A Decision Investment Model to Design Manufacturing Systems based on a genetic algorithm and Monte-Carlo simulation

2016 ◽  
Vol 30 (6) ◽  
pp. 590-605 ◽  
Author(s):  
P. Renna
2013 ◽  
Vol 483 ◽  
pp. 607-610 ◽  
Author(s):  
Chun Jie Zhong ◽  
Ying Yu ◽  
Yun Lang Jia

A resource-constrained project scheduling problem with stochastic resource-dependent activity durations is presented in this paper,and the two-point method is employed to simulate the uncertain property.Furthermore a genetic algorithm combined with this method is provided to solve the problem. Compared with the results from the genetic with Monte Carlo simulation, the proposed method is verified to be effective and more efficient.


2003 ◽  
Vol 5 (1) ◽  
pp. 11-25 ◽  
Author(s):  
Gayathri Gopalakrishnan ◽  
Barbara S. Minsker ◽  
David E. Goldberg

A groundwater management model has been developed that predicts human health risks and uses a noisy genetic algorithm to identify promising risk-based corrective action (RBCA) designs. Noisy genetic algorithms are simple genetic algorithms that operate in noisy environments. The noisy genetic algorithm uses a type of noisy fitness function (objective function) called the sampling fitness function, which utilises Monte-Carlo-type sampling to find robust designs. Unlike Monte Carlo simulation modelling, however, the noisy genetic algorithm is highly efficient and can identify robust designs with only a few samples per design. For hydroinformatic problems with complex fitness functions, however, it is important that the sampling be as efficient as possible. In this paper, methods for identifying efficient sampling strategies are investigated and their performance evaluated using a case study of a RBCA design problem. Guidelines for setting the parameter values used in these methods are also developed. Applying these guidelines to the case study resulted in highly efficient sampling strategies that found RBCA designs with 98% reliability using as few as 4 samples per design. Moreover, these designs were identified with fewer simulation runs than would likely be required to identify designs using trial-and-error Monte Carlo simulation. These findings show considerable promise for applying these methods to complex hydroinformatic problems where substantial uncertainty exists but extensive sampling cannot feasibly be done.


2018 ◽  
Vol 46 (2) ◽  
pp. 55-62 ◽  
Author(s):  
Tamás Ruppert ◽  
János Abonyi

Abstract Human resources are still utilized in many manufacturing systems, so the development of these processes should also focus on the performance of the operators. The optimization of production systems requires accurate and reliable models. Due to the complexity and uncertainty of the human behavior, the modeling of the operators is a challenging task. Our goal is to develop a worker movement diagram based model that considers the stochastic nature of paced open conveyors. The problem is challenging as the simulator has to handle the open nature of the workstations, which means that the operators can work ahead or try to work off their backlog, and due to the increased flexibility of the moving patterns the possible crossings which could lead to the stopping of the conveyor should also be modeled. The risk of such micro-stoppings is calculated by Monte-Carlo simulation. The applicability of the simulator is demonstrated by a well-documented benchmark problem of a wire-harness production process.


Sign in / Sign up

Export Citation Format

Share Document