scholarly journals PCA-NARX Time Series Prediction Model of Surface Settlement during Excavation of Deep Foundation Pit

Author(s):  
Qingwen Ma ◽  
Sihan Liu ◽  
Xianchang Zhao
2021 ◽  
Vol 2021 ◽  
pp. 1-7
Author(s):  
Zhouqiang Li

Taking a super large deep foundation pit project as an example, the horizontal displacement of crown beam and driveway, surface settlement, axial force of anchor cable, and underground water level in the construction process of the foundation pit are dynamically monitored and analyzed. The excavation deformation rule of the deep foundation pit and the influence of excavation on surrounding buildings are analyzed. The results show that, with the excavation of the foundation pit, the crown beam and driveway of the foundation pit incline towards the direction of the pit and eventually tend to be stable. The variation of axial force of the prestressed anchor cable in the first layer of the foundation pit is basically consistent with the variation of horizontal displacement time history. The variation trend of the groundwater level at each side of the foundation pit is different but tends to be stable in a short time. In the whole monitoring period, the cumulative settlement value of each area of the foundation pit is within the controllable range, but the surface settlement of the north side of the foundation pit and a surrounding building has not reached stability, so it is suggested to extend the monitoring time of settlement in the relevant area.


2014 ◽  
Vol 697 ◽  
pp. 530-534
Author(s):  
Yu Bo Hu ◽  
Fei Shao ◽  
Ya Xin Huang ◽  
Ya Wen Liu ◽  
Jin Jun Liang

The prediction of deformation of foundation pit’s supporting structure is the basis of construction control of deep foundation pit. Meanwhile, it is vital to the safe excavation of foundation pit. In the work, the 1st project of Huaqiao in Jiantao Square of Kunshan City is chosen. Besides, model of combination based on entropy method is built to predict the displacement of circle beam with BP neural network and ARMA time series model. Finally, the analysis shows that combination models improve overall prediction on the premise of better predicting accuracy. Thus, it is of practical value.


2021 ◽  
Vol 2021 ◽  
pp. 1-13
Author(s):  
Yunxin Zheng ◽  
Zhiping Hu ◽  
Xiang Ren ◽  
Rui Wang ◽  
Enxiang Zhang ◽  
...  

Partial supporting piles removal from deep foundation pit may lead to large-scale foundation pit collapse, resulting in severe consequences. Various studies have investigated the underpinning technology of cutting abutment piles by combining field monitoring and numerical simulation, but there are few studies on cutting supporting piles of foundation pit by the shallow excavation method. Taking an actual deep and large foundation pit as an example, the finite element method (FEM) was adopted to study the surface settlement and the changing trend of the force and displacement of the supporting pile caused by cutting piles during the shallow excavation of double tunnels. The FEM results were verified with the field monitoring data. The simulation results show that the surface settlement around the foundation pit mainly occurs at the pile cutting stage under different excavation sequences (0D, 1D, 2D), and the main distribution area is the one-fold diameter area outside the double tunnel. After the supporting piles are partially cut, the bending moment and displacement of the lower part of the broken piles differ significantly due to different excavation sequences, but the bending moment and displacement of the upper part of the broken piles are basically similar. In the process of removing the supporting piles, the Earth pressure behind the piles is redistributed, and the load is mainly transferred to the adjacent supporting piles outside the tunnel within the radius of one time of the tunnel diameter. However, the load is not evenly transferred to the adjacent supporting piles. Some recommendations for the reinforcement scheme of the supporting structure during cutting supporting piles in deep foundation pit are also proposed. The research results can provide theoretical basis and practical guidance for the construction of similar projects in the future.


Water ◽  
2021 ◽  
Vol 13 (9) ◽  
pp. 1303
Author(s):  
Chenghua Shi ◽  
Xiaohe Sun ◽  
Shengli Liu ◽  
Chengyong Cao ◽  
Linghui Liu ◽  
...  

At present, jet-grouted horizontal waterproof curtain reinforcement has become an essential method for deep foundation pit groundwater control. However, there is still a lack of an effective theoretical calculation method for horizontal waterproof curtain reinforcement, and there is little research on the seepage laws of foundation pits under different horizontal waterproof curtain conditions. Based on Darcy’s seepage theory, theoretical analysis models of deep foundation pit seepage were established considering the effect of a horizontal curtain in a highly permeable formation. Through the established models, the calculation method of the water inflow and the water pressure under the condition of a horizontal curtain was derived. Then through indoor tests, the reliability of the theoretical calculation method was verified. Furthermore, the established theoretical calculation method is used to analyze the influence of various factors on the water inflow and the water pressure, such as the ratio of hydraulic conductivity of the horizontal curtain to surrounding soil, thickness, and reinforcement position of the horizontal curtain. It is found that the hydraulic conductivity ratio has the most significant influence on the seepage characteristics of the foundation pit. Finally, the design method was applied to an example of the horizontal waterproof curtain of the foundation pit, which is located at Juyuanzhou Station in Fuzhou (China). The water inflow per unit area is 0.36 m3/d in the foundation pit, and this implies that the design method of the horizontal waterproof curtain applied for the excavation case is good and meets the requirements of design and safety.


2011 ◽  
Vol 90-93 ◽  
pp. 485-489
Author(s):  
Li Guo ◽  
Peng Li He ◽  
Guang Jun Zhang

The enclosure pile is extensively used as retaining structure in the foundation pit excavation. And it is always combined with other reinforcement measures. So it is unreasonable to a certain degree that the enclosure pile is analyzed as cantilever structure. Taken the deep foundation pit of a subway station in Hefei for instance, the effect of other reinforcement measures on restrained conditions of enclosure piles in the paper was taken into account. And the behavior of enclosure pile under various restrained conditions was analyzed. Based on that, some helpful suggestions for practical retaining structure of foundation pit were put forward.