Identifying the most important occupational diseases in the construction industry: case study of building industry in Iran

Author(s):  
Hamidreza Abbasianjahromi ◽  
Reihaneh Talebian
2021 ◽  
Author(s):  
Michael Donn ◽  
Alexis Dykman ◽  
Nilesh Bakshi

This research investigates how contingency is currently calculated in project budgets within the building industry. This is an important aspect to consider as a large proportion of construction projects are significantly over-budget. The study presents three non-simulation methods and one simulation method for calculating cost contingency following the results of a forthcoming journal paper. These methods are applied against a case study project in attempt to highlight the most reliable method, and to create a methodology that will be useful to the industry. This paper identifies that the traditional fixed percentage approach is not sufficient and suggests that this could be one of the main reasons why construction projects are over budget. While it is unclear which method is the most reliable, this study provides a focus for future research into reliability and utilisation of contingency methods in the building industry. The research demonstrates that current practice needs to change to reduce the large number of construction projects that run over budget.


2020 ◽  
Vol 172 ◽  
pp. 10007
Author(s):  
Charlotte Svensson Tengberg ◽  
Carl-Eric Hagentoft

Serial failures have occurred when introducing new technical solutions in the Swedish construction industry. In an earlier interview study exploring introduction of new technical solutions, documentation and reference cases provided by the supplier are given as the main sources for evaluation. This paper aims at addressing the questions: 1. What kind of documentation concerning building physics are provided by suppliers? 2. How well does the suppliers’ documentation meet the need for verification? In order to address these questions, the case of hygrothermal performance of cross laminated timber structures in multifamily dwellings was chosen. An inquiry of data was sent out to four suppliers at the Swedish market, asking for documentation and reference cases provided. Based on the documentation given, an assessment was made of to which extend the documentation can support verification of appliance to the relevant requirements of the Swedish building regulations. The case study shows reference cases are scarce and existing documentation is not comprehensive, thus indicating the building industry might have a disproportional high confidence in reference cases. The results will be used to suggest requirements for reference cases to be used for verification.


2021 ◽  
Author(s):  
Michael Donn ◽  
Alexis Dykman ◽  
Nilesh Bakshi

This research investigates how contingency is currently calculated in project budgets within the building industry. This is an important aspect to consider as a large proportion of construction projects are significantly over-budget. The study presents three non-simulation methods and one simulation method for calculating cost contingency following the results of a forthcoming journal paper. These methods are applied against a case study project in attempt to highlight the most reliable method, and to create a methodology that will be useful to the industry. This paper identifies that the traditional fixed percentage approach is not sufficient and suggests that this could be one of the main reasons why construction projects are over budget. While it is unclear which method is the most reliable, this study provides a focus for future research into reliability and utilisation of contingency methods in the building industry. The research demonstrates that current practice needs to change to reduce the large number of construction projects that run over budget.


2021 ◽  
Vol 13 (21) ◽  
pp. 11845
Author(s):  
Mohanad Yaseen Abdulwahid ◽  
Isaac Galobardes ◽  
Hassan Radoine

The use of timber in the building industry has expanded in many countries over the last 20 years due mainly to its light weight, low adverse impact to the environment, and fair mechanical properties. Despite the development of the construction industry in the Kurdistan Region in Iraq (KRI) in recent years, timber product utilization is still very limited. Therefore, the purpose of this study was to investigate the feasibility of further utilizing timber-based products in the building industry in semi-arid regions using the KRI as a case study. A review of timber product utilization in the region was conducted first and the general properties of timber products were followed. Based on this, a survey focusing on the current situation and suitability of localized grown timber products was carried out to study the feasibility. This article concludes that the use of timber-based products in the KRI presents different barriers, with the availability in the market and technicality of construction with the material being the strongest ones. The article recommends that it is imperative to further research how to promote timber’s utilization in the KRI to be in line with sustainable development.


Author(s):  
Filip Bušina

The aim of the text is to present various approaches towards personnel management in the building industry. The difference in the analysed approaches is partially caused by the fact that sectors within building industry also differ substantially. The paper is divided into five sections dealing among others with personnel management and its efficiency, tools used to measure and improve personnel management efficiency and characteristics of specific problems of personnel management. The principle methods of inquiry used in the text include literature study and case study. The author stresses the fact that construction industry is demanding in terms of personnel management, as it has to deal with special requirements stemming from employment area, including: the seasonal nature of the building works, spasmodic nature of works on individual projects, required qualification of workers in the building industry, building technology and system operations. The author concludes that due to constantly changing environment the building industry uses flexible personnel work systems and that the challenge is to adapt the personnel management system efficiency to the variable environment and make the building industry personnel management flexible.


Buildings ◽  
2021 ◽  
Vol 11 (6) ◽  
pp. 260
Author(s):  
James Ellis ◽  
David John Edwards ◽  
Wellington Didibhuku Thwala ◽  
Obuks Ejohwomu ◽  
Ernest Effah Ameyaw ◽  
...  

This research explores the failure of competitively tendered projects in the UK construction industry to procure the most suited contractor(s) to conduct the works. Such work may have equal relevance for other developed nations globally. This research seeks to teach clients and their representatives that “lowest price” does not mean “best value”, by presenting a case study of a successfully negotiated tender undertaken by a small-to-medium enterprise (SME) contractor; SME studies are relatively scant in academic literature. By applying the “lessons learnt” principle, this study seeks to improve future practice through the development of a novel alternative procurement option (i.e., negotiation). A mixed philosophical stance combining interpretivism and pragmatism was used—interpretivism to critically review literature in order to form the basis of inductive research to discuss negotiation as a viable procurement route, and pragmatism to analyse perceptions of tendering and procurement. The methods used follow a three-stage waterfall process including: (1) literature review and pilot study; (2) quantitative analysis of case study data; and (3) qualitative data collection via a focus group. Our research underscores the need to advise clients and their representatives of the importance of understanding the scope of works allowed within a tender submission before discounting it based solely on price. In addition, we highlight the failings of competitive tendering, which results in increased costs and project duration once the works commence on site. These findings provide new contemporary insight into procurement and tendering in the construction industry, with emphasis on SME contractors, existing relationships, and open-book negotiation. This research illustrates the adverse effects of early cost estimates produced without first securing a true understanding of project buildability and programming. Our work concludes with a novel insight into an alternative procurement option that involves early SME contractor involvement in an open-book environment, without the need for a third-party cost control.


2021 ◽  
Vol 13 (15) ◽  
pp. 8238
Author(s):  
Noemi Bakos ◽  
Rosa Schiano-Phan

To transform the negative impacts of buildings on the environment into a positive footprint, a radical shift from the current, linear ‘make-use-dispose’ practice to a closed-loop ‘make-use-return’ system, associated with a circular economy, is necessary. This research aims to demonstrate the possible shift to a circular construction industry by developing the first practical framework with tangible benchmarks for a ‘Circular University Campus’ based on an exemplary case study project, which is a real project development in India. As a first step, a thorough literature review was undertaken to demonstrate the social, environmental and economic benefits of a circular construction industry. As next step, the guideline for a ‘Circular University Campus’ was developed, and its applicability tested on the case study. As final step, the evolved principles were used to establish ‘Project Specific Circular Building Indicators’ for a student residential block and enhance the proposed design through bioclimatic and regenerative design strategies. The building’s performance was evaluated through computational simulations, whole-life carbon analysis and a circular building assessment tool. The results demonstrated the benefits and feasibility of bioclimatic, regenerative building and neighbourhood design and provided practical prototypical case study and guidelines which can be adapted by architects, planners and governmental institutions to other projects, thereby enabling the shift to a restorative, circular construction industry.


2021 ◽  
Vol 13 (2) ◽  
pp. 754
Author(s):  
H.-Ping Tserng ◽  
Cheng-Mo Chou ◽  
Yun-Tsui Chang

The building industry is blamed for consuming enormous natural resources and creating massive solid waste worldwide. In response to this, the concept of circular economy (CE) has gained much attention in the sector in recent years. Many pilot building projects that implemented CE concepts started to appear around the world, including Taiwan. However, compared with the pilot projects in the Netherlands, which are regarded as the pioneer ones by international society, many CE-related practices are not implemented in pilot cases in Taiwan. To assist future project stakeholders to recognize what the key CE-related practices are and how they could be implemented in their building projects in Taiwan, this study has conducted a series of case studies of Dutch and Taiwanese pilot projects and semi-structured interviews with key project stakeholders of Taiwanese pilot projects. Thirty key CE-related practices are identified via case studies, along with their related 5R principles (Rethink, Reduce, Reuse, Repair, Recycle) and project phases. Suggestion on CE-related practices, their 5R principles, project items, and phases to implement in building projects in Taiwan is also proposed while discussion on differences between two countries’ pilot projects is presented.


Sign in / Sign up

Export Citation Format

Share Document