scholarly journals Applications of linear programming to optimize the cost-benefit criterion in production processes

2018 ◽  
Vol 183 ◽  
pp. 04004
Author(s):  
Marek Krynke ◽  
Krzysztof Mielczarek

In this paper linear programming was shortly characterized. The implementation of some basic functions for Octave have been presented. It is the GNU General Public License program for the optimization the cost-benefit criterion in production processes. A problem of dividing production tasks between workstations was presented in way that the cost of the realization was the smallest. The final score of the course was obtained the computational environment Octave using the GLPK (GNU Linear Programming Kit) function.

2007 ◽  
pp. 70-84 ◽  
Author(s):  
E. Demidova

This article analyzes definitions and the role of hostile takeovers at the Russian and European markets for corporate control. It develops the methodology of assessing the efficiency of anti-takeover defenses adapted to the conditions of the Russian market. The paper uses the cost-benefit analysis, where the costs and benefits of the pre-bid and post-bid defenses are compared.


2019 ◽  
Author(s):  
Milind Watve

Peer reviewed scientific publishing is critical for communicating important findings, interpretations and theories in any branch of science. While the value of peer review is rarely doubted, much concern is being raised about the possible biases in the process. I argue here that most of the biases originate in the evolved innate tendency of every player to optimize one’s own cost benefits. Different players in the scientific publishing game have different cost-benefit optima. There are multiple conflicts between individual optima and collective goals. An analysis of the cost-benefit optima of every player in the scientific publishing game shows how and why biases originate. In the current system of publishing, by optimization considerations, the probability of publishing a ‘bad’ manuscript is relatively small but the probability of rejecting a ‘good’ manuscript is very high. By continuing with the current publishing structure, the global distribution of the scientific community would be increasingly clustered. Publication biases by gender, ethnicity, reputation, conformation and conformity will be increasingly common and revolutionary concepts increasingly difficult to publish. Ultimately, I explore the possibility of designing a peer review publishing system in which the conflicts between individual optimization and collective goal can be minimized. In such a system, if everyone behaves with maximum selfishness, biases would be minimized and the progress towards the collective goal would be faster and smoother. Changing towards such a system might prove difficult unless a critical mass of authors take an active role to revolutionize scientific publishing.


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


1999 ◽  
Vol 40 (10) ◽  
pp. 153-159 ◽  
Author(s):  
D. H. Newsome ◽  
C. D. Stephen

Many countries are investing in measures to improve surface water quality, but the investment programmes for so doing are increasingly becoming subject to cost-benefit analysis. Whilst the cost of control measures can usually be determined for individual improvement schemes, there are currently no established procedures for valuing the benefits attributable to improved surface water quality. The paper describes a methodology that has been derived that now makes this possible.


2017 ◽  
Vol 37 (1) ◽  
pp. 1-19 ◽  
Author(s):  
Sanaz Aghazadeh ◽  
Marietta Peytcheva

SUMMARY We conduct a post-implementation research analysis of AS4, a standard guiding voluntary audits of material weakness (MW) remediation disclosures, to understand the reasons for the scarcity of AS4 audits in practice. We use multiple methods (experiments, comment letter analysis, and surveys) to understand the perspectives of key stakeholders. We find that regulators' expectations of the use of the standard did not come to fruition because an equilibrium market for active use of the standard could not be achieved; that managers desire to engage in AS4 audits for the riskier MWs but do not expect the associated costs to be high; and that auditors are reluctant to audit riskier MWs and would charge a considerable risk premium. Finally, we find that investors value AS4 audits, especially for riskier MWs, and find value in an AS4 audit for those risky MWs beyond that of the year-end audit. The overall findings of our study indicate that a mismatch in the cost-benefit functions of the key stakeholders led to a lack of AS4 audits. Our findings are important given the high costs associated with auditing standards development and approval.


Animals ◽  
2021 ◽  
Vol 11 (5) ◽  
pp. 1297
Author(s):  
Juntae Kim ◽  
Hyo-Dong Han ◽  
Wang Yeol Lee ◽  
Collins Wakholi ◽  
Jayoung Lee ◽  
...  

Currently, the pork industry is incorporating in-line automation with the aim of increasing the slaughtered pork carcass throughput while monitoring quality and safety. In Korea, 21 parameters (such as back-fat thickness and carcass weight) are used for quality grading of pork carcasses. Recently, the VCS2000 system—an automatic meat yield grading machine system—was introduced to enhance grading efficiency and therefore increase pork carcass production. The VCS2000 system is able to predict pork carcass yield based on image analysis. This study also conducted an economic analysis of the system using a cost—benefit analysis. The subsection items of the cost-benefit analysis considered were net present value (NPV), internal rate of return (IRR), and benefit/cost ratio (BC ratio), and each method was verified through sensitivity analysis. For our analysis, the benefits were grouped into three categories: the benefits of reducing labor costs, the benefits of improving meat yield production, and the benefits of reducing pig feed consumption through optimization. The cost-benefit analysis of the system resulted in an NPV of approximately 615.6 million Korean won, an IRR of 13.52%, and a B/C ratio of 1.65.


Sign in / Sign up

Export Citation Format

Share Document