The Cost the Non-Compliance to the Legal Requirements in a Public Work in the Field of Civil Construction Industry: a Case Study

2014 ◽  
Vol 5 (5) ◽  
pp. 163
Author(s):  
Marcelo C. P. De Souza ◽  
Thays P. Silveira ◽  
Rodrigo Eduardo Catai
2021 ◽  
Vol 10 (4) ◽  
pp. 237-244
Author(s):  
Ahmed Senouci ◽  
Ali Jedinia ◽  
Neil Eldin

This paper presents a case study of a safety training program developed by an international leading construction firm. The study was prompted by the continuing challenge of work- related accidents in the construction industry. Even with the measurable safety improvements in the last several decades, the construction industry still exhibits high rate of occupational fatal injuries compared to other industries. A linear regression model was developed using Microsoft Excel to determine the level of impact of the number of training hours on the resulting safety performance. The analysis confirmed that the number of training hours had a strong impact on reducing safety incidents. The coefficient of determination (R2) demonstrated that the number of training hours accounted for 81% of the variance in the incidents rate. The study results should assist in quantifying the cost-benefits of implementing safety programs, and in justifying the mandating of a certain number of training hours.


2018 ◽  
Vol 7 (4.35) ◽  
pp. 431 ◽  
Author(s):  
Fathoni Usman ◽  
Nur Adibah Jalaluddin ◽  
Sumi Amariena Hamim

Implementation of Value Engineering (VE) in the construction industry has become a proven technique for cost optimization. This paper presents a review of the implementation of BIM in construction industry. The factors that triggered and hinder the implementation of VE and BIM in the current industry and a case study of the application of VE using BIM for cost optimization of renovation works are also discussed. The project which was used for the case study is the renovation of shop lot units to be used as a student centre where student activities will be placed. 3D models of the project were developed as BIM model that provide strong visualization when creating alternatives for VE processes. The function analysis, risk analysis and life-cycle cost analysis were applied to determine the value index for each developed alternative. It shows that the implementation had successfully reduced the cost by approximately 27% and the value of the project increased after the process.


Author(s):  
Jaehyun Lee ◽  
Jaewook Jeong ◽  
Jayho Soh ◽  
Jaemin Jeong

The number of fatalities in the construction industry is highest among all industries; thus, various losses in the form of fatalities in construction represent a significant factor for safety management. If a fatality occurs, it is important to estimate the overall loss, as a significant financial loss occurs for each project participant. However, in studies of the cost of accidents involving a fatality conducted abroad, the framework cannot be applied as it is because insurance types, systems, and legal cost systems differ by country. Therefore, we developed a framework for calculating the fatality loss considering various aspects of labor, industry, and regulations in Korea. This was done in four steps: (i) data collection and criteria selection; (ii) proposed framework development; (iii) conduct of questionnaire surveys for the case study; and (iv) analysis and evaluation of the case study. As a result of the data analysis after the case study of general construction companies, the total fatality loss was estimated to be 2,198,260 USD/person. The contributions of this study are the development of a framework composed of newly discovered items that can acquire reliable data in consideration of the properties of the construction industry.


Author(s):  
Harshil Thakkar ◽  
Bhishma Pandya ◽  
Mihir Rabadiya ◽  
Rakesh Prajapati ◽  
Dhwani Thakkar

Building information (BIM) is becoming a better-known collaboration process in our construction industry. BIM is a systematic process that amalgamates all the other geometric computer-generated models, or data that creates simulations that can be used for the project manager, owners, facility manager or other parties to look after the project and deliver the project more efficiently. The implementation of BIM in India is still at a nascent stage due to a lack of knowledge of the advantages of BIM. Moreover, there have been only a few case studies conducted in India about BIM; therefore, the principal agenda of this study is to enlighten the readers about the benefits accrued if BIM is applied, in the residential project, before the construction. Hence, the authors had taken a residential project located in Gujarat, India, for a case study. The 3D and 4D models of the project were generated; 8 errors were identified that could have been detected before construction if BIM had been applied. The cost needed to make a BIM model was ₹ 171,050. Whereas, the amount that could have been saved if BIM was implemented beforehand was discovered as ₹ 246,773. Consequently, the benefits to cost ratio for two weeks in delay was determined as 1.44. It can be as the benefit of BIM for construction.


Neutron ◽  
2022 ◽  
Vol 21 (2) ◽  
pp. 52-59
Author(s):  
Liliana Hannes ◽  
Julistyana Tistogondo

Accelerating infrastructure development in Indonesia is a good thing, but this is not without problems. The COVID-19 pandemic is a problem that has a large and global impact, not least in Indonesia, especially in the construction industry sector. The construction project of the Soedono Madiun Hospital is one of the construction projects that have experienced the direct impact of the COVID-19 pandemic. Therefore, the purpose of this study is to review and analyze the impact of the covid-19 pandemic on construction projects in the case study of the construction project of the Soedono Madiun Hospital, and to find out the biggest impact of the covid-19 pandemic which has the most influence on construction projects in the case study of the construction project of the Soedono Hospital. Madison. The research method used to determine the biggest impact of the covid-19 pandemic on the cost and time aspects is the multiple linear regression analysis method with the help of Microsoft Excel. The other data analysis methods used in this study were the validity and reliability tests used in testing the questionnaire. The results of data analysis conducted in this study indicate that there are seven independent variables affect the dependent variable, namely the suitability of planning and project realization with the equation y= 94.186-0.376x1-0.108x2-1.014x3+0.873x4 for the time aspect, and the equation y=87,009 -0.0006x5-0.001x6-0.0002x7 for the cost aspect. With this equation, it can be seen that the independent variable that has the most influence on the dependent variable on the time aspect is the independent variable X3, namely the change in the time schedule due to delays in the arrival of construction materials by 1.014, while in the cost aspect is the independent variable X6, namely changes in costs due to instability. the price of construction materials is 0.001. So, it is hoped that there will be a project management handling that focuses on the most influential variable, namely construction materials.


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


2016 ◽  
Vol 10 (2) ◽  
pp. 162-171
Author(s):  
Hafid Hafid ◽  
Tatang Sutisna

The design and manufacturing of the rotary table with the specification Ø 170 mm (6 inches) for CNC machine 4 axis has been done. The objective of manufacturing a rotary table is to increase the efficiency of CNC machine Hardford 4 axis to be above 80% in line machining center CV. IM’s workshop. The engineering methods was taken, consist of: working preparation, manufacturing of working drawing, engineering process, the manufacturing and testing. The prototype has been tested and operated, the resulting of increasing productivity of which were as follows: the process of assembling was increased to be 3 time ( before 1 time) and processing time for a specific case reduced from 5 hours to 3 hours, number of operators for the case of assembling the rotary reduced to 1 person (before 4 persons), safety and security become to be better. The results show increased efficiency of CNC machine Hardford, from under 50% to be above 80%. Based on the economical analysis obtained by the cost of good sold (C.G.S) of the rotary table is IDR 34.060.000. The results presented in this paper is expected to be case study for developing a business of the metal and engineering SMEs domestic to the effort of improving efficiency, quality, productivity and competitiveness in global market.ABSTRAKPerancangan dan pembuatan alat bantu meja putar (rotary table) dengan spesifikasi teknis Ø 170 mm (6 inci) untuk mesin CNC 4 axis telah dilakukan. Tujuan pembuatan rotary table adalah untuk meningkatkan efisiensi mesin CNC Hardford 4 axis di atas 80% pada line machining center Bengkel CV. IM. Metode rancang bangun yang dilakukan, meliputi: persiapan kerja, pembuatan gambar kerja, proses engineering, pembuatan dan uji coba. Prototip tersebut telah diuji coba dan dioperasikan dengan hasil peningkatan produktivitas sebagai berikut: proses pengerjaan bongkar pasang meningkat menjadi 3 kali (sebelumnya 1 kali) dan waktu pengerjaan untuk kasus tertentu berkurang dari 5 jam menjadi 3 jam, jumlah operator untuk kasus bongkar pasang rotary berkurang menjadi 1 orang (sebelumnya 4 orang), keselamatan kerja dan keamanan menjadi lebih baik. Hasil peningkatan berupa efisiensi mesin CNC Hardford 4 axis dari sebelumnya di bawah 50% menjadi di atas 80%. Berdasarkan hasil perhitungan analisis ekonomi diperoleh harga pokok produksi (HPP) alat bantu meja putar adalah sebesar Rp. 34.060.000. Bahasan ini diharapkan menjadi contoh kasus bagi pengembangan usaha IKM logam dan mesin dalam negeri untuk meningkatkan efisiensi, mutu, produktivitas dan keunggulan daya saing di pasar global.Kata kunci: alat bantu meja putar, mesin CNC, harga pokok produksi


Author(s):  
Michael Woo ◽  
Marcos Campos ◽  
Luigi Aranda

Abstract A component failure has the potential to significantly impact the cost, manufacturing schedule, and/or the perceived reliability of a system, especially if the root cause of the failure is not known. A failure analysis is often key to mitigating the effects of a componentlevel failure to a customer or a system; minimizing schedule slips, minimizing related accrued costs to the customer, and allowing for the completion of the system with confidence that the reliability of the product had not been compromised. This case study will show how a detailed and systemic failure analysis was able to determine the exact cause of failure of a multiplexer in a high-reliability system, which allowed the manufacturer to confidently proceed with production knowing that the failure was not a systemic issue, but rather that it was a random “one time” event.


Author(s):  
V.V. Verna

The article provides a rationale for methodological approaches to assessing the effectiveness of outsourcing in organizations of the construction industry using the example of outsourcing schemes to perform personnel functions. The conditional example shows the impact of the use of outsourcing on reducing the costs of a construction organization. The main prerequisites for the use of outsourcing in the activities of enterprises in the construction industry are identified, methodological approaches to assessing the cost-effectiveness of personnel outsourcing in the construction industry enterprises are substantiated.


1992 ◽  
Vol 25 (9) ◽  
pp. 211-216
Author(s):  
A. Akyarli ◽  
Y. Arisoy

As the wave forces are the function of the wave height, period and the angle between the incoming wave direction and the axis of the discharge pipeline, the resultant wave force is directly related to the alignment of the pipeline. In this paper, a method is explained to determine an optimum pipeline route for which the resultant wave force becomes minimum and hence, the cost of the constructive measures may decrease. Also, the application of this method is submitted through a case study.


Sign in / Sign up

Export Citation Format

Share Document