Research on Ground Subsidence in Shield Tunneling Construction Based on CC Method

ICPTT 2011 ◽  
2011 ◽  
Author(s):  
Huagang He ◽  
Weiguang Liu ◽  
Yipping Kong
2012 ◽  
Vol 182-183 ◽  
pp. 937-940
Author(s):  
Zhong Chang Wang

The fine numerical simulation is used to study the ground settlement of complex stratum owing to shield construction by ANSYS program. It is shown that the closer the distance between soil layer and the axis of tunnel is, the smaller the disturbance of construction is, the obvious the ground surface settlement is. The value of the maximum settlement at the center of the surface is 7.4mm. The maximum settlement of vault is 14mm. The ground subsidence in cross section distribution is shaped of normal distribution. The closer the distance between soil layer and ground surface is, the smaller the vertical displacement is, the bigger the width of settlement trough of soil layers is. The width of settlement trough is 25m. The volume loss rate of shield tunnel is about 0.32%. The width coefficient of ground settlement trough is 0.56. The tendency of ground settlement decrease to become gentle with the advance of shield construction. The ground settlement keeps constant after tunnel face advancing to 30m.


2021 ◽  
Vol 62 (2) ◽  
pp. 47-56
Author(s):  
Thai Ngoc Do ◽  
Truong Duc Nguyen ◽  

Tunneling in urban areas is growing in response to the increased needs for efficient transportation. Many urban tunnels are constructed in soft ground at shallow depths. Metro tunnels are usually constructed as twin-parallel tunnels and their adjacent constructions may lead to surface deformation, affecting the surface environment and the safety of the tunnels. Shield tunnelling is a commonly used as construction technique because it is very effective in reducing ground deformations and thus damage to urban infrastructure. The paper presents a 3D simulation of shield tunneling machines via the finite element code Abaqus and analysis model of ground surface settlements induced by a construction of twin-parallel tunnels. The results show that ground surface settlements induced by a construction of the left tunnel causes surface settlements of about 22÷24 mm and after the construction of both tunnels, it will cause ground subsidence has the greatest value of 33÷35 mm.


2021 ◽  
Vol 11 (19) ◽  
pp. 9323
Author(s):  
Zikun Li ◽  
Jianbing Lv ◽  
Xiaodong Xie ◽  
Helin Fu ◽  
Juan Huang ◽  
...  

This study defined the height ratio of soft-rock strata and established a numerical model for analyzing shield construction in upper-soft, lower-hard composite strata together with field monitoring data. In this way, the influence of shield tunneling while passing under the pile foundation of the culvert at a short distance (the shortest distance is 1.4 m) in the typical upper-soft, lower-hard composite strata in Guangzhou can be examined. Moreover, the reinforcement effects of the ground, the bridges, and the culverts, using the strata-reinforcing plan dominated by the metro jet system (MJS) in a narrow space, are evaluated. Based on the results, (i) the maximum ground subsidence is found at the position in which the height ratio of the soft rock is 1.0. (ii) However, differential subsidence might be found in the subsequent shield construction when the soft-rock height ratio of the adjacent excavated surface ranges from 0 to 0.2 and from 0.5 to 1. (iii) The concentrated release of stress has a greater impact on the structure than the geological conditions of the shield tunneling face. (iv) Reinforcing with the MJS method contains the concentrated release of stress. This study can provide a reference for controlling the deformation of the under-crossing structure in the shield construction of the upper-soft, lower-hard composite strata.


2021 ◽  
Vol 13 (7) ◽  
pp. 168781402110343
Author(s):  
Mei Yang ◽  
Yimin Xia ◽  
Lianhui Jia ◽  
Dujuan Wang ◽  
Zhiyong Ji

Modular design, Axiomatic design (AD) and Theory of inventive problem solving (TRIZ) have been increasingly popularized in concept design of modern mechanical product. Each method has their own advantages and drawbacks. The benefit of modular design is reducing the product design period, and AD has the capability of problem analysis, while TRIZ’s expertise is innovative idea generation. According to the complementarity of these three approaches, an innovative and systematic methodology is proposed to design big complex mechanical system. Firstly, the module partition is executed based on scenario decomposition. Then, the behavior attributes of modules are listed to find the design contradiction, including motion form, spatial constraints, and performance requirements. TRIZ tools are employed to deal with the contradictions between behavior attributes. The decomposition and mapping of functional requirements and design parameters are carried out to construct the structural hierarchy of each module. Then, modules are integrated considering the connections between each other. Finally, the operation steps in application scenario are designed in temporal and spatial dimensions. Design of cutter changing robot for shield tunneling machine is taken as an example to validate the feasibility and effectiveness of the proposed method.


Machines ◽  
2021 ◽  
Vol 9 (8) ◽  
pp. 152
Author(s):  
Litong Lyu ◽  
Xiao Liang ◽  
Jingbo Guo

Segment assembling is one of the principle processes during tunnel construction using shield tunneling machines. The segment erector is a robotic manipulator powered by a hydraulic system to assemble prefabricated concrete segments onto the excavated tunnel surface. Nowadays, automation of the segment erector has become one of the definite developing trends to further improve the efficiency and safety during construction; thus, closed-loop motion control is an essential technology. Within the segment erector, the lifting gantry is driven by dual cylinders to lift heavy segments in the radial direction. Different from the dual-cylinder mechanism used in other machines such as forklifts, the lifting gantry usually works at an inclined angle, leading to unbalanced loads on the two sides. Although strong guide rails are applied to ensure synchronization, the gantry still occasionally suffers from chattering, “pull-and-drag”, or even being stuck in practice. Therefore, precise motion tracking control as well as high-level synchronization of the dual cylinders have become essential for the lifting gantry. In this study, a complete dynamics model of the dual-cylinder lifting gantry is constructed, considering the linear motion as well as the additional rotational motion of the crossbeam, which reveals the essence of poor synchronization. Then, a two-level synchronization control scheme is synthesized. The thrust allocation is designed to coordinate the dual cylinders and keep the rotational angle of the crossbeam within a small range. The motion tracking controller is designed based on the adaptive robust control theory to guarantee the linear motion tracking precision. The theoretical performance is analyzed with corresponding proof. Finally, comparative simulations are conducted and the results show that the proposed scheme achieves high-precision motion tracking performance and simultaneous high-level synchronization of dual cylinders under unbalanced loads.


2021 ◽  
Vol 13 (15) ◽  
pp. 3044
Author(s):  
Mingjie Liao ◽  
Rui Zhang ◽  
Jichao Lv ◽  
Bin Yu ◽  
Jiatai Pang ◽  
...  

In recent years, many cities in the Chinese loess plateau (especially in Shanxi province) have encountered ground subsidence problems due to the construction of underground projects and the exploitation of underground resources. With the completion of the world’s largest geotechnical project, called “mountain excavation and city construction,” in a collapsible loess area, the Yan’an city also appeared to have uneven ground subsidence. To obtain the spatial distribution characteristics and the time-series evolution trend of the subsidence, we selected Yan’an New District (YAND) as the specific study area and presented an improved time-series InSAR (TS-InSAR) method for experimental research. Based on 89 Sentinel-1A images collected between December 2017 to December 2020, we conducted comprehensive research and analysis on the spatial and temporal evolution of surface subsidence in YAND. The monitoring results showed that the YAND is relatively stable in general, with deformation rates mainly in the range of −10 to 10 mm/yr. However, three significant subsidence funnels existed in the fill area, with a maximum subsidence rate of 100 mm/yr. From 2017 to 2020, the subsidence funnels enlarged, and their subsidence rates accelerated. Further analysis proved that the main factors induced the severe ground subsidence in the study area, including the compressibility and collapsibility of loess, rapid urban construction, geological environment change, traffic circulation load, and dynamic change of groundwater. The experimental results indicated that the improved TS-InSAR method is adaptive to monitoring uneven subsidence of deep loess area. Moreover, related data and information would provide reference to the large-scale ground deformation monitoring and in similar loess areas.


Sign in / Sign up

Export Citation Format

Share Document