-use of the winery wastewater to enhance the biological nutrient removal (BNR) process. In batch experiments it was observed that the addition of winery wastewater mainly enhanced the nitrogen removal process because of the high denitrification potential (DNP), of about 130 mg N/g COD, of the contained substrates. This value is very similar to that obtained by using pure organic substrates such as acetate. The addition of winery wastewater did not significantly affect either phosphorus or COD removal processes. Based on the experimental results obtained, the optimum dosage to remove each mg of N–NO3 was determined, being a value of 6.7 mg COD/mg N–NO3. Because of the good properties of the winery wastewater to enhance the nitrogen removal, the viability of its continuous addition in an activated sludge pilot-scale plant for BNR was studied. Dosing the winery wastewater to the pilot plant a significant increase in the nitrogen removal was detected, from 58 to 75%. The COD removal was slightly increased, from 89 to 95%, and the phosphorus removal remained constant.


2014 ◽  
Vol 507 ◽  
pp. 693-701
Author(s):  
Jiu Yi Li ◽  
Nian Peng Wu ◽  
Jin Li ◽  
Ai Min Wang ◽  
Yong Chen ◽  
...  

Biological nutrient removal (BNR) is generally integrated in municipal wastewater treatment plants to alleviate the impact of treated effluent on receiving watersheds. This paper studies the performance of BNR in a membrane bioreactor system consisting of anaerobic, anoxic, micro-aerobic and aerobic compartments treating a synthetic wastewater containing low organic matters. The membrane bioreactor system designed an anti-stream, stepwise return flow scheme to produce ideal conditions for the occurrence of simultaneous nitrification and denitification and denitrifying phosphorus removal processes. The proposed membrane reactor system has established higher biomass concentrations and ideal environments for biological nutrient removal processes, which results in high nutrient removal efficiencies treating low organic wastewaters. Four compartment configurations in the reactor system minimized the impact of oxidized nitrogen species in return flow on phosphorus release in the anaerobic tank and the anti-stream, stepwise return flow scheme encouraged the utilization of nitrate as the electronic acceptor in phosphorus uptake in the micro-aerobic tank. Denitrifying phosphorus removal and simultaneous nitrification and denitrification processes are the main mechanisms responsible for efficient nutrient removal. High phosphorus release activities and high phosphate concentration in the anaerobic tank make it is potentially feasible to recover phosphorus resource from wastewater.


2021 ◽  
Author(s):  
Maryam Reza

Eutrophication is reported as the most important water quality issue around the world. The potential death of Lake Winnipeg, the world's ninth largest lake, is a dramatic exampe of this ecological disater in Canda. Property price devaluation, tourist repulsion, and toxicity due to eutrophication cause the annual economic losses over $3 billion in Europe, South and North America. The objective of this thesis is to develop an efficient biological nutrient removal reactor to be commercialized and used in the water/wastewater treatment industry. This bioreactor has a unique configuration which is filed as a US patent technology called "Compact Upright Bioreactor for the Elimination of Nutrients", invented by M. Alvarez Cuenca and M. Reza. It consists of four stages including Deaeration, Anoxic, Anaerobic and Aerobic where Do removal, denitrification and phosphorus removal processes take place respectively. The bioreactor performs very well obtaining 100% Do removal and 98% nitrate removal efficiency. The phosphorus removal process requires much longer operational period to reach steady state. The phosphorus removal process shows variable results having a maximum of 60% removal success.


1983 ◽  
Vol 15 (3-4) ◽  
pp. 233-259 ◽  
Author(s):  
A R Pitman ◽  
S L V Venter ◽  
H A Nicholls

This paper describes three years operating experience with two full-scale biological nutrient removal activated sludge plants. Factors affecting biological phosphorus removal are highlighted and possible process improvements suggested.


2008 ◽  
Vol 58 (4) ◽  
pp. 803-810 ◽  
Author(s):  
C. H. Zhao ◽  
Y. Z. Peng ◽  
S. Y. Wang ◽  
X. G. Tang

The effects of influent C/N ratio and C/P ratio on biological nutrient removal performance were investigated in a lab-scale UniFed SBR apparatus treating real domestic wastewater. The results showed that TN removal efficiency increased as C/N ratio increased from 43.6% at 2.8 to 80.8% at 5.7. But when C/N ratio increased further, TN removal efficiency increased very slowly. This was because when C/N ratio was higher than 5.7, complete denitrification in the sludge blanket during feed/decant period had been achieved, TN removal efficiency during this period always kept the maximum value and only TN removal efficiency during aeration period rose as C/N ratio increased. PO43− removal efficiency increased as C/N ratio increased from 27.3% at 2.8 to 88.1% at 5.7. When C/N ratio was 6.5 and above, PO43− concentration couldn't be detected in the effluent. When influent C/N ratio and volumetric exchange ratio were fixed at 6 and 33% respectively, as C/P ratio was higher than 33, PO43− concentration of effluent always remained below the detection level and phosphorus removal efficiency kept stable at 100%, but as the C/P ratio was lower than 33, phosphorus removal efficiency increased as C/P ratio increased linearly. C/P ratio hardly affected TN removal efficiency, which always kept at 82.2%–85.8% in this study.


2006 ◽  
Vol 53 (9) ◽  
pp. 169-175 ◽  
Author(s):  
K. Hamada ◽  
T. Kuba ◽  
V. Torrico ◽  
M. Okazaki ◽  
T. Kusuda

A shortage of organic substances (COD) may cause problems for biological nutrient removal, that is, lower influent COD concentration leads to lower nutrient removal rates. Biological phosphorus removal and denitrification are reactions in which COD is indispensable. As for biological simultaneous nitrogen and phosphorus removal systems, a competition problem of COD utilisation between polyphosphate accumulating organisms (PAOs) and non-polyphosphate-accumulating denitrifiers is not avoided. From the viewpoint of effective utilisation of limited influent COD, denitrifying phosphorus-removing organisms (DN-PAOs) can be effective. In this study, DN-PAOs activities in modified UCT (pre-denitrification process) and DEPHANOX (post-denitrification ptocess) wastewater treatments were compared. In conclusion, the post-denitrification systems can use influent COD more effectively and have higher nutrient removal efficiencies than the conventional pre-denitrification systems.


1988 ◽  
Vol 20 (4-5) ◽  
pp. 51-62 ◽  
Author(s):  
A. R. Pitman ◽  
B. C. Trim ◽  
L. van Dalsen

Various factors are important for the successful performance of biological nutrient removal processes. This paper reviews the performance of the new Bushkoppie Plant in Johannesburg in relation to other nutrient removal plants in the city and from these experiences, highlights important aspects to be considered in the design and operation of these plants. These are substrate quality, denitrification, sludge settleability, aeration, process configuration and sludge handling and disposal.


Sign in / Sign up

Export Citation Format

Share Document