scholarly journals PRE-TERM PRE-LABOUR RUPTURE OF MEMBRANES AND THE ROLE OF AMNIOCENTESIS

2010 ◽  
Vol 21 (2) ◽  
pp. 75-88 ◽  
Author(s):  
ANNA P KENYON ◽  
KHALIL N ABI-NADER ◽  
PRANAV P PANDYA

Pre-labour premature rupture of membranes (PPROM) is defined as rupture of membranes more than 1 hour prior to the onset of labour at <37 weeks gestation. PPROM occurs in approximately 3% of pregnancies and is responsible for a third of all preterm births. Once membranes are ruptured prolonging the pregnancy has no maternal physical advantage but fetal morbidity and mortality are improved daily at early gestations: 19% of those infants born <25 weeks develop cerebral palsy (CP) and 28% have severe motor disability. Those infants born extremely pre term (<28 weeks) cost the public sector £75835 (95% CI £27906–145508) per live birth not to mention the emotional cost to the family. To prolong gestation is therefore the suggested goal: however how and why might we delay birth in those at risk?

Author(s):  
Pierre Pestieau ◽  
Mathieu Lefebvre

This chapter looks at the role of the public versus the private sector in the provision of insurance against social risks. After having discussed the evolution of the role of the family as support in the first place, the specificity of social insurance is emphasized in opposition to private insurance. Figures show the extent of spending on both private and public insurance and the chapter presents economic reasons to why the latter is more developed than the former. Issues related to moral hazard and adverse selection are addressed. The chapter also discusses somewhat more general arguments supporting social insurance such as population ageing, unemployment, fiscal competition and social dumping.


2020 ◽  
Vol 12 (1) ◽  
Author(s):  
Mariya Pavlova ◽  
◽  
◽  

The question regarding the future of the accounting profession is being raised more and more often. The most powerful professional accounting organizations are directing all their resources to study the problems of the future of accounting. The issues regard accounting as a whole, the profession, what types of personnel will be needed for business and the public sector, and possible effects of digitalization. It is argued that the role of the professional accountant is undergoing a dramatic transformation, that in the future she will assume the role of a strategic business partner in the organization and must therefore acquire new competencies. This paper outlines what these competences should be and how to gain them.


Author(s):  
Adyathan Dasyapu ◽  
Greeshmika Nagubilli ◽  
Jayanth V Kutcharlapati ◽  
Hari Prasad Guntuku ◽  
Shruti S Nagdeve

Purpose: Engineering, procurement, and construction (EPC) contracts are on their way to becoming the most common type of contract used by the private sector for large-scale infrastructure projects. Every project requires a strong relationship between all of the experts participating in EPC projects and the client. This relationship must be solidly established by an architect; otherwise, the project may fail for all parties involved, including the client, contractor, lenders, government, and others. The purpose of this study is to identify if the working of the EPC contracts is favourable for the architectural profession, and to identify the way in which the working could be improved. Methodology: A qualitative approach was applied to analyze the critical points of EPC contracts based upon reviews of related case studies from the public sector and supplementary interviews with professionals in the field. Main Finding: The architect's role in an EPC contract is not crucial and is equal to other stakeholders involved in the project. Also, EPC contractors have the power to dictate the workflow of the project and hence, architects might have to compromise in terms of the design, compensation, etc. Implications: It is very important for every project to have an outcome based on each stakeholders/consultants inputs specially on larger projects, this article is a step towards understanding the role of architects under an EPC contract as the future projects will come under its purview.  Novelty: The study is done under the lens of a newly graduated architect and not as any other professional, thereby trying to develop an understanding for fresh architects.


Sign in / Sign up

Export Citation Format

Share Document